Acacia Neighborhood Storm Drain and Street Reconstruction Project
Location
Project is bound by Dale Street, Stanford Avenue, Josephine Street, and Garden Grove Boulevard
City or County Responsible for Project
City of Garden Grove
Category
Complete Streets Projects
Description
The City of Garden Grove’s Acacia Neighborhood falls within the bounds of Stanford Ave., Dale St., Garden Grove Blvd., and Josephine St. The area is comprised of 8 residential blocks and seven streets. Prior to the start of this project, the Acacia Neighborhood presented several problems. There was no storm drain system in place; the streets lacked sidewalks, curbs, and gutters; and the road conditions were deemed as “failing” with PCI falling between 10-20. The neighborhood often experienced flooding during rainy seasons with residents noting that rain water came up many driveways up to their garages and into their backyards.
The Project was funded primarily by Gas Tax, SB1, Measure M2, and Water Enterprise funds, with supplemental assistance by a CDBG block grant.
The Acacia Neighborhood project was completed in two phases, first addressing drainage needs by installing a new storm drain followed by a full rehabilitation of five street segments. The rehabilitation phase was comprised of street reconstruction using full depth reclamation (FDR), and installation of sidewalks and gutters, which served to increase safety for pedestrians and drainage for storm water.
This project involved extensive planning and communication with the Acacia Neighborhood residents and required door-to-door canvasing to gain community support for the addition of the sidewalks. Public right-of-way impacts on resident properties were assessed, walls and fence-lines were removed, and landscaping was substantially modified to accommodate these changes. The project also required relocation of 30 utility poles that conflicted with street widening and reconstruction.
Amidst construction and dusty road conditions throughout this process, community members continue to support the Acacia Neighborhood project and shared their appreciation for the City’s work through verbal and written praise.
Cost for the Project was $150/sy, falling well within the complete street elements’ average cost range of $90/sy to $800/sy, demonstrating the cost-effectiveness of the Project. Following completion of the Acacia Neighborhood project, the streets now have a PCI of 100, far above Orange County’s average local PCI of 79. These improvements have drastically improved drainage, safety, and quality of life for the Acacia Neighborhood residents and will allow for effective preventative maintenance and storm water drainage in the future.
Project submitted by
Mark Uphus
Sr. Civil Engineer
Public Works- Engineering, City of Garden Grove