Local Project Listings
Geysers Road Bridge Replacement project over Big Sulphur Creek
Location Los Lomas Drive, from Hall Road to Thomas Road City or County Responsible for Project Sonoma County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description The Geysers Road Bridge Replacement project over Big Sulphur Creek replaced a functionally obsolete, one-lane bridge with a new three-span concrete box girder bridge. The existing structure is a Historic County Landmark that remained in place, while the new bridge was placed downstream of the old facility. The original single-lane bridge is one span of a three-span iron truss bridge with an interesting history. Originally a railroad bridge, it was reconstructed in 1909 and placed over the Russian River near Monte Rio. In 1937, the bridge was disassembled, and one of the spans was moved and reassembled at its present location over Big Sulphur Creek, approximately 18 miles north of SR128 and 9 miles east of Cloverdale. At that
Potrero Gateway Streetscape Improvement Project
Location 17th St, from Vermont St to San Bruno Ave and Vermont St, from 17th St to Mariposa St City or County Responsible for Project San Francisco Category Complete Streets Projects Description The Potrero Gateway Streetscape Improvement Project transformed a long-neglected, high-injury corridor beneath US 101 into a safe, accessible, and welcoming gateway reconnecting the Potrero Hill neighborhood. Located along 17th Street from Vermont Street to San Bruno Avenue and Vermont Street between 17th and Mariposa Streets, the project improves safety, preserves critical infrastructure, enhances environmental conditions, and delivers long-term, sustainable benefits to the surrounding community. The project site lies within San Francisco’s Vision Zero High-Injury Network, where pedestrians, bicyclists, and motorists previously faced elevated risks due to narrow sidewalks, poor lighting, deteriorated infrastructure, and freeway-related impacts. A comprehensive multimodal redesign substantially improved safety and accessibility through widened sidewalks, corner bulb-outs, protected bike lanes, pedestrian lighting, and traffic-calming features.
2025 Pavement Preservation Project
Location Various location in unincorporated Yolo County City or County Responsible for Project County of Yolo Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description Yolo County’s commitment to efficient, forward-thinking, and environmentally conscious road maintenance practices is exemplified by the success of the 2025 Pavement Preservation Project (2025 PPP). Focused on enhancing the longevity of roads in the unincorporated rural communities and surrounding roads through sustainable approaches, this initiative strategically preserved existing infrastructure while applying innovative techniques to mitigate the need for constant maintenance and major rehabilitation and ultimately enhancing public Roadway safety. The 2025 PPP focused on the northwestern part of Yolo County which includes the Communities of Rumsey, Guinda, and Brooks also known as the Capay Valley and central part of the County surrounding the cities of Woodland and Davis and the communities of North Davis Meadows and Binning Tract. The project directly
Systemic Countywide Signalized Intersection Improvements
Location Countywide City or County Responsible for Project Ventura County Public Works Agency Category Safety or Intelligent Transportation System Projects Description The Ventura County Public Works Agency (VCPWA) is responsible for maintaining 44 signalized intersections within the unincorporated county area. With a population of just under 1 million and growing VCPWA needed to update its old traffic signal equipment and communication system. Washed-out signal backplates were undetectable and outdated traffic signal equipment (i.e. dial up controllers) was unreliable and no longer supported. Installing high visibility signal backplates, video/radar detection cameras, high friction surface treatment (HFST), advanced traffic controllers, and wireless cellular modems will enhance the Ventura County road and traffic safety network. The Systemic Countywide Signalized Intersection Improvements (Project) is an innovative, environmentally sensitive, unremitting, reliable and cost-effective Project. The Project replaces weathered signal backplates with new yellow retroreflective border signal backplates for high visibility signalized intersections. New traffic
Contra Costa County Pavement Management
Location Contra Costa County-Countywide City or County Responsible for Project Contra Costa County Category Best Pavement Practices Description The Contra Costa County (County) Public Works Department maintains more than 660 centerline miles of roadway serving diverse residential, suburban, and semi-rural communities. These roadways support commuters, residents, and recreational users accessing the County’s extensive open space and regional parks. Over the past decade, the County has delivered 18 surface treatment projects as part of a strategic Pavement Management Program focused on extending pavement service life and maximizing limited public funding. The County has determined that a preventative maintenance program utilizing multiple surface treatments is the most cost-effective approach for managing a large roadway network. Pavement conditions are evaluated annually through data-driven assessments using StreetSaver Pavement Management software, supported by Nichols Consulting Engineers, Ltd. (NCE) . In 2023, a walking survey was conducted and used to establish an area-weighted average Pavement
