6th Street Cycle Track
Location
6th Street, from Haven Avenue to Rochester Avenue
City or County Responsible for Project
Rancho Cucamonga
Category
Complete Streets Projects
Description
The 6th Street Cycle Track Project (Project) represents a transformative investment in the City of Rancho Cucamonga’s transportation network, one that advances safety, connectivity, and long-term stewardship of public infrastructure. Spanning 1.75 miles from Haven Avenue and Rochester Avenue, this east-west corridor connects residents to significant destinations including the Rancho Cucamonga Metrolink Station, the Resort mixed-use development, local employment centers, and the Day Creek Channel Bike Trail. The Project closes a critical east-west mobility gap, creating a safe and intuitive route for people walking and biking, while strengthening multimodal access to transit and community amenities.
The Project was completed as part of Phase II of the Metrolink Station Accessibility Improvement Project, a first/last mile initiative. San Bernardino County Transportation Authority (SBCTA) and the City of Rancho Cucamonga teamed up to deliver the project and SBCTA simultaneously partnered with four other agencies to deliver similar projects. By working together, the agencies were more competitive for the Active Transportation Program (ATP) Cycle 4 grant which was successfully funded. SBCTA served as the lead agency for the design, construction, right-of-way, and funding phases. The Project was included in the City’s ConnectRC Plan, an implementation-oriented active transportation plan that prioritizes high-impact projects designed to accelerate the development of the City’s complete streets network and make healthy, sustainable transportation options more practical and appealing in Rancho Cucamonga. This plan directly reflects the community-driven mobility vision articulated in the City’s General Plan update, PlanRC (adopted in December 2021), emphasizing safety, connectivity, transportation equity, and the creation of vibrant, people-friendly corridors.
The 6th Street Cycle Track fulfills several high priority ConnectRC goals by:
• Reducing barriers to transit access
• Enhancing first/last-mile connectivity to the Rancho Cucamonga Metrolink Station
• Closing a significant east-west bicycling gap
• Improving user safety through high-quality protected facilities
• Supporting broader climate, public health, and mobility objectives
The scope of work included construction of Class IV protected bike lanes on both sides of the corridor, resulting in a premier facility that meaningfully enhances user comfort and safety. A raised cycle track between Cleveland Avenue and Milliken Avenue greatly enhances the comfort of the facility. Additionally, protected on-street lanes with bollards provide separation from vehicles elsewhere along the corridor. This work was complemented by a series of streetscape and roadway improvements including median enhancements, cobblestone paving, updated curb and gutter, sidewalk upgrades, and refreshed striping and signage. Concurrent with SBCTA’s work, the City leveraged construction efficiencies to complete additional pavement rehabilitation in key areas within the project limits. This work restored pavement condition, extended roadway life, and ensured the new striping and protected bike facilities were installed on a well-maintained roadway surface. The Project was completed in May 2025.
The Project is part of an $11.2 million multi-city funding package, which includes the neighboring cities of Montclair, Upland, Fontana, and San Bernardino, and was primarily grant-funded through the ATP Cycle 4 and the Transit and Intercity Rail Capital Program (TIRCP) with participating cities providing the local match. The broader project and funding partnership reflects the strong regional collaboration and support for advancing multimodal and safety-oriented connectivity across San Bernardino County. For the City of Rancho Cucamonga, the final Project cost totaled $2 million, with the City contributing 25% ($488,200) of that cost and providing plan review, inspection, and long-term operations and maintenance.
The protected facility has already encouraged increased bicycling activity, and residents have reported feeling safer and more comfortable traveling along the corridor. The improvements have also contributed to slower vehicle speeds and fewer conflict between modes. Community feedback has been overwhelmingly positive, praising both the quality of the improvements and the enhanced connectivity the project brings.
The 6th Street Cycle Track exemplifies the City of Rancho Cucamonga’s commitment to delivering safe, resilient, and equitable transportation infrastructure. By modernizing a key corridor, reinforcing long-term asset preservation, and expanding choices for how residents move through their community, the project stands as a model of Complete Streets investment, one that meaningfully protects the public’s investment while shaping a healthier, more sustainable future.