Avenue 25 Bridge Replacement at Ash Slough

 

Location

The Avenue 25 Bridge Replacement project is in Madera County Supervisorial District 2, approximately 0.5 miles west of Road 13 in northwest Madera County

City or County Responsible for Project

Madera County

Category

Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects

Description

The Avenue 25 Bridge Replacement at Ash Slough Project creek exemplifies innovative and sustainable practices in bridge construction. Federally funded through HBP funds, this $4.5 million project involved replacing a structurally deficient 343-foot, 16-span continuous cast-in-place reinforced concrete slab bridge with a more durable, sustainable 320-foot, 9-span CIP reinforced concrete slab bridge.
The project utilized several features to reduce material, increase flexibility, and increase efficiency. Pipe pin connectors were used to connect the Superstructure and Substructure. This eliminated the need for drop caps and minimizes stress on the foundation during seismic events. This feature minimizes the foundation size and increases the speed of falsework installation, both of which reduces material, working days required to build the project, and cost. Additionally, CIDH piles and high-strength fiber-reinforced concrete with shrinkage-reducing admixture to improve the longevity and durability of the new bridge. The choice of these materials was aimed at enhancing the bridge’s resistance to weathering, reducing future maintenance costs, and extending the bridge’s lifespan, thus enhancing sustainability. Additionally, the use of wet specification CIDH piles to keep ground and perched water from entering the pile shaft during drilling and concrete placement operations helped to enhance structural integrity.
One of the challenges faced during this project was the narrow and long project site, which presented complexities in concrete delivery and placement. To address these challenges, multiple concrete staging areas and pumps were strategically placed to facilitate concrete placement from both sides of the bridge structure. This ensured that concrete could be poured efficiently, despite logistical hurdles, without compromising the quality of the finish. The remote nature of the site also required precise timing for concrete placement to prevent issues with workability and set time. The most difficult challenge was the delayed start due to nesting birds, which was addressed by proactive measures, including close coordination with a biologist to ensure minimal disruption to local wildlife while continuing monitoring reduced the delay impact.
Environmental sustainability was a primary focus throughout the project. The use of EFCO Column Brackets elevated falsework above the creek channel and the 100-year flood elevation, ensuring compliance with flood protection regulations while minimizing environmental impact. Close collaboration with the Central Valley Flood Protection Board provided the necessary documentation to assess channel flow capabilities and ensure minimal disruption to the surrounding ecosystem. Specific measures were taken to prevent cementitious materials from entering the Ash Slough, including the use of mortar-tight forms and plastic drip covers. These efforts reflect the project’s commitment to preserving water quality and meeting environmental regulations.
Overall, the Avenue 25 Bridge replacement project is an example of how sustainable construction practices can be employed in challenging locations while still optimizing time and long-term maintenance costs.