Adams Avenue/Pinecreek Drive Intersection Multimodal Improvements Project
Location Adams Avenue/Pinecreek Drive City or County Responsible for Project City of Costa Mesa Category Complete Streets Projects Description The Adams Avenue/Pinecreek Drive Intersection Multimodal Improvements Project (Project) implemented innovative pedestrian and bicycle safety improvements at the primary entrance to Orange Coast Community College (OCC), one of the city’s busiest bicycle and pedestrian crossing locations. Historically, the City has consistently received citizen safety concerns at this intersection, related to motorist speeding and bicyclist and pedestrian crossing. Unfortunately, in February 2024, traffic violence occurred when a woman was killed by a motorist as she was crossing Adams Avenue to access a bus stop. This fatality and other crashes demonstrated the need for pedestrian improvements at the intersection. The City-adopted 2018 Active Transportation Plan and 2024 Pedestrian Master Plan documented a disproportionate number of collisions in the area, with a high occurrence of collisions involving people walking and bicycling at the
County of San Diego Pavement Management Program-‘Road to 70’
Location County of San Diego Road Network City or County Responsible for Project County of San Diego, Department of Public Works Category Best Pavement Management Practices Description County of San Diego Pavement Management Program-‘Road to 70’ Best Pavement Management Practices – 2026 The County of San Diego oversees one of California’s largest local roadway networks (~1,956 centerline miles). Managing this system requires a strategic, cost-effective approach that preserves pavement conditions, minimizes long-term costs, and supports community mobility. By the early 2010s, we faced a troubling reality: our network had declined from PCI 71 to 60 with no reversal in sight. Before 2017 our annual funding was around $5-$7 million. Leadership recognized incremental fixes wouldn’t solve the problem. In 2017, we formalized “Road to 70”an ambitious program to restore our network to PCI 70, backed by $70 million annually based on SB-1(Road Repair & Accountability Act) funding. We had been
Imperial Highway Corridor Capacity Enhancements Project
Location Imperial Highway from Atlantic Avenue to the east City limit City or County Responsible for Project City of Lynwood Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Imperial Highway Corridor Capacity Enhancements Project represented a critical investment in traffic safety, congestion relief, and operational efficiency along one of the City of Lynwood’s most heavily traveled corridors. Delivered through a partnership between the City of Lynwood and the Los Angeles County Metropolitan Transportation Authority, the project was funded through Measure R grant funding and constructed at a total cost of $3,978,518.48. The approximately 1 mile project extended along Imperial Highway from Atlantic Avenue to the east City limit, an area experiencing high traffic volumes due to its direct connection to the I 710 freeway. The corridor serves as a major regional route and required targeted improvements to enhance capacity, reduce conflicts, and improve overall
Fanny Bridge Community Revitalization Project
Location Tahoe City, CA (just south of SR-89 and SR-28 intersection) City or County Responsible for Project Placer County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description The State Route (SR) 89 Fanny Bridge Community Revitalization Project in Tahoe City is a critical transportation improvement project. The project was envisioned and underwent initial planning as far back as the 1990s; local, State, and Federal partners have collaborated closely to deliver this project. The project seeks to improve pedestrian and bicycle mobility as well as provide improved traffic circulation, evacuation, safety, and transit connections. The full project scope includes a new bypass segment of State Route 89 with a new bridge crossing the Truckee River downstream of Fanny Bridge along with roundabouts on the east and west ends of a new bypass that has been key to managing traffic during the Fanny Bridge closure. The Truckee
Avenida Encinas Coastal Rail Trail and Pedestrian Improvements – Segment 2 Project
