Local Project Listing (2016)
Bart-Downtown Pedestrian Interface
The San Leandro BART-Downtown Pedestrian Interface project transformed an uninspiring expanse of asphalt and concrete in front of the San Leandro Bay Area Rapid Transit (BART) station into a vibrant urban streetscape well prepared for future high-density transit-oriented development planned for the surrounding area. Pedestrians, bicyclists, and motorists all benefit from these improvements. The original seven vehicle lanes were reduced to five to create space for the installation of on-street parking, class 2 bike lanes, and wider pedestrian sidewalks. New accessible pedestrian ramps were installed along with bulbouts and ornamental crosswalks at street intersections. A high-quality aesthetic environment was also created with additional landscape medians, sidewalk planter islands, street trees, decorative street lights with pedestrian scale fixtures, and wayfaring signage. The BART-Downtown Pedestrian Interface project is the first project to be implemented as part of the City’s Downtown Transit-Oriented Development (TOD) Strategy. This strategy, created with a grant award from
Southgate Neighborhood Sustainable Green Street Project
The Southgate neighborhood is a 41-acre single-family residential tract that was developed in the 1920’s that originally was designed to flow solely on surface gutter flows which were directed to a single storm drain inlet. The gutter surface drainage did no longer work due to deteriorated street conditions causing severe localized ponding during rain events. The primary objectives of the Southgate Neighborhood Sustainable Green Street Project were: 1) to address the storm drainage deficiencies within the Southgate neighborhood by improving the street surface drainage system, 2) to utilize innovative and sustainable techniques that minimize storm runoff and improve storm water quality, and 3) to become one of the pilot “Green Street” projects within the Bay Area. This project was in fact the second Green Street project constructed within Santa Clara County. “Green streets” incorporate low impact development techniques for site design and storm water treatment, including minimization of impervious area,
Lance Gulch Road
What’s a complete Streets? In Trinity County, Complete Streets meant finding the easiest way between A and B, Right? This has always in the past been the extent of consideration when constructing a frontier rural highway in California’s remote areas. Now Complete Streets means something new and more important. Lance Gulch Road (LGR) is a new 1.4 mile minor arterial road constructed east of Weaverville. Opened Oct. 2015, this multi model road provides better circulation, improves safety, reduces vehicle miles traveled, and better serving residential areas and Trinity’s largest employer, Trinity River Lumber Mill. Also included, a bicycle lane, and a sidewalk that are heavily used, considered by many to be the new road’s best amenity. Further, it proved easier access to the solid waste facility, STAA trucks, and new route options for transit. It represents a new way of thinking in Trinity as to what is important in building
Westfield Street Rehabilitation Project – Phase II
The Westfield Street Rehabilitation Project serves as an example of Efficient and Sustainable Road Maintenance and Reconstruction. 1. This project was a substantial improvement to the City of West Sacramento’s transportation infrastructure and can be quantified as: • 585,000 square feet of chip sealed roadway • 1,207,000 square feet or 19 lane-miles of slurry sealed roadway • 1,486 tons hot mix asphalt placed in repairing failed pavement • 3,283 linear feet of curb & gutter reconstructed for proper drainage • 18 ADA ramps upgrade for pedestrian access • Resurfaced Sacramento River boat launch parking lot for the City Parks Department 2. The project spanned three corners of the West Sacramento geographically and adjacent to a multitude of land uses including industrial, commercial, residential, and recreational areas. Further complexities include the variety of pavement rehabilitation and preservation treatments specified, including: • Type A HMA for leveling course • Type C “Intersection
Sun City Street Improvement Project
Sun City is a master-planned community for senior citizens over age 55 within the City of Menifee. The four square mile residential community has a private HOA and is closed to members-only, but the commercial center is open to the public. Originally built in 1960, the Sun City Community of Menifee was one of four “Sun Cities” originally designed by Del Webb. The Sun City “Core” is Located on the west side of Interstate 215 (I-215), near the heart of the City. The community has a recent estimated population of some 17,770 residents in approximately 8,750 households. The age restricted area of the Core creates a strong sense of community among the residents. The community is served by a shopping center that was originally partially built by Del Webb and was part of the Sun City development. The center was originally known as the Sun City Shopping Center, but changed
The Antelope Road Safe Routes to School Project- City of Menifee
