ARPA Road Rehabilitation Project

 

Location

Merced County: Various Locations

City or County Responsible for Project

Merced County

Category

Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects.

Description

The ARPA Road Rehabilitation Project for the County of Merced was a $13 million initiative aimed at improving over 45 miles of county roadways, enhancing both their safety and sustainability. Funded by the federal, state, and local funds, this project encompassed critical road reconstruction and overlay work across all five Board of Supervisors districts. With a focus on efficient resource use and quality construction techniques, this project displayed sustainability, safety, and cost-effectiveness in road maintenance.
The project employed several preservation methods that not only improved pavement conditions but also utilized quality engineering and materials. The scope included road dig-outs, cross-slope corrections, restoring positive drainage, and establishing roadside ditches, all designed to extend the life of the roadways. Additionally, the project involved the application of 92,000 tons of hot mix asphalt and 17,395 tons of shoulder backing, significantly contributing to improved roadway integrity across the county while also completing the project well ahead of schedule
A standout achievement was the solution to address the severe rutting and pavement sinking on Billy Wright Road, which experiences heavy truck traffic, particularly from fully loaded trucks bound for the dump at the end of Billy Wright Road. At the area with the most severe rutting, the road was superelevated, causing the weight of fully loaded trucks heading to the dump to shift toward the outer edge of the road. This edge lacked sufficient material to resist the load, as the embankment was too narrow and steep. Furthermore, the grinding process revealed clay that caused the road to pump. To overcome this, the project team repurposed the existing grindings to widen the embankment, providing the necessary material resistance and added the use of geosynthetic mesh to enhance the pavement’s strength. This solution not only resolved the issue but also kept the project on track, saving time and reducing costs by utilizing materials generated from the site itself.
The project also focused on minimizing its environmental footprint and maximizing resource efficiency. By using materials from the project site, reducing waste, and enhancing pavement strength with modern techniques, the project significantly contributed to sustainability.
Community engagement was another critical component. During construction, CCME maintained open lines of communication with residents, distributing door hangers and providing advanced notifications to minimize disruptions. Access to properties was maintained at all times, and the team addressed residents’ concerns swiftly. A particularly thoughtful intervention was the construction of a trash apron for an elderly resident, addressing the steepness of her driveway and ensuring she could easily manage her trash bins.
In summary, the ARPA Road Rehabilitation Project not only improved the safety and functionality of Merced County’s roadways but also contributed to sustainability and community well-being. Through the innovative use of materials, cost-effective management, and proactive community relations, the project exemplifies a forward-thinking approach to public works.