Arrow Highway is a heavily travelled arterial in the San Gabriel Valley which carries approximately 14,000 vehicles a day. This 1.1 mile segment of Arrow Highway is maintained primarily by the City of Azusa but also has segments that are maintained by the City of Covina and Los Angeles County Public Works. The City was able to obtain an HSIP Grant for the installation of raised medians to reduce collisions and provide refuge for pedestrians since there are only three (3) signalized intersections along this segment. Having secured this grant, the City took this as an opportunity to leverage other funding sources to make this a more complete project.
Initially the project was going to use asphalt to fill in the raised medians but that did not seem fair to the businesses and the residents on the south side of Azusa. During our community outreach, residents voiced concerns over bare medians and expressed that they wanted landscaped medians like all of the others within the City. This led the project team to incorporating drought tolerant landscaping using native species that are common in the San Gabriel Valley.
The City and LA County Public Works also determined that the asphalt pavement was in need of repair. They collaborated and determined that the best treatment was a 2” mill and overlay utilizing Asphalt Rubber Hot Mix (ARHM). The rubberized asphalt would provide a longer lasting, more durable surface. It is expected that this treatment will give the pavement a 15-20 year lifespan.
In addition to the roadway improvements, both the City of Azusa and the City of Covina used this project as an opportunity to improve pedestrian accessibility by upgrading non-compliant ADA ramps, replacing drive approaches, replacing damaged sidewalk, replacing asphalt sidewalks with PCC sidewalks, and installing high visibility crosswalks. Trees were also planted to provide more shade to pedestrians and provide a more aesthetically pleasing commute.
Finally, the City of Covina proposed to incorporate several storm water features with the installation of 6 bioswales. These bioswales will help reduce the amount of runoff entering the storm drain system that empties into the San Gabriel River. They are also more aesthetically pleasing than typical catch basins.