The Antelope Road Safe Routes to School project’s is apart of the City’s Capital Improvement Program (CIP 15-05) and the main scope was to provide safe and adequate pedestrian access to the Romoland Elementary School in a marginalized area of the City that is considered a disadvantaged community, and is one of the city’s low-moderate income areas where 91% of the youth attending Romoland Elementary School are on free and reduced lunches with no transportation services. The existing road conditions consisted of a two lane road approximately 22 feet wide with dirt shoulders and poor signage. School children would sometimes walk alongside the road to get to school and were at serious risk for casualties or injuries. The project constructed the following improvements: 1. Widened the existing road width to 40’ to include street parking. 2.Constructed curb, gutter and sidewalk on both sides of Antelope Road and on the south
Newport Road Widening Project-City of Menifee
The Newport Road Widening Project’s overall purpose was to directly improve the safety, traffic flow, and overall quality of the main thoroughfare in the City of Menifee. With close to 65,000 vehicles currently traveling along Newport Road, and with the incoming Interstate 215/ Newport Road Interchange project beginning in 2015 that would further impede traffic, coupled with increasing population growth marked at increasing 30% in 6 years and Newport Road being one of only three ways to bifurcate to Interstate 215, improvements along Newport Road had to be drastic, quick, and innovative with the accompanied fiscal challenges that comes with being a new city. This project included (1) adding one traffic lane in each direction between Antelope and Menifee Roads; (2) adding a double left turn lane from westbound Newport Road to Southbound Antelope Road; (3) adding a new traffic signal at the intersection; (4) installed conduit between traffic signals
Rock Creek Road Rehabilitation Project
The Rock Creek Road Rehabilitation Project consisted of the rehabilitation, restoration and resurfacing of approximately 9.2 miles of Rock Creek Road, from its junction with US 395 south to the end of the road near Rock Creek Pack Station. The project widened the existing roadway to include two 11-foot travel lanes, a 4-foot wide striped bike lane along the southbound (uphill) travel lane, and 1-foot paved shoulders for a total paved width of 28 feet. Existing culverts (including 5 large arch-culverts) were extended to accommodate the wider roadway. The project was funded through the Federal Lands Access Program (FLAP) with a Toll Credit match. Construction occurred over two construction seasons and was completed in fall of 2015 for a cost of $9,500,000. Access to recreational uses along the length of the road remained open during construction. Rock Creek Road provides access to Rock Creek Lake, 12 Inyo National Forest campgrounds,
The City of Bell’s Comprehensive Street Revitalization & Improvement Plan
The City of Bell underwent an unprecedented economic scandal culminating in 2011 with the arrest (and subsequent prosecution) of the City Manager, 4 of the 5 City Council Members, and other executive staff. In addition, the corruption resulted in more than 30 serious lawsuits against and by the City involving claims of tens of millions of dollars. The extensive theft and mismanagement of municipal funds over more than a decade together with the legacy litigation costs starved the City of money to conduct routine maintenance in a variety of areas including the transportation infrastructure. Former administration ignored critical needs of the city in terms of road resurfacing, street improvements, transportation issues including bus shelter improvements, pedestrian and bicycle street improvements. Administration knew that the community was poor and uneducated and as a result preyed on their vulnerability. A new City Council was elected in a special election in 2011. They
Cosumnes River Boulevard / I-5 Interchange and Extension
This project is located in the southwest quadrant of the City of Sacramento. The Cosumnes River Boulevard/I-5 Interchange & Extension Project extends Cosumnes River Boulevard from its current westerly terminus at Franklin Boulevard to an interchange at I-5, and then farther west to an at-grade intersection with Freeport Boulevard in the currently unincorporated town of Freeport. Cosumnes River Boulevard/I-5 Interchange & Extension Project has resulted in a long-anticipated east-west arterial which will reduce traffic delays and improve safety. The connection includes a new interchange where the boulevard crosses Interstate 5, efficiently linking I-5 with State Route 99 to the east and providing a new regional connection between Franklin and Freeport boulevards. Construction of this project serves to shorten travel time between local communities and neighborhoods. Specifically, the project provides relief for the Meadowview/Mack Road corridor by increasing route continuity between SR 99 and Interstate 5. Vehicle mobility is improved thereby
Officer Bradley A. Moody Memorial Underpass
This project entails the construction of a roadway undercrossing in place of the existing grade crossing on Marina Bay Parkway between Regatta Boulevard and Meeker Avenue. The project has been named in honor of Officer Bradley A. Moody who passed away as a result of an auto accident which occurred in October 2008, just north of the project site. This new crossing was necessary in order to relieve congestion and eliminate traffic stoppages caused by train crossings in an area where there are no other unobstructed options for accessing the Marina Bay Area. The need for a reliable landside route through this access point to the shoreline is further heightened by the Water Emergency Transit Authority’s (WETA) proposed ferry service between San Francisco and Richmond.