Location Avenida Encinas from Poinsettia Regional Coaster Station to Carlsbad Boulevard City or County Responsible for Project City of Carlsbad Category Complete Streets Projects Description The Avenida Encinas Coastal Rail Trail and Pedestrian Improvements – Segment 2 Project represents a transformative Complete Streets investment that enhances safety, accessibility, multimodal connectivity, and roadway quality along a key coastal corridor in the City of Carlsbad. Designed as part of the broader region-wide Coastal Rail Trail, this 3.8-mile segment extends from the Poinsettia Regional Coaster Station to Carlsbad Boulevard, filling a critical active-transportation gap and connecting transit riders, bicyclists, pedestrians, and motorists to local destinations, employment centers, and the larger regional trail network. Project submitted by Name Mariel Cairns Job Title Principal Engineer Organization City of Carlsbad Address 1635 Faraday Avenue Email mariel.cairns@carlsbadca.gov Phone 760-473-6112
Iron Horse Trail Bicycle and Pedestrian Overcrossing at Bollinger Canyon Road
Location San Ramon, CA City or County Responsible for Project City of San Ramon Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description The $29M Iron Horse Trail Bicycle and Pedestrian Overcrossing at Bollinger Canyon Road is a 340-foot, cable-stayed bridge that provides a safe, grade-separated crossing over one of San Ramon’s busiest corridors. Anchored by 900 feet of MSE wall approaches, it eliminates a previously signaled crossing and completes a vital link in the 30-mile regional Iron Horse Trail system. The new bridge serves as a both a physical and symbolic gateway at the heart of the city defined by a V-shaped steel pylon and bent steel edge girders, connecting City Hall, the library, Bishop Ranch, and the City Center development. The design emphasized constructability, fabrication efficiency, and minimal field disruption. Key strategies, such as simple foundations, modular steel plate components, full-depth precast deck panels,
Pleasant Grove Boulevard Widening Project
Location Pleasant Grove Boulevard between Foothills Boulevard and Woodcreek Oaks Boulevard City or County Responsible for Project City of Roseville Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Urban arterial roadways must balance long-term mobility needs with fiscal responsibility, environmental stewardship, and constructability. Pleasant Grove Boulevard in Roseville, California, exemplifies how early planning, adaptive engineering, and coordinated infrastructure investment can produce a sustainable and efficient transportation corridor. From its original conception in the late 1980s through its most recent widening completed in 2025, the roadway’s evolution demonstrates how foresight and resource-conscious decision-making can minimize waste, reduce lifecycle costs, and extend infrastructure service life while accommodating growth. Pleasant Grove Boulevard is a multi-lane arterial that provides a critical east–west connection between West Roseville, State Route 65, and the City of Rocklin. Along its length, the roadway varies between four and six travel lanes, reflecting both historic
Beaumont Second Street Extension
Location Second Street (Pennsylvania Ave. to Shopping Center) City or County Responsible for Project Beaumont Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Project Scope: The Second Street Extension (Project) improvements included widening and extending Second Street approximately 2,500 feet from the current terminus at the westerly boundary to Pennsylvania Avenue. The scope of work included the construction of new culverts, storm drains, catch basins, curb and gutter, and sidewalks on the south side of the proposed extension, as well as asphalt paving, new raised medians with xeriscaping, double-armed LED streetlights, signing, and striping. Second Street will be a secondary street standard with four travel lanes, two in each direction, and a pavement width of 64 feet. Right-of-Way: Right-of-way constraints were identified early through a comprehensive alignment and record review. This analysis revealed that the existing right-of-way along the westerly and northern boundaries of the
Las Lomas Drive Bicycle Lane and Pedestrian Project
Location Los Lomas Drive, from Hall Road to Thomas Road City or County Responsible for Project Monterey County Category Complete Streets Projects Description The Las Lomas Drive Bicycle Lane and Pedestrian Project improved the connectivity of the disadvantaged community of Las Lomas by improving safe access for bicyclists and pedestrians, especially students, complying with ADA requirements, providing air quality benefits that enhanced public health, and achieving greenhouse gas reduction by increasing biking and walking trips. Initially, there were no sidewalks, shoulders, or bike lanes along Los Loma Drive, which caused unsafe conditions between vehicular users and pedestrians and bicyclists. The project widened the roadway to accommodate two 11-foot-wide travel lanes, added striping and signage, including a crosswalk at an intersection, and safer access to the only local market and other key destinations such as schools, bus stops, and community and employment centers. In addition to the widening, project features
North State Street Bridge Replacement over Ackerman Creek
