Author: scs_admin

Read more

Geysers Road Bridge Replacement project over Big Sulphur Creek

  Location Los Lomas Drive, from Hall Road to Thomas Road City or County Responsible for Project Sonoma County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description The Geysers Road Bridge Replacement project over Big Sulphur Creek replaced a functionally obsolete, one-lane bridge with a new three-span concrete box girder bridge. The existing structure is a Historic County Landmark that remained in place, while the new bridge was placed downstream of the old facility. The original single-lane bridge is one span of a three-span iron truss bridge with an interesting history. Originally a railroad bridge, it was reconstructed in 1909 and placed over the Russian River near Monte Rio. In 1937, the bridge was disassembled, and one of the spans was moved and reassembled at its present location over Big Sulphur Creek, approximately 18 miles north of SR128 and 9 miles east of Cloverdale. At that […]

Read more

Potrero Gateway Streetscape Improvement Project

  Location 17th St, from Vermont St to San Bruno Ave and Vermont St, from 17th St to Mariposa St City or County Responsible for Project San Francisco Category Complete Streets Projects Description The Potrero Gateway Streetscape Improvement Project transformed a long-neglected, high-injury corridor beneath US 101 into a safe, accessible, and welcoming gateway reconnecting the Potrero Hill neighborhood. Located along 17th Street from Vermont Street to San Bruno Avenue and Vermont Street between 17th and Mariposa Streets, the project improves safety, preserves critical infrastructure, enhances environmental conditions, and delivers long-term, sustainable benefits to the surrounding community. The project site lies within San Francisco’s Vision Zero High-Injury Network, where pedestrians, bicyclists, and motorists previously faced elevated risks due to narrow sidewalks, poor lighting, deteriorated infrastructure, and freeway-related impacts. A comprehensive multimodal redesign substantially improved safety and accessibility through widened sidewalks, corner bulb-outs, protected bike lanes, pedestrian lighting, and traffic-calming features. […]

Read more

2025 Pavement Preservation Project

  Location Various location in unincorporated Yolo County City or County Responsible for Project County of Yolo Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description Yolo County’s commitment to efficient, forward-thinking, and environmentally conscious road maintenance practices is exemplified by the success of the 2025 Pavement Preservation Project (2025 PPP). Focused on enhancing the longevity of roads in the unincorporated rural communities and surrounding roads through sustainable approaches, this initiative strategically preserved existing infrastructure while applying innovative techniques to mitigate the need for constant maintenance and major rehabilitation and ultimately enhancing public Roadway safety. The 2025 PPP focused on the northwestern part of Yolo County which includes the Communities of Rumsey, Guinda, and Brooks also known as the Capay Valley and central part of the County surrounding the cities of Woodland and Davis and the communities of North Davis Meadows and Binning Tract. The project directly […]

Read more

Systemic Countywide Signalized Intersection Improvements

  Location Countywide City or County Responsible for Project Ventura County Public Works Agency Category Safety or Intelligent Transportation System Projects Description The Ventura County Public Works Agency (VCPWA) is responsible for maintaining 44 signalized intersections within the unincorporated county area. With a population of just under 1 million and growing VCPWA needed to update its old traffic signal equipment and communication system. Washed-out signal backplates were undetectable and outdated traffic signal equipment (i.e. dial up controllers) was unreliable and no longer supported. Installing high visibility signal backplates, video/radar detection cameras, high friction surface treatment (HFST), advanced traffic controllers, and wireless cellular modems will enhance the Ventura County road and traffic safety network. The Systemic Countywide Signalized Intersection Improvements (Project) is an innovative, environmentally sensitive, unremitting, reliable and cost-effective Project. The Project replaces weathered signal backplates with new yellow retroreflective border signal backplates for high visibility signalized intersections. New traffic […]

Read more

Contra Costa County Pavement Management

  Location Contra Costa County-Countywide City or County Responsible for Project Contra Costa County Category Best Pavement Practices Description The Contra Costa County (County) Public Works Department maintains more than 660 centerline miles of roadway serving diverse residential, suburban, and semi-rural communities. These roadways support commuters, residents, and recreational users accessing the County’s extensive open space and regional parks. Over the past decade, the County has delivered 18 surface treatment projects as part of a strategic Pavement Management Program focused on extending pavement service life and maximizing limited public funding. The County has determined that a preventative maintenance program utilizing multiple surface treatments is the most cost-effective approach for managing a large roadway network. Pavement conditions are evaluated annually through data-driven assessments using StreetSaver Pavement Management software, supported by Nichols Consulting Engineers, Ltd. (NCE) . In 2023, a walking survey was conducted and used to establish an area-weighted average Pavement […]