Glenoaks Boulevard Adaptive/Responsive Traffic Signal Operation
Glenoaks Boulevard is a major arterial street extending from the Sylmar area in Los Angeles, through Burbank, to downtown Glendale. It parallels the I-5 freeway and is used as a bypass to the freeway, particularly during heavy congestion periods on the freeway. The 3.25 mile section of street in Burbank has 20 traffic signals. The previous operation of the Glenoaks Boulevard signal system used fixed timing plans to manage traffic in the corridor. This system was very inefficient and caused unnecessary vehicle delays and reduced travel speeds. When Caltrans started reconstruction of I-5 through Burbank, a more responsive traffic signal control system was needed. An adaptive/responsive control was selected that would automatically change timing plans with the speed, volume, and directionality of traffic on the street. The new control software from McCain, Inc. was installed with only minor changes to the existing signal infrastructure and traffic control hardware. The total
Santa Anita Avenue Grade Separation
Phase 1 of the Metro Gold Line Light Rail line opened on July 26, 2003, connecting Union Station in downtown Los Angeles with the Sierra Madre Villa Station in east Pasadena. Phase 2 is the proposed extension of the light rail line from east Pasadena to Montclair. The Light Rail alignment follows the old AT&SF railroad line through the San Gabriel Valley, last used in Arcadia in 1994. For Phase 2, the line proposes to cross 26 streets at-grade. Of the 26, the crossing of Santa Anita Avenue in Arcadia has the highest average daily traffic volumes (over 32,000 ADT). During the EIR process, all Phase 2 crossings were analyzed for the need for grade separations based on the latest Los Angeles County Metropolitan Transportation Authority (Metro) criteria and none met the warrants. The City of Arcadia undertook its own technical studies of the delays and impacts to traffic at
Wilshire Boulevard Bus Rapid Transit
The Wilshire Boulevard Bus Rapid Transit (BRT) project was completed in February 2015, and is located in the Los Angeles County unincorporated community of Veterans Administration (VA) Center, near the University of California, Los Angeles campus. The Wilshire Boulevard transit corridor is a 12.5-mile stretch of Wilshire Boulevard that has an average daily traffic volume of 80,000 vehicles and serves highly significant origin and destination points for southern Californian trips. Over 41% of all transit trips begin or end in the corridor and over 50% of them occur solely within the corridor. The Los Angeles County Metropolitan Transportation Authority (LACMTA) has a goal for the corridor to improve transit travel times, reliability, and ridership; repave damaged areas; and improve traffic flow. With funding provided by LACMTA, this project improved traffic flow along 0.38 mile of the corridor between Federal Avenue/San Vicente Boulevard and Bonsall Avenue by adding a peak period
Pacific Street Widening
The project was part of the approved 2015-19 Capital Investment Plan and was funded using a combination of federal and local funding. The project added ADA upgrades, built a new multi-use path, widened pavement to add a striped median; low impact landscaped swale and a meandering separated walkway along the north side of Pacific Street between Del Mar Ave and the City limits/Town of Loomis thereby enhancing traffic safety along this Historic Route 40 corridor. The reconstruction techniques used saved money and created a strong road to last well into the future.
