2025 Preventative Maintenance Program

 

Location

West College Avenue, Dutton Avenue, Steele Lane, 4th Street

City or County Responsible for Project

Santa Rosa, CA

Category

Complete Streets Projects

Description

The 2025 Pavement Preventative Maintenance (PPM) Program with Complete Streets enhancements exemplify how strategic roadway improvements can safely accommodate all users of the local street system, support active transportation, and enhance community connectivity.

These projects show the recent re-commitment of City leaders to pavement maintenance and build on the City’s long-term work on Complete Streets principles that provide safe, comfortable access for people walking, biking, rolling, and taking transit of all ages and abilities. The City’s Bicycle and Pedestrian Master Plan and Vision Zero initiative guide these efforts, prioritizing infrastructure that reduces reliance on single-occupant vehicles while improving safety and access across diverse neighborhoods.

As part of the 2025 PPM Program, major arterial corridors in Santa Rosa (including West College Avenue and North Dutton Avenue) were resurfaced and restriped to reflect community- and data-driven redesigns that enhance multimodal transportation. This included reconfiguring West College Avenue with a road diet, reducing vehicle lanes to one in each direction with a center turn lane, to lower vehicle speeds, enhance predictability, and create space for six-foot-wide bike lanes with generous buffers. North Dutton Avenue saw similar Complete Streets treatments with buffered bike lanes and flexible bollards that clearly separate bikes from vehicle traffic.

Fourth Street was reconfigured from a traditional multi-lane vehicle roadway into a Complete Street with reduced vehicular lanes and Class II/IIb bike lanes spanning its length, closing critical gaps in Santa Rosa’s bicycle network. These changes directly enhance safety and comfort for people biking and walking by creating a low-stress corridor that better connects to transit, schools, neighborhoods, and commercial areas. The change also is a transition from a regional Caltrans facility into the City’s commercial business district, reenforcing the changed conditions to drivers through design.

These improvements not only extend pavement life through cost-effective maintenance strategies but also prioritize safety and multimodal access by reallocating roadway space to protected active transportation facilities and improved crossings. Each of these streets is on our High Injury Network, indicating a history of fatal or severe injury crashes.

Together, these projects demonstrate innovative application of Complete Streets principles within routine maintenance and corridor redesign, maximizing the value of existing infrastructure while providing safe multimodal options. We have more streets in need of maintenance than we have money for, and there are safety concerns all over the City. Our projects need to address more than one concern. These changes exemplify how integrated planning, community engagement, and data-informed design can transform everyday streets into places that serve all users, including cyclists, pedestrians, transit riders, and motorists, without compromising operational efficiency or fiscal stewardship.

These Complete Streets improvements are replicable models for other California cities seeking to balance safety, accessibility, sustainability, and fiscal responsibility. They further support local climate goals by encouraging travel mode shifts away from single-occupant vehicles and enhancing connectivity within the broader active transportation network.