Location North State Street City or County Responsible for Project Mendocino County Category Complete Streets Projects Description The North State Street at Ackerman Creek Bridge Replacement Project transformed a long-standing safety bottleneck along the busiest county-maintained roadway in Mendocino County. This corridor serves as a primary community spine and the main route to the local junior college, carrying high daily volumes of vehicles, bicyclists, and pedestrians. For years, the bridge was the weakest link in an otherwise improved corridor. Although roadway widening on both approaches was completed in 2009, the bridge constraint remained. Its crowned roadway profile limited sight distance and created hazardous conditions for vehicles pulling out of a heavily used adjacent parking lot. The old bridge provided no sidewalks or bicycle lanes and only narrow two-foot shoulders, forcing people into close proximity with traffic and contributing to a relatively high collision rate. The project replaced a scour-vulnerable
Santa Cruz Coastal Rail Trail Segment 7
Location Natural Bridges Dr to Pacific Ave/Santa Cruz Wharf and San Lorenzo Bridge; Santa Cruz, CA City or County Responsible for Project City of Santa Cruz Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Santa Cruz Coastal Rail Trail Segment 7 Phase 2 represents a highly efficient and sustainable transportation infrastructure project that transformed a constrained rail corridor into a durable, low-stress multimodal route while addressing complex environmental and construction challenges. Led by the City of Santa Cruz, this project closed a critical 0.8-mile gap between Bay Street and Pacific Avenue, completing the final link needed to create a continuous bicycle and pedestrian connection from Natural Bridges to the San Lorenzo River and the broader regional trail network. Segment 7 Phase 2 functions as a reconstructed transportation corridor that prioritizes long-term performance, safety, and climate resilience. More than a recreational trail, it provides a
6th Street Pedestrian Safety Project
Location 6th Street from Market to Howard City or County Responsible for Project City and County of San Francisco Category Complete Streets Projects Description The 6th Street corridor exhibits one of the highest concentrations of severe and fatal pedestrian collisions in San Francisco. 6th Street is classified as a High Injury Network street by the SFMTA and the San Francisco Department of Public Health. This is a key project in the City’s focus on Vision Zero – the City’s goal of reducing all traffic deaths to zero by 2024. The primary goals of the project are to Improve safety for all street users, including pedestrians, cyclists, and motorists; and to create a safe and inviting public space for all people who live, work, or visit 6th Street. This complete streets project underwent extensive community outreach and planning starting with a series of open house meetings in 2013, followed by
Honey Run Covered Bridge
Location 1670 Honey Run Road, Chico, CA City or County Responsible for Project Butte County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description The Honey Run Covered Bridge Reconstruction Project involved the restoration and rebuilding of the historic Honey Run Covered Bridge, which was destroyed during the 2018 Camp Fire. Originally constructed in 1887, the bridge is a significant cultural, historical, and recreational landmark in Butte County and was one of the few remaining covered bridges in California. The project scope included the reconstruction of the bridge using historically accurate design, materials, and craftsmanship, while incorporating modern engineering standards to improve structural integrity, seismic resilience, and fire resistance. The reconstructed bridge maintained its original architectural character and dimensions, ensuring compliance with historic preservation guidelines. Key components of the project included site preparation; fabrication and installation of timber structural elements; construction of bridge decking, trusses, siding,
City of Pittsburg Pavement Management Program
Location Citywide City or County Responsible for Project City of Pittsburg Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description In order to create a systematic and sustainable approach for maintaining 175-mile roadway network, the City of Pittsburg recently divided its roadway system into 10 pavement management zones. This zone-based approach enables more efficient use of financial resources while reducing the frequency of construction-related disruptions in neighborhoods. Our 10-year pavement management plan is maintained and updated annually, with zones evaluated for inclusion or rescheduling based on performance and deterioration trends. Pittsburg’s goal is to pave or resurface streets in these zones once every 10 years. The City of Pittsburg has prioritized transparent and proactive communication of its Pavement Management Plan to the public. City staff developed a dedicated website to clearly explain the plan, its goals, and its implementation timeline. In addition, the City hosted ten
El Camino Real Downtown Infrastructure Enhancement Plan