Pacific Street Bike Lane & Widening Project
The City of Rocklin’s Pacific Street Bike Lane and Widening Project is noteworthy for both its roadway preservation qualities and its complete street features. Pacific Street in Rocklin has a unique history in that this segment first served as the Lincoln Highway, the first road for automobile use across the United States. Subsequently, this segment served motorists as part of the US Highway 40. The roadway was still utilizing pavement from this period, estimated from 1916. Based on consultation from the Lincoln Highway Association (LHA), it was determined that the original historic Lincoln Highway roadbed was still in place below the existing PCC pavement. It was discussed that it would be desirable to leave this original roadbed undisturbed. To accommodate this, a “crack, seat, and overlay” rehabilitation strategy was adopted for the project. This strategy would allow rehabilitation of the roadway surface without impacting the original roadbed below. The crack,
Pacific Street Bike Lane and Widening Project
The City of Rocklin’s Pacific Street Bike Lane and Widening Project is noteworthy for both its roadway preservation qualities and its complete street features. Pacific Street in Rocklin has a unique history in that this segment first served as the Lincoln Highway, the first road for automobile use across the United States. Subsequently, this segment served motorists as part of the US Highway 40. The roadway was still utilizing pavement from this period, estimated from 1916. Based on consultation from the Lincoln Highway Association (LHA), it was determined that the original historic Lincoln Highway roadbed was still in place below the existing PCC pavement. It was discussed that it would be desirable to leave this original roadbed undisturbed. To accommodate this, a “crack, seat, and overlay” rehabilitation strategy was adopted for the project. This strategy would allow rehabilitation of the roadway surface without impacting the original roadbed below. The crack,
Cotati Intermodal Facility and Improvements
Sonoma County Transit partnered with the City of Cotati (Cotati) to develop the Cotati Intermodal Transit Facility that will connect central Cotati, southern Rohnert Park and the Sonoma State University campus with local and intercity bus transit service and SMART commuter rail when it begins operation in late 2016. Sonoma County Transit purchased the land for the intermodal facility, and constructed essential components such as a 75-space park and ride lot, sidewalk improvements, a bus turnout on East Cotati Avenue and traffic signals at East Cotati Avenue and Santero Way. The investment from Sonoma County Transit was about $2.9 million. Sonoma County Transit’s portion of the project was funded by grants from the Bay Area Air Quality Management District, the Federal Transit Administration and local Transportation Development Act (TDA) funds. Sonoma County Transit collaborated with the City of Cotati on this project for about 12 years prior to construction. The
Sonoma County Transit Implementation of NextBus and System Enhancements
In October 2015, Sonoma County Transit equipped its 50 bus fixed-route fleet with the NextBus Passenger Information System. NextBus provides real-time bus arrival information for each of Sonoma County Transit’s over 1,100 bus stops, and can be accessed on smartphones, the Internet, or at bus stops equipped with NextBus real-time information signs. Upon introduction, real-time information signs were installed at Sonoma State University, downtown Cotati and at the Sonoma County Airport. By implementing NextBus technology and utilizing the information generated by the system, Sonoma County Transit will empower passengers with accurate arrival predictions, reducing uncertainty associated with the use of public transportation. By spring 2016, Sonoma County Transit will have approximately 20 new shelters with NextBus signs at major transit stops countywide. NextBus signs use LED displays to show station identifier and arrival times for the next two vehicles servicing the stop location. The real-time prediction for arrival of the
Arnold Drive and Downtown Glenn Ellen Improvement Project
Arnold Drive pavement preservation began in late May 2015, and was completed in October. This project consisted of a road base repairs followed by a two-inch asphalt concrete overlay on 0.91 miles of road, with an average daily volume of over 4,000 vehicles. This section of Arnold Drive stretches from Highway 12 to the Sonoma Creek Bridge, through downtown Glen Ellen, a bright and historically relevant area of Sonoma County. In downtown Glen Ellen the project included significant improvements to pedestrian features, including ADA compliant curb ramps, sidewalks and pedestrian railings. Arnold Drive is classified by the Federal Highway Administration as a Major Collector, meaning it carries high average daily traffic volumes. Before the roadwork on Arnold Drive the average PCI was 44, with the improvements the PCI is now 100. In the Sonoma County road network Major Collectors are normally in good condition, with an average Pavement Condition Index