Read more

Adams Avenue/Pinecreek Drive Intersection Multimodal Improvements Project

  Location Adams Avenue/Pinecreek Drive City or County Responsible for Project City of Costa Mesa Category Complete Streets Projects Description The Adams Avenue/Pinecreek Drive Intersection Multimodal Improvements Project (Project) implemented innovative pedestrian and bicycle safety improvements at the primary entrance to Orange Coast Community College (OCC), one of the city’s busiest bicycle and pedestrian crossing locations. Historically, the City has consistently received citizen safety concerns at this intersection, related to motorist speeding and bicyclist and pedestrian crossing. Unfortunately, in February 2024, traffic violence occurred when a woman was killed by a motorist as she was crossing Adams Avenue to access a bus stop. This fatality and other crashes demonstrated the need for pedestrian improvements at the intersection. The City-adopted 2018 Active Transportation Plan and 2024 Pedestrian Master Plan documented a disproportionate number of collisions in the area, with a high occurrence of collisions involving people walking and bicycling at the […]

Read more

County of San Diego Pavement Management Program-‘Road to 70’

  Location County of San Diego Road Network City or County Responsible for Project County of San Diego, Department of Public Works Category Best Pavement Management Practices Description County of San Diego Pavement Management Program-‘Road to 70’ Best Pavement Management Practices – 2026 The County of San Diego oversees one of California’s largest local roadway networks (~1,956 centerline miles). Managing this system requires a strategic, cost-effective approach that preserves pavement conditions, minimizes long-term costs, and supports community mobility. By the early 2010s, we faced a troubling reality: our network had declined from PCI 71 to 60 with no reversal in sight. Before 2017 our annual funding was around $5-$7 million. Leadership recognized incremental fixes wouldn’t solve the problem. In 2017, we formalized “Road to 70”an ambitious program to restore our network to PCI 70, backed by $70 million annually based on SB-1(Road Repair & Accountability Act) funding. We had been […]

Read more

Imperial Highway Corridor Capacity Enhancements Project

  Location Imperial Highway from Atlantic Avenue to the east City limit City or County Responsible for Project City of Lynwood Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Imperial Highway Corridor Capacity Enhancements Project represented a critical investment in traffic safety, congestion relief, and operational efficiency along one of the City of Lynwood’s most heavily traveled corridors. Delivered through a partnership between the City of Lynwood and the Los Angeles County Metropolitan Transportation Authority, the project was funded through Measure R grant funding and constructed at a total cost of $3,978,518.48. The approximately 1 mile project extended along Imperial Highway from Atlantic Avenue to the east City limit, an area experiencing high traffic volumes due to its direct connection to the I 710 freeway. The corridor serves as a major regional route and required targeted improvements to enhance capacity, reduce conflicts, and improve overall […]

Read more

Fanny Bridge Community Revitalization Project

  Location Tahoe City, CA (just south of SR-89 and SR-28 intersection) City or County Responsible for Project Placer County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description The State Route (SR) 89 Fanny Bridge Community Revitalization Project in Tahoe City is a critical transportation improvement project. The project was envisioned and underwent initial planning as far back as the 1990s; local, State, and Federal partners have collaborated closely to deliver this project. The project seeks to improve pedestrian and bicycle mobility as well as provide improved traffic circulation, evacuation, safety, and transit connections. The full project scope includes a new bypass segment of State Route 89 with a new bridge crossing the Truckee River downstream of Fanny Bridge along with roundabouts on the east and west ends of a new bypass that has been key to managing traffic during the Fanny Bridge closure. The Truckee […]

Read more

Avenida Encinas Coastal Rail Trail and Pedestrian Improvements – Segment 2 Project

  Location Avenida Encinas from Poinsettia Regional Coaster Station to Carlsbad Boulevard City or County Responsible for Project City of Carlsbad Category Complete Streets Projects Description The Avenida Encinas Coastal Rail Trail and Pedestrian Improvements – Segment 2 Project represents a transformative Complete Streets investment that enhances safety, accessibility, multimodal connectivity, and roadway quality along a key coastal corridor in the City of Carlsbad. Designed as part of the broader region-wide Coastal Rail Trail, this 3.8-mile segment extends from the Poinsettia Regional Coaster Station to Carlsbad Boulevard, filling a critical active-transportation gap and connecting transit riders, bicyclists, pedestrians, and motorists to local destinations, employment centers, and the larger regional trail network. Project submitted by     Name Mariel Cairns Job Title Principal Engineer Organization City of Carlsbad Address 1635 Faraday Avenue Email mariel.cairns@carlsbadca.gov Phone 760-473-6112

Account details will be confirmed via email.