Location El Camino Real from Highway 41 to Rosario Avenue City or County Responsible for Project City of Atascadero Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The City of Atascadero’s El Camino Real Downtown Infrastructure Enhancement Plan was an efficient and sustainable reconstruction of a nearly 100-year-old historic highway through the downtown. Constructed in the 1930’s as part of the original Highway 101 corridor, El Camino Real still had remnants of its highway origins with a car centric character including two lanes in each direction and a center lane. This City project originated as a traffic calming study and evolved into a “road diet” through downtown that reduced the number of vehicle lanes, added parking and a more inviting flexible space for events in the street center, provided enhanced bicycle facilities on the road, and promoted safer pedestrian crossings. Throughout planning, design, and construction,
HSIP Traffic Safety & Signal Improvement Project
Location Citywide, +20 locations City or County Responsible for Project City of West Sacramento Category Safety or Intelligent Transportation System Projects Description The City of West Sacramento has completed its Citywide Safety and Signal Improvement initiative, a federally funded effort supported by the Highway Safety Improvement Program (HSIP). The primary goal was to enhance safety for both vehicles and pedestrians along high-risk streets and intersections. This initiative brings targeted upgrades designed to reduce collisions, improve visibility, and enhance pedestrian access at more than twenty locations throughout the community. Planning was guided by the City’s Systemic Safety Analysis Report, which identified high-risk corridors and intersections. The four highest-ranked areas included West Capitol Avenue, Jefferson Boulevard, Harbor Boulevard, and Sacramento Avenue. Based on these findings and state-approved safety countermeasures, the City refined the scope of work by evaluating feasibility, anticipated safety benefits, and opportunities to align with future infrastructure improvements. Strong
Los Verjeles Road Bridge Replacement
Location Los Verjeles Road over South Honcut Creek City or County Responsible for Project Yuba County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description The Los Verjeles Road Bridge Replacement Project addressed critical structural deficiencies of a 1940-era single-span bridge located approximately 4.5 miles northeast of Loma Rica, spanning both Yuba and Butte Counties. The original bridge, with a sufficiency rating of 28.3, had become functionally obsolete and load-limited, creating safety risks for residents, commercial traffic, and emergency responders. Its deteriorated condition threatened mobility along this vital rural corridor, affecting communities in both counties. The project replaced the aging structure with a modern reinforced concrete bridge measuring approximately 110 feet in length and 36 feet in width, featuring two 12-foot travel lanes with 4-foot shoulders. Roadway approaches were reconstructed and widened to improve alignment, sight distance, and geometry. Retaining walls and Mechanically Stabilized Earth (MSE)
San Fernando Beautification Project, Phase I
Location San Fernando Road, between Elk Avenue and Grandview Avenue City or County Responsible for Project City of Glendale Category Complete Streets Projects Description The San Fernando Road Beautification Project, Phase I includes construction of 17,900 square feet of center median islands, surface grinding and placement of 1.6 centerline miles of asphalt rubber hot mix, installation of 8,500 linear feet of new class II bicycle lane and class III bicycle route, modification of 12 intersections to meet current ADA standards and improve pedestrian safety, install drought-tolerant landscaping and stormwater filtration and infiltration systems, and installation of creative crosswalks and decorative fencing. San Fernando Road serves as a key connector between industrial and commercial areas and residential neighborhoods in southwest Glendale. It also functions as a vital north-south route, providing a bypass to the I-5 Freeway as well as connecting Burbank and Los Angeles. The Project stands out by not
Downtown Glendale Signal Mobility and Improvements Project
Location N’LY of Harvard St. to SL’Y of Doran St. and E’LY of Orange St. to W’LY of Glendale Ave City or County Responsible for Project City of Glendale Category Safety or Intelligent Transportation System Projects Description This Project involved the installation of PVC conduit and fiber optic, new Accessible Pedestrian Systems (APS) push buttons; new LED safety lights, new Video Detection Camera, new Controller Cabinet, and other various critical signal hardware upgrades. Downtown Glendale is a bustling district located in the heart of the fourth largest city in Los Angeles County. The area boasts a plethora of shopping, dining, and entertainment options, as well as small and large business headquarters. However, the high volume of traffic and tightly spaced signalized corridors present safety and mobility concerns. To address these issues, the Downtown Glendale Signal Mobility Improvement Project aims to enhance pedestrian safety, improve mobility, and address traffic concerns.