Circle Drive over Virginia Road Bridge Replacement Project
The Circle Drive over Virginia Road Bridge Replacement Project consisted of replacing an existing four-span reinforced concrete bridge with a single span post-tensioned concrete box girder bridge located in the City of San Marino. The bridge was built back in 1910 and was 115 feet long with a clear travel width of 18 feet. The newly constructed bridge is 135 feet long with a 32-foot-wide travelway and two six-foot-wide sidewalks. Vehicular Safety and Preservation Enhancements The existing Circle Drive Bridge was rated as functionally obsolete because the existing column bents were located too close to the edge of travel way on Virginia Road. The bridge was also rated as structurally deficient due to deterioration of the reinforced concrete girder, and was posted for a 3-ton weight restriction. The bridge also did not comply with either the Americans Disabilities Act (ADA) requirements or the Caltrans Seismic Design Criteria (SDC). The newly
La Mesa Downtown Village Streetscape Improvement Project
The Downtown Village Streetscape Improvement Project, completed in December 2015, was a revitalization project of the City of La Mesa’s Downtown Village. The goal of the project was to replace and refurbish the existing street infrastructure and beautify the City’s downtown area. Project achievements included replacement of all curb, gutter, sidewalk, street paving, lighting, drainage and landscaping throughout the five blocks of the project limits. The project required extensive coordination between the City, the contractor, the downtown businesses and the public. Construction of the streetscape improvements spanned an 18-month period during which time all businesses remained open to the public. In order to accommodate traffic and parking throughout the downtown area and provide public access to businesses while the project was underway, the work was carefully phased to minimize impact, and tight block by block construction deadlines were imposed. La Mesa’s downtown village neighborhood is over 100 years old and
Bristol Street Improvements and Widening
The Bristol Street Improvements project was planned and designed to incorporate complete street concepts with storm drain quality features and implementation of Green Street technologies. The City was awarded with a Bronze Certification from GreenRoads, which is a third party rating system that rewards roadway projects that exceed public expectations for environmental, economic, and social performance. The improvements included widening of the street from 4 lanes to six lanes, with bus turnouts, raised median, class II bike lanes, and sound walls. The project also brings native and drought tolerant landscaping that beautifies a fully developed urban area and requires no irrigation after establishment. The project team selected a biofiltiration BMP for Bristol Street Improvements. A series of drought tolerant vegetated bio-swales were designed to capture and filter a 2 year storm. The swales did not only include run-off from the project foot print but also run-on from the whole drainage
Construction of 2014/15 County-Wide HMA Overlay SAMI Project
Construction of 2014/15 County-Wide HMA Overlay SAMI Project By TRANSPORTATION DIVISION County of Santa Barbara, Department of Public Works For League of California Cities January, 2016 Introduction The purpose of this project was to pave fifteen roads that are located across the County of Santa Barbara. A total of eighteen lane-miles were resurfaced of the total 3,376 lane miles within the County. The principal strategy for restoring these roads centered on grinding the old asphalt to a depth of nearly two inches. After grinding a one-half inch thick layer of recycled asphalt rubber seal coat was applied, followed by a three inch layer of type A hot mix asphalt. The recycled rubber seal coat acts as a cushion between the distressed older pavement and the new overlying pavement. This asphalt rubber stress absorbing interlayer (SAMI) was placed on all roads in the project. In addition, excessively cracked asphalt areas comprising
Francisco Drive Right Turn Pocket
