Artesia Great Boulevard Project

 

Location

Artesia Boulevard between Harbor Avenue/Susanna Road to Downey Avenue, Long Beach, CA

City or County Responsible for Project

City of Long Beach

Category

Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects.

Description

The Artesia Great Boulevard Project is a transformative 3.2-mile corridor improvement initiative designed to enhance safety, preservation, and sustainability in alignment with the goals of the Save California Streets Program. Spanning from Harbor Avenue/Susanna Road to Downey Avenue, the project integrates comprehensive roadway improvements, advanced traffic management systems, and sustainable urban design to create a safer, more accessible, and environmentally resilient corridor.

Key safety features include six new stamped, colored concrete crosswalks, Class IV bike lanes, traffic signals at four new intersections, additional pedestrian street lighting, upgraded ADA curb ramps, and 19 bus stops with upgraded platform accessibility, improving multimodal travel for pedestrians, cyclists, and transit users. Additionally, installing Intelligent Transportation System (ITS) technology, smart traffic signals, additional median islands, and four new changeable message signs enhances traffic flow, reduces congestion, and minimizes collision risks. These measures support the City of Long Beach’s Safe Streets Action Plan to eliminate traffic-related injuries and fatalities.

To preserve and modernize critical infrastructure, the project incorporates full-depth roadway rehabilitation, grind, and overlay with asphalt rubber hot mix (ARHM) cap, improved sidewalks and curb ramps, protected bike path bulb-outs, and cool pavement placement, ensuring long-lasting durability and compliance with accessibility standards. Furthermore, the inclusion of traffic signal enhancements, wayfinding gateway, and neighborhood signage provides intuitive navigation for all road users.

The project’s sustainability is underscored by the addition of 400 drought-tolerant trees, replacing 150 aging non-native trees to enhance the urban canopy, mitigate heat, and improve air quality. Bioretention planters have been strategically integrated to manage stormwater runoff, filter pollutants, and support groundwater recharge, reducing environmental impact. These efforts align with California’s environmental and climate goals.

By holistically addressing safety, preservation, and sustainability, the Artesia Great Boulevard Project provides a replicable model for urban corridor transformation while enhancing the quality of life for the Long Beach community. Funded through a combination of Los Angeles County Metropolitan Transportation Authority Grants and City Infrastructure Bonds, the project demonstrates cost-effective resource management and serves as a benchmark for future projects throughout the state.