Community Beautification Project
Location Concord Street – Fairmont Avenue to Glenoaks Boulevard; Patterson Avenue – Concord Street to E’ly Terminus; Acacia Avenue – S. Glendale Avenue to S. Chevy Chase Drive; Greydale Drive – Patterson Avenue to N’ly Terminus; Mariposa Street – Acacia Avenue to E. Chevy Chase Drive; Boynton Street – Acacia Avenue to E. Palmer Avenue; Fairmont Avenue – Concord Street to Chester Street; Chester Street – Fairmont Avenue to Patterson Avenue; Intersection of Loraine Street and Columbus Avenue City or County Responsible for Project City of Glendale Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Community Beautification Project was a comprehensive infrastructure improvement effort that advanced the Save California Streets Program’s goals of safety, preservation, and sustainability. The project included resurfacing eight streets; selective replacement of sidewalks, curbs and gutters, cross gutters, driveway approaches, and alley aprons; installation of new curb ramps meeting federal
Rancho Del Mar Pavement and Utility Improvements Project
Location Rancho Del Mar subdivision, American Canyon City or County Responsible for Project City of American Canyon Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Rancho Del Mar Paving and Utility Improvements Project revitalized one of American Canyon’s oldest neighborhoods, originally developed in the 1950s. Decades of deferred maintenance had left streets in poor condition and water and sewer systems outdated, creating challenges for safety, accessibility, and long-term infrastructure reliability. This project addressed these needs comprehensively, transforming the neighborhood’s streets while setting a model for sustainable, cost-effective infrastructure rehabilitation. The project’s approach combined innovation and sustainability. On Rio Del Mar, 2,395 linear feet of roadway underwent Full-Depth Reclamation with Cement (FDR-C), recycling 100% of the existing asphalt and base course in place. This method reduced landfill waste, conserved natural resources, and lowered the project’s carbon footprint compared to traditional “remove and replace” techniques. In
6th Street Cycle Track
Location 6th Street, from Haven Avenue to Rochester Avenue City or County Responsible for Project Rancho Cucamonga Category Complete Streets Projects Description The 6th Street Cycle Track Project (Project) represents a transformative investment in the City of Rancho Cucamonga’s transportation network, one that advances safety, connectivity, and long-term stewardship of public infrastructure. Spanning 1.75 miles from Haven Avenue and Rochester Avenue, this east-west corridor connects residents to significant destinations including the Rancho Cucamonga Metrolink Station, the Resort mixed-use development, local employment centers, and the Day Creek Channel Bike Trail. The Project closes a critical east-west mobility gap, creating a safe and intuitive route for people walking and biking, while strengthening multimodal access to transit and community amenities. The Project was completed as part of Phase II of the Metrolink Station Accessibility Improvement Project, a first/last mile initiative. San Bernardino County Transportation Authority (SBCTA) and the City of Rancho Cucamonga
Steele Lane Safety Improvements
Location Steele Lane from Meyers Drive to Mendocino Avenue City or County Responsible for Project Santa Rosa, CA Category Safety or Intelligent Transportation System Projects Description The Steele Lane Safety Improvement Project demonstrates the City of Santa Rosa’s commitment to advancing safety and multimodal accessibility on a high-injury corridor. Steele Lane, particularly the segment adjacent to Steele Lane Elementary School, has a documented history of serious bicycle and pedestrian collisions—a concern amplified by the corridor’s role as a busy connector near a Highway 101 interchange and its 35 mph posted speed limit. Prioritizing safety, the City implemented a data-driven pilot study to test innovative road configurations and evaluate impacts on vehicle speeds, multimodal interactions, and school access. The pilot project used tactical, flexible design elements—including a road diet, lane reallocation, and buffered/protected bike space—to create safer conditions for students, families, and all road users while carefully monitoring travel times
2025 Preventative Maintenance Program
Location West College Avenue, Dutton Avenue, Steele Lane, 4th Street City or County Responsible for Project Santa Rosa, CA Category Complete Streets Projects Description The 2025 Pavement Preventative Maintenance (PPM) Program with Complete Streets enhancements exemplify how strategic roadway improvements can safely accommodate all users of the local street system, support active transportation, and enhance community connectivity. These projects show the recent re-commitment of City leaders to pavement maintenance and build on the City’s long-term work on Complete Streets principles that provide safe, comfortable access for people walking, biking, rolling, and taking transit of all ages and abilities. The City’s Bicycle and Pedestrian Master Plan and Vision Zero initiative guide these efforts, prioritizing infrastructure that reduces reliance on single-occupant vehicles while improving safety and access across diverse neighborhoods. As part of the 2025 PPM Program, major arterial corridors in Santa Rosa (including West College Avenue and North Dutton Avenue)
Hearn Avenue Overcrossing Interchange Replacement