El Dorado Hills, a thriving community in El Dorado County, has a diverse and growing demand to improve upon its infrastructure. As the community has developed, the increased need for safer, more efficient multi-modal transportation systems has also grown. The heavily traveled El Dorado Hills Boulevard and Francisco Drive intersection is adjacent to parks, schools, and an abundance of bike and pedestrian trails through residential and commercial areas. Over the years, the intersection has been marked by failures in the pavement and in the travel performance for its many users. Through working together with the community to properly identify their needs, and partnering between County and funding agencies, El Dorado County was able to deliver a project that not only reconstructed the intersection at El Dorado Hills Boulevard and Francisco Drive, but also significantly improved its performance for many users. It became clear that the operational performance could be substantially
Francisco Drive Right Turn Pocket Project
El Dorado Hills, a thriving community in El Dorado County, has a diverse and growing demand to improve upon its infrastructure. As the community has developed, the increased need for safer, more efficient multi-modal transportation systems has also grown. The heavily traveled El Dorado Hills Boulevard and Francisco Drive intersection is adjacent to parks, schools, and an abundance of bike and pedestrian trails through residential and commercial areas. Over the years, the intersection has been marked by failures in the pavement and in the travel performance for its many users. Through working together with the community to properly identify their needs, and partnering between County and funding agencies, El Dorado County was able to deliver a project that not only reconstructed the intersection at El Dorado Hills Boulevard and Francisco Drive, but also significantly improved its performance for many users. It became clear that the operational performance could be substantially
Doublegrove Street Project
The Los Angeles County Department of Public Works leads the way to greener, more cost effective roads by applying our three prong sustainable approach in the maintenance, rehabilitation, and construction of our roads. The sound strategies of this approach are to (1) take care of roads that are in good condition, first; (2) use recycled materials in the treatment selections; and (3) reutilize the existing materials in-place. The Doublegrove Street Project is a leading example of the cost effectiveness and environmental custodianship of our sustainable approach. The project is located in the Los Angeles County unincorporated community of Valinda. The scope included preserving an entire neighborhood network consisting of approximately 27 lane miles of fair to good residential roadways. The objective was to mitigate the higher cost and greater construction impact to the community normally associated with deteriorated roads by extending the pavement life now. This strategy can achieve a
Fitch Avenue over Mint Canyon Wash Bridge Replacement
The Fitch Avenue Bridge over Mint Canyon Wash is located just west of Sierra Highway in the Los Angeles County unincorporated community of Canyon Country. The Fitch Avenue Bridge serves as the only bridged connection to a nearby rural community and plays a critical role during major storm events. The original Fitch Avenue Bridge was built in 1927 as a single span, timber on steel frame superstructure, measuring 20-feet long by 10-feet wide. The bridge was widened and extended several times over the years and in 1963 was expanded to a two-span timber structure measuring 43-feet long by 28-feet wide. Throughout its 88-year life, the bridge survived a number of natural disasters including a fire in 1974 and heavy rains in 1993. The 1993 storms caused scouring of the pier which led to significant vertical settlement. Horizontal displacements of the superstructure also occurred due to debris flows that were much
Avenue of the States Roundabout
The Avenue of the States roundabout was designed in conjunction with a new senior, affordable housing development to improve an unusual and confusing three-legged intersection. Additional goals were to create pedestrian crossings, improve lighting, and reduce vehicle speed at the intersection of a residential neighborhood, public golf course, and commercial center in Palm Desert, California that sees 5,000 – 5,500 average daily trips. The City of Palm Desert strives to minimize impact to residents and businesses during construction of street improvements, but recognized the need to close the intersection during this project in the interest of community and worker safety. Therefore, a complete closure of the intersection was planned for eight weeks. A partial closure would have doubled the length of the project. Work was scheduled during the summer, when traffic is the lightest, to reduce the inconvenience to neighboring residents and businesses. The project was completed one week early
Bardsley Avenue Grade Separation
Location: City of Tulare City or County Responsible: City of Tulare
Truckee River Legacy Trail Phase 3B
Location: County of Placer County Responsible for Project: County of Placer