Location Hearn Avenue between Santa Rosa Avenue and Corby Avenue City or County Responsible for Project Santa Rosa, CA Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description The Hearn Avenue Interchange project represents a significant investment in efficient, sustainable, and multimodal transportation infrastructure that enhances mobility, safety, and connectivity for all users while demonstrating resource-efficient design and construction. As a collaborative effort among the City of Santa Rosa, Caltrans, and the Sonoma County Transportation Authority (SCTA), this $43.7 million regional multimodal interchange reconstruction project replaced an aging and constrained overcrossing with a modern, resilient structure that supports vehicle, bicycle, and pedestrian travel and reinforces community and economic vitality. The project demolished and rebuilt the Hearn Avenue interchange over U.S. Highway 101, increasing vertical clearance, widening to two travel lanes in each direction, and adding a center median, ADA-compliant sidewalks, and protected Class IV and Class
Santa Rosa Avenue Corridor Improvements
Location Santa Rosa Avenue (Sonoma Avenue to SR-12) City or County Responsible for Project Santa Rosa, CA Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Santa Rosa Avenue Corridor Improvements project transformed a critical urban arterial into a safer, more efficient, and sustainable multimodal corridor that better serves the community’s transportation needs while preserving finite resources and reducing environmental impacts. This strategically planned and executed project exemplifies efficient use of materials, enhanced mobility, and forward-looking design that aligns with local and statewide sustainability goals. Santa Rosa Avenue is a key connector between commercial districts and residential neighborhoods. Prior to improvements, the corridor lacked consistent pedestrian access, safe bicycle facilities, and transit-friendly operations. This project addressed these deficiencies comprehensively by adding and enhancing pedestrian walkways, upgrading ADA ramps to current accessibility standards, and closing critical gaps in the Class II bike lane network with buffered
Seventh Street Traffic Signal Modifications
Location B Street to Lorene Drive City or County Responsible for Project City of Victorville Category Safety or Intelligent Transportation System Projects Description The Seventh Street Traffic Signal Modifications Project delivered transformative safety upgrades along the historic Seventh Street corridor by modernizing traffic signals, lighting, and pedestrian/bike detection systems. Improvements included mast arms for greater visibility, advanced video detection, upgraded pedestrian crossing systems, and enhanced emergency vehicle priority. By leveraging cost-effective technology and agency collaboration, the project not only addressed a corridor with a history of high collision rates but also improved mobility, accessibility, and safety for all roadway users in the heart of Victorville. What sets this project apart is its comprehensive modernization of one of Victorville’s most vital corridors Seventh Street, part of iconic Route 66. Unlike traditional resurfacing or repair projects, this effort fully reimagined traffic safety by introducing mast arms where none previously existed, dramatically
Carson Street Beautification Project (Phase ll)
Location Carson Street between Norwalk Boulevard and Bloomfield Avenue City or County Responsible for Project City of Hawaiian Gardens Description Carson Street is a vital corridor in Hawaiian Gardens, accommodating roughly 50,000 vehicles daily. The Beautification Phase ll project along Carson Street, between Norwalk Boulevard and Bloomfield Avenue, included a comprehensive range of infrastructure and aesthetic upgrades that shape a welcoming, connected, and pedestrian-friendly environment. Street improvements involved cold milling of existing asphalt concrete (AC) pavement, followed by an AC overlay for smoother roadway surface conditions. The project included upgrading traffic infrastructure, such as new traffic signal loop detectors, updated traffic striping, signage, and pavement markings. Construction of ADA-compliant curb ramps, curbs and gutters, sidewalks, and driveway approaches, as well as installation of pedestrian lighting improves safety, visibility, and accessibility for all. New bus shelters were installed to provide protection from the elements, making transit use more comfortable. Aesthetic
Green Valley Road Multi-Use Path Project
Location Green Valley Road (Holohan Rd to Mesa Verde Dr) City or County Responsible for Project County of Santa Cruz Category Complete Streets Projects Description This project constructed a 2-mile long 8’-10’ wide paved bike and pedestrian pathway along a very busy roadway in an underserved community with a very high usage rate of these types of transportation. The path created five upgraded Santa Cruz METRO bus stops complete with new shelters, landscaping, and art installations including professional art as well as elements provided by the local elementary school students. The project also provided new roadway striping for lane lines, bike lanes with green enhancements, and improved visibility crosswalks. This corridor had a history of accidents involving bikes or pedestrians prior to the project, with 3 severe injuries and two fatalities in recent years. The project creates a connection between the City of Watsonville and the residential neighborhoods along
Beaumont Citywide Street Rehabilitation and Maintenance Program
Location Throughout the City City or County Responsible for Project City of Beaumont Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description Program Scope: The Citywide Street Rehabilitation and Maintenance Program in the City of Beaumont is a program to improve and maintain city streets through an annual street paving project. Various street improvement methods are used, including slurry seal, asphalt-rubber aggregate membrane (ARAM), asphalt grind and overlay, and full pavement section preplacement. A five-year pavement management plan is performed that prioritizes streets based on factors such as street type, age, condition, and traffic volume. Annual street paving projects are prepared based on the recommendations in the pavement management plan. Projects are funded using SB1 and Measure A funds. Unique Design / Planning: The City has created a very unique process for preparing the annual paving plans that uses in-house resources and innovative GIS software solutions.
Citywide Street Rehabilitation and Maintenance Program
Location Throughout the City City or County Responsible for Project City of Beaumont Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Program Scope: The Citywide Street Rehabilitation and Maintenance Program in the City of Beaumont is a program to improve and maintain city streets through an annual street paving project. Various street improvement methods are used, including slurry seal, asphalt-rubber aggregate membrane (ARAM), asphalt grind and overlay, and full pavement section preplacement. A five-year pavement management plan is performed that prioritizes streets based on factors such as street type, age, condition, and traffic volume. Annual street paving projects are prepared based on the recommendations in the pavement management plan. Projects are funded using SB1 and Measure A funds. Unique Design / Planning: The City has created a very unique process for preparing the annual paving plans that uses in-house resources and innovative GIS software solutions.
McCourtney Road Rehabilitation Project
Location McCourtney Road City or County Responsible for Project Nevada County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The County of Nevada’s 5-year Capital Improvement Program uses PCI (Pavement Condition Index) rating, ongoing maintenance activities and public input to determine how to best use our funds to increase our County wide PCI. This year’s annual roadway improvement project is part of a broader effort to improve how we address roadway conditions throughout the County. The McCourtney Road Rehabilitation Project, nick-named “Black Gold”, includes 3.2 miles roadway paving, shoulder widening, roadside drainage improvements, dig out and repair of poor asphalt, a 1.5” overlay, and placement of shoulder backing. The Project was a collaborative effort between the County Road Department, the County Engineering Department and George Reed Construction. The County Road Department milled 270 tons of damaged asphalt which was then screened and reused as shoulder
Combie Road Multi-purpose Trail
Location Combie Road and Higgins Road City or County Responsible for Project Nevada County Category Complete Streets Projects Description The Combie Road multi-purpose trail is a Class 1 concrete trail that stretches ¾ of a mile from Higgins Road to West Hacienda Drive, providing safe, non-vehicular/pedestrian-friendly access for students of three neighboring schools, and for local residents to access the neighborhood Marketplace shopping centers, and new community library. This project is part of a multi-phase project. Prior phases included undergrounding utilities, placing a traffic signal and widening Combie Road, to accommodate vehicular traffic associated with this vibrant and growing area. This project also connected to existing paths to provide a continuous and enhanced community wide trail. On this phase of the project, Nevada County partnered with Dokken Engineering on the design, and local contractor Hansen Brothers to build the project. The project consists of an ADA compliant, 8’ wide
Traffic Signals at Discovery Street and San Pablo Drive
Location Discovery Street and San Pablo Drive in Lake San Marcos City or County Responsible for Project County of San Diego Category Safety or Intelligent Transportation System Projects Description The Traffic Signal improvement project has been completed successfully adjacent to the intersection of Discovery Street and San Pablo Drive in Lake San Marcos in June 2025. These traffic signal improvements are aimed at improving the safety of adjacent school students and pedestrians crossing both Discovery Street and San Pablo Drive. Project highlights: • Construction of three ADA curb ramps with crosswalks • Construction of traffic signals • Construction of streetlights for increased illumination • These improvements are intended to improve driver safety while limiting impacts to the flow of traffic. Project submitted by Name Marisa Barrie Job Title Director Organization County of San Diego – Department of Public Works Address 5510 Overland Ave. Suite 410, San Diego CA 92123
Pedestrian Gap Improvement (Sunset Road)
Location Sunset Road – Borrego Springs City or County Responsible for Project County of San Diego Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Borrego Springs Gap Improvement Project focused on enhancing pedestrian mobility and infrastructure within the community. Key components of the project included: •Construction of 14 pedestrian ramps to improve accessibility. •Installation of 1,866 feet of sidewalk to create a safer pedestrian pathway. •Development of 63 feet of driveway across three locations. •Reconstruction and improvement of two roundabout islands, including enhanced vegetation. •Paving and striping on Palm Canyon Drive to improve roadway conditions in front of businesses. •Installation of curb and gutter to enhance drainage and mitigate water runoff issues. •Addition of 10 shade structures along Sunset Road, improving comfort for pedestrians. •Placement of flashing beacons to enhance pedestrian safety and visibility. The Borrego Springs Gap Improvement Project delivered significant enhancements, including: