Local Project Listing (2017)
State Route (SR) 89 Mousehole Pedestrian and Bicycle Improvement Project (Finalist)
The SR 89 Mousehole Pedestrian and Bicycle Improvement Project constructed a 12-foot wide, 120 foot long pedestrian and bicycle tunnel 22 feet under the Union Pacific Railway. Prior to the project, pedestrians or bicyclists wishing to cross under the railroad were required to use the 24-foot wide vehicle tunnel, sharing traffic with vehicular traffic and large trucks. The project also constructed Class I bike/pedestrian paths that connect to paths to the north and south, a transit shelter, and several drainage improvements. Project Benefits: • Improves safety for pedestrians, bicyclists, and motorists. • Provides a bicycle and pedestrian facility along SR 89, connecting Lake Tahoe and Truckee, and Interstate 80. • Reduces congestion and greenhouse gases by promoting non-motorized travel. • Encourages a healthy, active lifestyle by providing recreational facilities. Project Innovation: The railway that travels over the project area is a major east west route and the project construction could
City of Palo Alto Street Maintenance Program
The City of Palo Alto’s 199 mile street network includes 131 miles of residential streets, 37 miles of collector streets and 31 miles of arterial streets. By 2010, Palo Alto’s average rating for streets was 73 and the Council appointed Infrastructure Blue Ribbon Commission (IBRC) determined that nearly 20% of Palo Alto’s streets were rated under 60. IBRC recommended that no Palo Alto streets have a PCI rating below 60 and City Council established a goal of achieving an average citywide PCI of 85 by 2021. Since 2009, Palo Alto’s PCI score has increased from 72 to 83 (December 2016) and we expect to reach a citywide average of 85 by 2019. Annual funding has increased from $1.7M to $6M for street maintenance since FY 2011 in an effort to accelerate the program. Palo Alto has been successful in leveraging grant, gas tax and vehicle registration funding to boost the
La Pata Avenue Extension Project (Bridge)
The $72 million La Pata Avenue Extension Project greatly improves regional mobility in South Orange County by extending La Pata Avenue approximately two miles through the Prima Deschecha Landfill from the Cities of San Juan Capistrano to San Clemente. The extension provides a new direct connection to retail centers, medical facilities, schools, recreational opportunities, emergency evacuation routes, residential communities, the landfill and more. The project accomplishes the following: (1) widens La Pata Avenue from three to five lanes from south of SR-74 in the County of Orange to the existing road terminus at the County’s Prima Deshecha Landfill; (2) implements a gap closure by constructing four new lanes from the existing terminus to the intersection of Calle Saluda and Avenida La Pata in the City of San Clemente; and (3) extends Camino Del Rio as a four lane roadway from its existing terminus in the Forster Ranch community to the
La Pata Avenue Extension Project (Safety/Intelligent)
The $72 million La Pata Avenue Extension Project greatly improves regional mobility in South Orange County by extending La Pata Avenue approximately two miles through the Prima Deschecha Landfill from the Cities of San Juan Capistrano to San Clemente. The extension provides a new direct connection to retail centers, medical facilities, schools, recreational opportunities, emergency evacuation routes, residential communities, the landfill and more. The project accomplishes the following: (1) widens La Pata Avenue from three to five lanes from south of SR-74 in the County of Orange to the existing road terminus at the County’s Prima Deshecha Landfill; (2) implements a gap closure by constructing four new lanes from the existing terminus to the intersection of Calle Saluda and Avenida La Pata in the City of San Clemente; and (3) extends Camino Del Rio as a four lane roadway from its existing terminus in the Forster Ranch community to the
La Pata Avenue Extension Project (Complete Street)
The $72 million La Pata Avenue Extension Project greatly improves regional mobility in South Orange County by extending La Pata Avenue approximately two miles through the Prima Deschecha Landfill from the Cities of San Juan Capistrano to San Clemente. The extension provides a new direct connection to retail centers, medical facilities, schools, recreational opportunities, emergency evacuation routes, residential communities, the landfill and more. The project accomplishes the following: (1) widens La Pata Avenue from three to five lanes from south of SR-74 in the County of Orange to the existing road terminus at the County’s Prima Deshecha Landfill; (2) implements a gap closure by constructing four new lanes from the existing terminus to the intersection of Calle Saluda and Avenida La Pata in the City of San Clemente; and (3) extends Camino Del Rio as a four lane roadway from its existing terminus in the Forster Ranch community to the
La Pata Avenue Extension Project (Roads)
The $72 million La Pata Avenue Extension Project greatly improves regional mobility in South Orange County by extending La Pata Avenue approximately two miles through the Prima Deschecha Landfill from the Cities of San Juan Capistrano to San Clemente. The extension provides a new direct connection to retail centers, medical facilities, schools, recreational opportunities, emergency evacuation routes, residential communities, the landfill and more. The project accomplishes the following: (1) widens La Pata Avenue from three to five lanes from south of SR-74 in the County of Orange to the existing road terminus at the County’s Prima Deshecha Landfill; (2) implements a gap closure by constructing four new lanes from the existing terminus to the intersection of Calle Saluda and Avenida La Pata in the City of San Clemente; and (3) extends Camino Del Rio as a four lane roadway from its existing terminus in the Forster Ranch community to the
Detroit Avenue Pedestrian and Bicycle Improvements Project
The Detroit Avenue Pedestrian and Bicycle Improvements Project, between Clayton Road and Monument Boulevard, included pavement rehabilitation, closed sidewalk gaps, repaired sidewalks, provided curb extensions, curb ramps and crosswalk enhancements at intersections, and installed Class II and Class II bikeways. The project was the product of a community-driven process, led by community partners including Monument Impact, Contra Costa County Health Services, First 5 Contra Costa, and the Central County Regional Group. The US EPA Sustainable Communities Building Blocks program and the City’s Monument Corridor CBTP identified key issues and opportunities and prioritized the Detroit Ave corridor for improvement. A community walking audit in August 2012, included staff from the EPA, the County, the City and members of the community summarized key issues such as unsafe crossings, uncontrolled intersections, narrow, non-existent and damaged sidewalks, low-visibility crosswalks, excessive speeding, and poor visibility at the Laguna Street intersection. The uncontrolled crosswalk on the
Noble Avenue Roundabouts at SR 198 Eastbound Ramps and Farmersville Boulevard Project
The roundabouts, while consistent with smart growth and complete street principles, also have proven environmental, mobility, and safety benefits. The Farmersville Roundabouts provide a multimodal project beneficial to all users and for the safe and effective movement of people and goods. Large trucks and emergency vehicles are easily accommodated by the presence of a “truck apron” in which truck trailers can mount onto to accommodate off-tracking. Bicyclists and pedestrians, including pedestrians with mobility impairments, have gained significant improvements due to roundabouts through a series of bicycle ramps, pedestrian curb ramps, wider sidewalks, and crosswalks with much shorter crossing distances across traffic. The roundabouts offer sustainability by meeting the needs of the triple bottom line including social, environmental, and economic benefits. The roundabouts have resulted in an efficient merging of traffic streams at the interchange by significantly reducing the frequency/severity of traffic collisions, reducing the amount of time vehicles are stopped/idling,
The Roadway Resurfacing Project (HDMB)
The Roadway Resurfacing Project which included High Density Mineral Bond (HDMB) consisted of resurfacing residential neighborhoods with HDMB supplied by the company HA5. HA5 uses a mixture of fine aggregates combined with a proprietary and uniquely stable base emulsion that includes materials to resist UV damage. HA5 Reduces cracking and raveling by effectively preserving the existing asphalt binder. Effectively deflects UV rays and has excellent durability and life extension. Reduces aging by restoring oils and resins to the surface. High aesthetic appeal with a pleasing “surface friendly” finish that is very well accepted by the residence of the City of Rocklin. The HDMB is part of the City’s prevention maintenance toolbox to save California Streets.
“A” Avenue Green Street
The City of National applied for and received a $2.5 million environmental grant to convert “A” Avenue into a “green” street that treats urban storm water runoff and provides a safe, aesthetically pleasing walking environment for National City residents and guests. The project implemented Low-Impact Development (LID) infiltration measures along portions of “A” Avenue between E. 8th Street and Kimball Park to treat urban storm water runoff prior to entering the storm drain system and discharging into Paradise Creek. The LID measures consisted of infiltration basins, bioretention basins, a nutrient separator baffle box (NSBB), and a 30,000 gallon cistern that collects storm water runoff, separates pollutants and pumps the recycled water into an irrigation system for landscaping. Educational and interpretive signage was installed to highlight these features. Other improvements include enhanced crosswalks with pedestrian refuge islands and corner bulb-outs for traffic calming, pedestrian actuated flashing crosswalk signs, and high intensity
“D” Avenue Traffic Calming Roundabout & War Memorial
The City of National applied for and received two grants to construct a traffic calming roundabout in response to requests from residents to enhance safety at the intersection of “D” Avenue & E. 12th Street in National City, CA. Speeding and accidents were the primary concerns. The “D” Avenue corridor through this intersection serves as a key walking route to several area schools, a community park, Boys & Girls Club, and senior housing complex. The City’s Veterans Memorial, which is located at the southwest corner of this intersection, was vandalized while the project was in design. The City immediately formed a War Memorial Committee consisting of City staff, local veterans and service organization members to develop a plan to refurbish and enhance the War Memorial as part of the Roundabout project. To further honor our military and veterans, the roundabout was designed to include monuments with plaques of the five
Vasquez Canyon Road Reconstruction
The County of Los Angeles Department of Public Works (Public Works) is committed to maintaining and preserving the local road system, which includes mountain passes that allow motorists alternatives to the major highways and freeways. One of these important alternate routes is Vasquez Canyon Road. On November 19, 2015, severe road deformation was observed that prompted Public Works to close the road. Approximately 600 feet of roadway was deformed by land movement attributed to a slope failure to the north of the roadway which undermined and lifted the road surface and made it impassable to traffic. To complicate matters further, the slope failure occurred on private property, which limited Public Works’ access to remove the slope failure debris. Public Works found that the property owner was deceased and that no heir had come forward to claim title to the property. Due to the importance of Vasquez Canyon Road as an
Pavement Accelerated Repair Implementation Strategy Program (Finalist)
The City of Redlands has implemented the Pavement Accelerated Repair Implementation Strategy (PARIS) Program to access and resurface two-thirds of city streets over a five year period. The scope of street repairs will include pulverization, grind and overlay and slurry seal. Striping, curb and gutter, and cross gutters are replaced or repaired where affected by paving work. It total, the program will repair 378 lane miles of local streets, 129 lane miles of minor streets, and 133 lane miles of major streets. The current phase, contracted at $8,739,532.00, includes funding from I-Bank, Measure I and Local Transportation dollars. When complete, PARIS will raise the City’s pavement condition index to approximately 80 placing Redlands among the top cities in California by the end of project-year five. The PARIS project is built on the City’s innovative Pavement Management Program (PMP) under which the physical condition of City streets are evaluated and the
Avenue M / Quartz Hill Road – Pavement Rehabilitation
The County of Los Angeles Department of Public Works in cooperation with the City of Lancaster completed a pavement rehabilitation project on a 6 mile stretch of Avenue M / Quartz Hill Road from 60th Street West to the Antelope Valley Freeway in October 2015. Several sections along this roadway were continuously generating potholes and complaints from the public. Maintenance crews were continually patching and repatching the roadway at significant cost to each organization. As funding for this project was of concern to both the County and City, as neither had included it within their fiscal year budgets, it was decided to do the most appropriate least cost treatment for the various sections of the road. The deterioration of the roadway was evaluated by the County’s Geotechnical staff and the appropriate treatments identified for a total of 1,091,600 square feet of pavement (County-57%, City-43%). Each jurisdiction provided the necessary prep
Citywide Residential and Local Streets Improvements Project
The City maintained & rehabilitated approx. 55 citywide residential & local streets totaling approx. 1.7 million square feet of an area costing approx. $2.2M. This project involved extensive public outreach & coordination with the residents to ensure the roadways remained open & had the least impact to the community. The project utilized Rubberized Asphalt Concrete (RAC) to provide a sustainable cost-effective roadway which can be used at reduced thickness compared to conventional asphalt overlays. RAC is a blend of paving grade asphalt cement, ground recycled tire rubber & other additives for use as binder in pavement construction. CA produces more than 40 million waste tires annually, of which approximately 75 percent are diverted from landfill disposal. For this project approximately 20,000 waste tires were used in rubberized asphalt. The City took advantage of the work being done & included other improvements at various locations in the City, including parking lot
City of San Jose 2015 Arterial Resurfacing Project-II
The City of San Jose, Department of Transportation is responsible for pavement maintenance of the city’s network of 4,313 lane miles of streets. DOT plans, designs, procures, and delivers pavement projects annually throughout the City. The 2015 Arterial resurfacing project included fourteen major streets within the City of San Jose for a total of 28 lane miles of streets. The construction phase included pavement work, street striping and markings, traffic detection loops, retrofit and replacement of ADA ramps, and the addition of green bike lane enhancements. The construction phase took six months and consisted of multiple rehabilitation strategies such as cold-in-place recycling (CIR ) using the foamed asphalt technology and rubberized hot mix asphalt (RHMA) gap-graded as the final wearing course ranging from 1.5″ to 2.0″ in thickness. Using the CIR rehabilitation design, the City was able to reduce cost and include more streets in the project scope. Moreover, CIR
City of San Jose 2015 Arterial Resurfacing Project
The City of San Jose, Department of Transportation is responsible for pavement maintenance of the city’s network of 4,313 lane miles of streets. DOT plans, designs, procures, and delivers pavement projects annually throughout the City. The 2015 Arterial resurfacing project included fourteen major streets within the City of San Jose for a total of 28 lane miles of streets. The construction phase included pavement work, street striping and markings, traffic detection loops, retrofit and replacement of ADA ramps, and the addition of green bike lane enhancements. The construction phase took six months and consisted of multiple rehabilitation strategies such as cold-in-place recycling (CIR ) using the foamed asphalt technology and rubberized hot mix asphalt (RHMA) gap-graded as the final wearing course ranging from 1.5″ to 2.0″ in thickness. Using the CIR rehabilitation design, the City was able to reduce cost and include more streets in the project scope. Moreover, CIR
State Routes 12 and 26 Intersection Improvement Project
This Intersection Improvement Project was designated by the Calaveras Board of Supervisors as the number one priority in the County. This project improved the traffic congestion at the intersection by widening and adding free right turn lanes, designated left turn lanes, and ADA accessible crosswalks and sidewalks. This project was completed by Public Works in June of 2016.
San Vicente Road Improvement Project
San Vicente Road is located in the community of Ramona within the unincorporated area of the County of San Diego, California. San Vicente Road functions as a link between Ramona to the north, the Country Estates community to the east, and the Barona Ranch Indian Reservation and the community of Lakeside to the south. San Vicente Road functions as a connector of nearby communities to parks, shopping centers, businesses, and schools. The San Vicente Improvements project consisted of 2.25 miles of roadway realignment/widening which vastly improved traffic safety while providing walkability, bicycling and equestrian activities, and preserving the natural characteristics of the community. The project followed a “complete street” infrastructure incorporating disintegrated granite (DG) multi-use pathways, multiple drainage basins, and bike lanes in both directions of traffic. The major challenges to construct this project were that both the horizontal and vertical alignments had to be modified while keeping the two
Golf Club Road Bridge Replacement
The Golf Club Road Bridge Replacement Project was completed by the City of Pleasant Hill as a community enhancement to an area of the City that is experiencing redevelopment. The project replaced an old structurally deficient bridge with a wider, safer and more aesthetic bridge over a major creek. The project included adding bike lanes, wider sidewalks, new lighting, enhanced crosswalks for safety. In addition, the project included new landscaping and more efficient irrigation systems..
Commerce Metrolink Station Safety, Beautification and ADA Improvements Project
The Metrolink Orange Line train service travels through San Diego, Orange, & LA Counties with a final stop at Union Station in Downtown Los Angeles. The line travels through 14 stations across approx. 87 miles & stops at the 26th Street Station in Commerce. Improving the Commerce Metrolink Station has been a high priority project for the City with a resident population of 13,000. With 1,800 businesses operating within the 6-sq-mile City & approx. 55,000 employees commuting to the City every day, providing transit alternatives is of paramount importance for the City. The Metrolink station opened in 1993. Over the years, the Station exhibited major signs of aging & was quite underutilized due to it being nestled within an Industrial area & aesthetic neglect. The Station also lacked the proper infrastructure for pedestrians, transit riders & motorists wanting to use the station as their first/last mile. In 2013, City of
Slauson Avenue Sidewalk, ADA, and Reforestation Project
Slauson Ave, a 2.7-mile corridor in the City of Commerce, is a major 4-lane arterial that runs east-west through the length of the City & connects 2 major freeways of I-5 & I-710 within City limits. It is also a major bus route extending more than 20 miles & connecting several East LA cities to downtown LA. As such, it is a critical mobility route for trucks, vehicles, transit as well as peds as it connects neighborhoods with employment & activity centers in Southeast LA. Slauson Ave provides 5’ to 10’ wide sidewalk segments affording walkability & connectivity for a large number of peds. The 2.7-mile segment through the City provided some sidewalk & parkway segments with ficus trees, however, over the years the existing sidewalks were severely damaged. The ficus tree roots uplifts had caused significant damage to sidewalks, curbs & gutters, as well as driveways & pavements within
Olivehurst Avenue Complete Streets Project
The Olivehurst Avenue Complete Streets Project is a defining feature for the disadvantaged community of Olivehurst. It completely transformed a narrow, dangerous, and aesthetically unappealing roadway, into an attractive, safe, multi-modal corridor that the community is proud of. The conceptual project was born as a result of the Olivehurst Sustainable Community and Economic Revitalization (OSCER) Plan, prepared as part of a large public outreach program. Construction of this community-changing project was completed in September 2016, and includes the following improvements : 2.4 miles of bicycle lanes and sidewalks; street widening and rehabilitation; curbs, gutters, and storm drains; transit stops and ADA accessibility improvements; utility undergrounding; Olivehurst’s first traffic signal; and upgrading street lights to more energy efficient LEDs. A primary focus of this project was to increase safety for pedestrians and bicyclists on the main corridor through the community of Olivehurst. The bicycle lanes and sidewalks improved student accessibility and
Kingston, Linda, Rose Triangle Project
Due to Piedmont’s long-standing history of completing projects through public-private partnerships, the City was approached in 2013 by residents in the neighborhood near Kingston, Linda and Rose Avenues, concerned about the inordinately large paved intersection that was confusing and dangerous for motorists, bicyclists and pedestrians. There are five legs to the intersection making visibility a constant issue. The large intersection was a vestige of the former light rail “Key System” through Piedmont. Once deemed obsolete, these large intersections were paved over. The development of the triangle and the associated safety improvements ties into the goals of Piedmont’s Pedestrian and Bicycle Master Plan (PBMP). Given that much of the walking and biking activity within the City consists of students going to and from school, the triangle helps to achieve the goal of creating safe routes to our schools. Currently, Piedmont’s PCI stands at 66. This project benefits the City’s overall roadway
State Route 32 Widening and Multi-Modal Improvements Project, Phases 1 & 2 (Finalist)
The State Route (SR) 32 Widening and Multi-Modal Improvements Project, Phases 1 and 2 is deserving of the Outstanding Local Streets and Roads Project award because it is an excellent example of improving traffic operations and capacity, while also enhancing safe and viable transportation alternatives; thereby meeting statewide goals to improve air quality, reduce greenhouse gas emissions and reduce the consumption of natural resources. The project, located within the City of Chico (City) urban core, involves widening the roadway from two to four lanes, improving the functionality of the transportation corridor with the installation of ADA compliant pedestrian ramps, crossings and sidewalks, and enhancing transit and adjacent park-and-ride facilities that service the multi-functional transportation hub located immediately adjacent to the SR 32 and SR 99 interchange. It also closes a key bicycle and pedestrian facilities gap in the heavily trafficked area, serving the multi-modal needs of residents and students. Major
Mission Beach Boardwalk Bulkhead Project
The Mission Beach Boardwalk Bulkhead scope of work involved the removal and replacement of 1,670 linear feet of parapet wall in addition to 44,000 square feet of concrete walkway and inclusion of 4 new ADA compliant ramps to provide adequate access to the beach. The retrofitting of this project provided vast improvements to the aging infrastructure and also maintained the historical look that matched the original bulkhead that was constructed in 1925. The concrete color, scoring, texture, geometry, finish, and other features were done to match in kind the historical features of the bullhead. The project was completed in May 2016, at a total cost of $5,500,000. This project was unique in such a way that the proposed improvements were required to meet the criteria of the Historical Resources Board and had to replicate the original features from the original construction. Mission Beach is one of the top tourist attractions
Bear Valley Parkway North Widening Improvements
The completion of this regionally significant project provides a much needed improved access to State Route 78 and Interstate 15 for residents and businesses in north county San Diego. Improving Bear Valley Parkway is an important step in the sustained economic growth for the community. Residents and businesses are now able to move faster and more freely between places of employment, schools, and home and to other close by attractions such as the San Diego Zoo Safari Park, Kit Carson Park, and Lake Wohlford. Prior to construction of this project, the mile long section of Bear Valley Parkway between SR 78 and Boyle Avenue was a 2-lane rural road with no sidewalks, no bike lanes, poor drainage, and poor visual esthetics due to the abundance of overhead utility lines poles. The one-mile long Bear Valley Parkway North Widening Improvements Project widened the existing two-lane 24-foot wide road to a four-lane
Desert View Drive Slope Repair and Restoration Project
San Diego initiated the Desert View Drive Slope Repair and Restoration in March, 2015 after observed movement on the active Rose Canyon Fault in the geologically and environmentally sensitive La Jolla area below Desert View Drive. A declaration of emergency was made due to El Niño concerns and the over 50-foot deep saturated canyon below the Mount Soledad subdivision that had seen four previous landslides since 1961 with similar indications of land movement. Repairs were analyzed, designed and substantially completed by the end of 2015. Construction involved: remote-area borings, over 25,000 yards of imported fill, storm drain realignment, permitting, and revegetation. The project total cost is $7,500,000. Construction was completed in August 2016. The project team deployed the best management techniques to complete the project on schedule, budget, and comply with the resource agency requirements and permits. We installed 6 inclinometers in the street, 150 ft deep in the ground
Mission Beach Bulkhead Seawall and Boardwalk Replacement
Originally built in 1925, the Mission Beach Amusement Center’s (now Belmont Park) seawall and boardwalk are one of San Diego’s most popular destinations. Layers of repairs on the seawall over the decades concealed spalling and cracked concrete, exposed rebar, and large voids undermining the pavement that were susceptible to collapse. The historic fabric had become unrecognizable and the damage irreversible. A complete reconstruction was the only long-term solution. The board walk is a main gateway to the southern beach area year round and is an important asset for the City to maintain access and safety. The bulkhead/seawall is used as a form of coastal management to prevent sand erosion and water flooding of adjacent private properties and public amenities. A Wave Hazard Study calculated the structural design to withstand extreme storm events and sea level rise. As a historic resource, the project was to restore the seawall to its original
Pavement Management Manual
County of San Bernardino, Pavement Management Section was able to establish Pavement Management Manual to explain and enhance the utilizing of our existing pavement asphalt and recycle the valuable material, instead of purchasing new version material, in addition to explain different pavement repair strategies to rehab all the county roads based on traffic, pavement condition and regions. Balancing between the availability of limited funds and the tremendous need of pavement improvements throughout the County is a big challenge. To make the most efficient use of the limited funds and create a more systematic, consistent and predictable approach in the selection and programming of projects, the County introduced a road categorization concept by grouping all of its paved roads into 5 road categories. Different PCI goals, different maximum treatment and different length of pavement preservation cycles are assigned to different road categories. Highest priority is given to Category 1 roads which
StreetsSD Interactive Street Condition Map
The City of San Diego’s new StreetsSD application (app) is one of the most innovative and capable online street maps of any major U.S. city. It makes detailed information about the City’s roads and road repairs available with just a click or tap. The app updates automatically so residents have the most accurate data on streets in every neighborhood allowing them to select the quickest and safest routes to and from their homes, work and other activities. The app continues San Diego Mayor Kevin L. Faulconer’s push to create a City government as innovative as the people it serves and helps illustrate his commitment to completing at least 1,000 miles of road repairs in five years. City crews and contractors are active daily with road improvement projects throughout the City. The Mayor has said, “We’ve got all this great information about streets and now we’re sharing it with the public
Hayward $19 Million FY 2016 – Pavement Maintenance & Rehabilitation Project (Finalist)
PROJECT: Hayward $19 Million FY 2016 – Pavement Maintenance & Rehabilitation Project GOAL: Sustainability The City of Hayward Department of Public Works has been implementing sustainable pavement treatments over the past few years. DESCRIPTION The $19 Million FY 2016 – Pavement Maintenance & Rehabilitation Project (Project) includes Preventative Maintenance Program and Rehabilitation Program. Project is complete. PCI increased to 70 from 66. In-house staff managed Project design and construction. Typical annual budget is $6 Million but a one-time Measure C funds provided additional funds. Project is a leading example of Hayward’s Efficient and Sustainable Road Maintenance, Construction, and Reconstruction Project. The Project made pavement improvements to over 330 street segments at various locations in Hayward. The scope of the preventative maintenance program included about 220 street segments and about 849,934 SY of pavement. The scope of pavement reconstruction & rehabilitation program included about 110 street segments and about 821,634 SY
Monrovia Renewal
The City of Monrovia has launched Monrovia Renewal, an innovative multi-year initiative comprising $51.7 million of priority repairs to the City’s water, sewer, and street systems, including sidewalk, curb / gutter and driveway approach improvements. As the 4th oldest city in LA County, Monrovia’s aging infrastructure includes significant deferred road maintenance, along with water and sewer lines approaching a century of use. To address these concerns, the City commissioned four master plans to identify major deficiencies in street, sidewalk, water, and sewer systems, and also completed a citywide Pavement Condition Index (PCI) survey. The average PCI rating for all City streets was determined to be 57.1, with 65% of streets (110 out of 170 lane miles) rated 70 or below. Monrovia Renewal is investing around $30 million to bring every street in the City up to a minimum PCI level of 70. This involves the rehabilitation or reconstruction of around
Colorado Esplanade Project
The Colorado Esplanade Project is a multi-modal circulation infrastructure and streetscape project located between the Downtown Santa Monica Metro station terminus for the Expo Light Rail Line and the Santa Monica Pier. Once a car-centric, two-way street, Colorado Avenue, from 4th Street to Ocean Avenue, was transformed into an active, multimodal travel corridor that accommodates pedestrians, bicyclists and autos in a safe, coordinated and efficient system. Twenty-foot wide, tree-lined sidewalks with “wavy” pavers, wood sidewalk decking, string lighting, wooden benches, tree wells, and separated bicycle paths complete this unique thoroughfare to the beach, Pier, Civic Center, downtown amenities, and transit stations. Reconfiguring Colorado Boulevard into a one-way street by removing one car lane was a radical notion because Santa Monica (and the greater Los Angeles area) has perennial traffic problems. However, changing the boulevard to a one-way, west-bound, lane alleviated existing traffic issues and added pedestrian and bicycling zones. The
Santa Clarita Road Rehab Program
Santa Clarita spans 64 square miles which translates to an abundance of streets and roads—and maintenance. In fact, the City’s Road Rehab overlay and slurry seal program is responsible for over 516 miles of major and minor streets. The residents of Santa Clarita depend heavily on these roads to live their daily lives. Poorly maintained roads constrain mobility, increase chances of accidents, and significantly raise vehicle operating costs. When kept pristine, roads make a contribution to the growth of a community and provide many social benefits. According to the 2014 City of Santa Clarita Survey results, nearly 80% of Santa Clarita residents believed the City’s efforts were “right on track,” partially because the “City stays within budget” and “improves roads.” In fact 16% of the reason why residents were satisfied with City services is because of the improved roads. Although happy with the positive survey results, the City’s Public Works
Donlon Road Realignment (Finalist)
After 30 years of traffic headaches and accidents for commuters and residents, the new Donlon Road realignment has made it much safer and quicker to get in and out of the historic Somis neighborhood and to commute on State Route 118. After many years of planning and design, the new Donlon Road opened in March of 2016, alleviating a serious traffic accident hot-spot and relieving heavy congestion at the intersection of State Route 118 (SR 118) and Somis Road. The problem was that SR 118, a heavy commuter route, had two intersections offset only 150 feet apart—one with Donlon Road and the other with Somis Road. Due to the close proximity of the two intersections, adequate left turn pockets were not possible. Left-turning traffic in both directions backed up into the through lanes on SR 118, resulting in a high rate of accidents and severe congestion at the intersection. The
Replacement of Jalama Road Bridge (51C-017 Replacement)
The length of the new bridge needed to be 160 feet long to connect across the width of the canyon. The long span was gracefully solved by using the segmented beam girder design. The beams were trucked to the site in 60-foot segments and then spliced together and formed the second longest beam bridge in California. This concrete beam design is less expensive than single piece steel beams and requires less maintenance. The beams were trucked to the site in 60-foot segments and then spliced together and formed the second longest beam bridge in California. The resulting 118 ton beams were picked-up by a crane and placed at night because the road has to remain open during the day. All work was completed by February 12, 2016. The bridge is the longest single span bridge in Santa Barbara County and second longest single span spliced girder bridge in California.
Village Parkway North Extension Project (Finalist)
Consistent with the California League of Cities, the City of West Sacramento is committed to the preservation and protection of streets and roads systems. The City of West Sacramento has a vision of streets projects that improve and sustain the safety and mobility of the public, law enforcement, commerce, emergency responders and that serve all multi modal transportation needs. In 2016, the City opened the Village Parkway Extension North to improve transportation options to the Southport District and the rest of southern West Sacramento. Prior to the extension, the southern communities had few connection options to the northern part of the City and to recreational, employment and commercial destinations. Residents of the area can now enjoy easier access to hiking, biking and fishing while enjoying increased access to freeways, bridges, Raley Field, the Barn, City Hall, and Downtown Sacramento. In addition, this north-east connection along West Sacramento’s waterfront, supports multi
Patterson Pass Road Safety Improvement Project
Alameda County is a primary destination for regional and inter-regional traffic for goods movement and workforce commute travel between San Joaquin County and Alameda County. Interstate 580, the major transportation corridor in this region, routinely experiences extreme traffic congestion. In an effort to avoid these congested freeways, commuters continue to seek alternative routes along the rural roads. Patterson Pass Road is one of the most travelled rural roadways utilized as an alternate commuter route in lieu to I-580 between Livermore and Tracy (daily two-way traffic is about 3,700 vehicles per day). In addition, the roadway provides access to rural residential properties, ranches, and wind farms. Bicyclists also use the road for recreational rides. During non-commute times, cattle and other livestock are moved onto and/or across these roads. It is also common for local farmers and ranchers to move equipment from one field to another during planting season. The vehicles and
City of Santa Barbara Bridge Projects
The City is wrapping up construction of two critical bridge replacement projects in the Waterfront area of Santa Barbara. The two projects are the Cabrillo Boulevard Bridge Replacement Project and the Mason Street Bridge Replacement Project. The bridges are both over Mission Creek. The old Cabrillo Bridge was over a 100 years old and on a historic boulevard. The City, through its Historic Landmarks Commission, desired to replicate many historical aspects of the original bridge including replica barrier rails. The bridge itself was extremely structurally deficient and in need of immediate replacement. As Cabrillo Boulevard, is a primary arterial, it was critical to maintain access during construction and the bridge was built in three stages to maintain one lane of traffic during construction. The Mason Street Bridge replacement was primarily replaced due to geometric issues including flood conveyance and roadway widths. The bridge was designed to convey a 20-year storm
Bob Hope Drive Corridor Improvements
The City of Rancho Mirage reduced congestion on three arterial streets this year by widening two of its most heavily traveled intersections to build-out capacity. The Bob Hope Drive and Gerald Ford Drive Street Improvements project was completed in April 2016 and the Bob Hope Drive and Frank Sinatra Drive Street Improvements project was completed in December 2016. Each leg of the two intersections was widened to ensure a second left turn lane and a dedicated right turn lane in each direction. The goals, construction methods, and benefits of the projects are similar. Since the project intersections are located one mile apart and are directly affected, they were completed sequentially in order to reduce delays and minimize disruption. Both projects utilized Tire Rubber Modified Asphalt Cement (TRMAC) pavement, a mix that incorporates ground, recycled tire rubber into asphalt cement in order to increase longevity, reduce road noise, and provide a
Fremont Avenue Bridge Replacement
Project Name: Fremont Avenue Bridge Replacement Location (if applicable): Fremont Avenue at Permanente Creek City or County Responsible for Project: City of Los Altos Category: Efficient and Sustainable Road and Bridge Preservation, Maintenance and Construction and Reconstruction Projects Contact Information Submitted by: Chris Lamm Title: Engineering Services Manager Organization: City of Los Altos Address: 1 N. San Antonio Road, Los Altos, CA 94022 Telephone: (650) 947-2624 E-mail: clamm@lostaltosca.gov Narrative Description of Your Entry Fremont Avenue is a principle collector urban road within Los Altos, California. The existing Fremont Avenue Bridge carried two lanes of vehicle traffic and pedestrian traffic on one side of the bridge on Fremont Avenue over Permanente Creek between Hazelaar Way and Miramonte Avenue. Constructed in 1915, the bridge was classified as structurally deficient prompting replacement. The new bridge, completed in 2016, consists of two travel lanes, two five-foot bike lanes, and an ADA compliant sidewalk on
Highway 12 Bicycle and Pedestrian Improvements
The Highway 12 Corridor Improvement Project Phase II brought essential infrastructure to the Boyes Hot-Springs area along Highway 12 between Agua Caliente Road and Boyes Boulevard, just north of Sonoma. The project improves the safety and atmosphere of the corridor, which is used by drivers, cyclists, families, and pedestrians who work, live, shop in the neighborhood. The total project cost is estimated to be about $13 Million, including right of way, design, construction and more. The project was designed by Transportation and Public Works, Green Valley provided construction management, and O.C. Jones & Sons was the general contractor. The project included the construction of pedestrian and bicycle facilities, roadway widening, asphalt pavement replacement, installation of curbs, gutters and sidewalks, stormwater treatment devices, pedestrian level street lights, and traffic signal modifications on State Route 12 between Agua Caliente Road and Boyes Blvd in the Springs Area of Sonoma Valley. Construction is
Desert View Drive Road Slope Repair and Restoration
San Diego initiated the Desert View Drive Road Slope and Restoration project March 16, 2015 after observed movement on the active Rose Canyon Fault in the geologically and environmentally sensitive La Jolla area below Desert View Drive. A declaration of emergency was made due to El Niño concerns and the over 50-foot deep saturated canyon below the Mount Soledad subdivision that had seen four previous landslides since 1961 with similar indications of land movement. Repairs were analyzed, designed and substantially completed by the end of 2015. Construction involved: remote-area borings, over 25,000 yards of imported fill, storm drain realignment, permitting, and revegetation. The project total cost is $7,500,000. Construction was completed in August 2016.
Mission Beach Boardwalk Bulkhead
The Mission Beach Boardwalk Bulkhead scope of work involved the removal and replacement of 1,670 linear feet of parapet wall in addition to 44,000 square feet of concrete walkway and inclusion of 4 new ADA compliant ramps to provide adequate access to the beach. The retrofitting of this project provided vast improvements to the aging infrastructure and also maintained the historical look that matched the original bulkhead that was constructed in 1925. The concrete color, scoring, texture, geometry, and other features were done to match in kind the historical features of the bullhead. The project was completed in May 2016, at a total cost of $5,500,000.
Canal Road Sidewalk and Bike Lane Project
The Canal Road Sidewalk and Bike Lane Project is a Safe Route to School Project that closed a critical sidewalk gap and provided dedicated bicycle facilities adjacent to Bel Air Elementary School in Bay Point. This project installed 3,650 feet of sidewalk, widened the roadway to provide a Class II bike lane on both sides of the road, and installed 13 inlets and 800 feet of storm drain. This Project addressed a critical safety concern. The community of Bay Point has experienced the most pedestrian and bicycle related collisions in the County. During the past 12 years, 16 pedestrian or bicycle collisions have occurred, three of which resulted in pedestrian fatalities. One fatality occurred within this Project segment in 2014. The Project had a number of engineering challenges with the constrained right-of-way, multiple utility conflicts (both anticipated and unexpected), and working around sensitive creek and wetland areas. In spite of
Gilman Springs Road Safety Improvement Project (Phase 3)
The County of Riverside Transportation Department (County) is committed to improving the roadway system along the Gilman Springs Road Corridor to enhance safety and bring the infrastructure up to current standards. The improvements along this corridor are being completed in a series of five (5) phases. Phasing out the project has allowed the County to seek a variety of funding sources to help complete the needed improvements. This has helped the County as it faces a funding shortfall to maintain and improve existing infrastructure. The County has brought $12.6 million in infrastructure improvements to rehabilitate 5.5 miles of roadway on the Gilman Springs Road Corridor to date. The County has been successful in obtaining Federal funds from the Highway Safety Improvement Program (HSIP) for various phases of the Gilman Springs Road Safety Improvement Corridor Project. As a result of obtaining HSIP funds, the County was able to construct Phase 3
The Lost Canyon Road Bridge Widening Project
The City of Santa Clarita is the third largest city in Los Angeles County, with a growing population of approximately 220,000 residents. It is located in the center of Santa Clarita Valley, approximately 35 miles northwest of the City of Los Angeles. Municipal boundaries encompass over 40 square miles of land, situated primarily on the valley floor and lower reaches of the surrounding canyons. The City is positioned within a “V” formed by two freeways, the Golden State Freeway (1-5) to the west and the Antelope Valley Freeway (SR-14) to the east. In 2016, the City marked a milestone in its Five Year Capital Improvement Plan in “Sustaining Public Infrastructure” with the completion of “The Lost Canyon Road Bridge Widening Project.” This project is also part of the City’s “Santa Clarita 2020 Plan,” which is used as a guide for the City’s major work efforts in order to best prioritize
Studebaker Road Improvement Project (Finalist)
Studebaker Road Improvement Project Summary: The City of Long Beach Public Works Department strives to operate, preserve, and enhance the City’s physical infrastructure and transportation systems by providing a variety of services which include the repair, rehabilitation and general upkeep of City streets, trees, and sidewalks. The City of Long Beach is committed to improving service-life and quality of the road systems with the most cost effective and environmentally responsible approach. To this end, the City of Long Beach embarked on a pilot project to perform roadway maintenance with more sustainable and environmental friendly construction methods. The roadway rehabilitation project consisted of removing and replacing the upper 4.5-inches of asphalt on Studebaker Road between Spring Street and Wardlow Road. The construction rehabilitated the roadway by recycling the existing pavement to a depth of 3-inches using the cold in-place recycling (CIR) paving method, followed with construction of 1.5-inches of asphalt rubber
East Fork Road over North Fork San Gabriel River Bridge Retrofit (Finalist)
The East Fork Road Bridge over North Fork San Gabriel River is a 642-feet long, steel truss bridge built in 1949. It is located in the San Gabriel Mountains National Monument just north of the City of Azusa and provides access to L.A. County firefighting facilities and recreational amenities such as the East Fork Trail that leads to the “Bridge to Nowhere”. The project consisted of seismically retrofitting the bridge to prevent collapse after an earthquake and is outstanding and worthy of an award due to its high level of structural engineering complexity, use of innovative technology, safety benefits to the public, and sensitivity to the environment. It also demonstrates how collaborative efforts and open dialogue among owner, engineer, and contractors can resolve project challenges and bring the project to a successful conclusion. Respecting the environment and ensuring that the project did not negatively impact the surrounding area and wildlife
El Segundo Boulevard Rehabilitation Project
The Los Angeles County Department of Public Works continues its commitment to preserving and improving the quality of the road system in a cost effective and environmentally responsible way by utilizing the three prong sustainable approach. The approach incorporates principles that (1) maintain roads that are in good condition, first; (2) use recycled materials; and (3) reutilize existing materials in-place. The El Segundo Boulevard Project showcases the benefits of this sustainable approach. El Segundo Boulevard is a major roadway located in the County unincorporated area near the City of Compton. Approximately 1.5 miles of pavement was in poor to failed condition. The objective of the project was to rehabilitate the entire section. The scope of work involved rehabilitating the roadway by milling off 1.5 inches of the existing pavement then recycling the next 3 inches using a cold in-place recycling (CIR) treatment. CIR is a process that removes and resizes
Los Angeles County’s Pavement Preservation Program
The Los Angeles County Department of Public Works (DPW) is committed to preserving and improving the overall quality of local streets and roads in a fiscally effective and environmentally responsible manner by utilizing our three-pronged sustainable approach. This approach incorporates the principles of (1) taking care of roads that are in good condition first; (2) using recycled materials in treatment selections; and (3) reusing existing materials in-place. During the months of October and November of 2016, DPW successfully delivered four pavement preservation projects that incorporated our three-pronged approach. These projects are Red Coach Ln, Casa Del Rey, Bellbrook St, and Eric St et. al. and were located within unincorporated Los Angeles County. The scope of work included preserving approximately 13.7 lane-miles of residential roadway equivalent to 2.2 million square feet of asphalt pavement mostly rated as fair to poor condition. The goal was to extend the service life of the
Desert View Drive Slope Repair and Road Restoration
San Diego initiated the Desert View Drive Storm Drain project March 16, 2015 after observed movement on the active Rose Canyon Fault in the geologically and environmentally sensitive La Jolla area below Desert View Drive. A declaration of emergency was made due to El Niño concerns and the over 50-foot deep saturated canyon below the Mount Soledad subdivision that had seen four previous landslides since 1961 with similar indications of land movement. Repairs were analyzed, designed and substantially completed by the end of 2015. Construction involved: remote-area borings, over 25,000 yards of imported fill, storm drain realignment, permitting, and revegetation. The project total cost is $7,500,000. Construction was completed in August 2016.
Middlefield Road & North California Avenue Complete Streets Project
The Middlefield Road & North California Avenue Complete Streets Project consists of two phases that include new bikeways, crosswalks, and smooth pavement. The project is an expansion upon Public Works’ Middlefield Road maintenance project, improving multi-modal mobility along the residential arterial between Oregon Expressway and Forest Avenue. Project goals and design elements achieve the safety, preservation, and sustainability goals set for by the Save California Streets Program through the following: • Efficient use of resources by implementing changes in conjunction with Public Works’ Five Year Paving Plan, adjusting existing video detection to detect bikes in addition to vehicles, and achieving goals primarily through striping • Encouraging reduced speeding of motorists to help reduce fatalities and serious injuries • Increasing access to safe multi-modal transportation options by constructing a separated bikeway and widening sidewalks • Improving pedestrian and bicyclist connections between neighborhoods and community facilities and resources The first phase of
Armorlite Drive Enhancements (Finalist)
Improvements to Armorlite Drive to become a multi-model complete street. The improvements consist of enhanced walkways, bike racks, street furnishings, tree wells, parking, pedestrian lighting, bioswales for storm water treatment, and a Class 1 bike path on the north side of the street. Traffic calming measures consist of reduced travel lane widths, on-street parking, median, chicane, and mid-block pedestrian crossings with rapid flashing beacons. The enhanced roadway serves as the frontage road for recent mixed-use developments (Palomar Station and Davia). The new bike path provides connectivity between the Inland Rail Trail on West Mission Road, Palomar College Train Station, and Mission Sports Park.
Desert View Drive Storm Drain Replacement
The Desert View Drive is the only access street to this local community in La Jolla. The closure of the street will result in a hardship foe the residents along both sides of the street. The Desert View Drive Storm Drain Project was after observed movement on the geologically active Rose Canyon Fault in a geologically and ecologically sensitive area of La Jolla below Desert View Drive. Initial investigations resulted in a declaration of emergency because of the land slide potential in the unstable Mount Soledad development above the project. The storm drain outlet and the extensive erosion were observed below the area of damage. The eroded vertical walls in the slot canyon were over 50’ high in places. An emergency was determined necessary and warranted to mobilize forces rapidly enough to address the potential hazard and the safety of the residents, particularly in light of the area history and
Notre Dame Avenue Reconstruction Project
The Notre Dame Avenue Reconstruction Project marked a major milestone for the City as it signified the completion of its first sustainable complete street reconstruction project. The project included Low Impact Development treatments; complete pavement reconstruction; full utility analysis and replacement of storm drain, sanitary sewer: pedestrian and ADA enhancements; improved transit stops, parking enhancements; context-sensitive construction solutions; landscaping; extensive utility coordination. All of this was achieved while minimizing the construction disruption in a neighborhood road system with the primarily to balance between moving traffic while improving the neighborhood environment, pedestrian and biking experiences
City of Modesto Slurry Seal Program
In May of 2016, the City of Modesto Streets Division implemented a slurry seal preventative maintenance program. Our goal was to complete 40 lane miles in our first season. After a successful season, we exceeded our goal by completing 76.8 lane miles of residential street slurry seal. This preservation program which adds to the lifespan of our residential streets has been received in a positive manner by the citizens. Not only does the slurry add a new wear surface, it protects the base by preventing water penetration, and it also gives a new aesthetic value to the street that has been very pleasing to the citizens of Modesto. We provided our citizens a value product at a final cost of $1.08 per square yard.
Pacific Avenue & Burchett Street Wastewater Capacity and Street Improvements Project
Pacific Avenue & Burchett Street Wastewater Capacity and Street Improvements Project was completed in December 2016. The work was performed on Pioneer Drive between Kenilworth Avenue and Pacific Avenue; Pacific Avenue between Pioneer Drive and Burchett Street; and Burchett Street between Pacific Avenue and First Alley West of Central Avenue in the City of Glendale, California. The project involved the removal and replacement of concrete curbs and gutters on Burchett Street; selective removal and repair of broken and damaged curbs and gutters, driveway and alley approaches, sidewalks, and deteriorated asphaltic concrete pavement; installation and reconstruction of curb ramps meeting current Americans with Disabilities Act guidelines; surface grinding of existing asphalt concrete pavement; placement of Asphalt Rubber Hot Mix surface course; upsizing of approximately 2,930 linear feet of sanitary sewer main; selective removal and repair of sanitary sewer main; modification of traffic signal systems at ten intersections; installation of fiber optic
Dunlap Acres Revitalization Program
Incorporated in November 1989, the City of Yucaipa’s recently adopted first full 20-Year General Plan Update describes Dunlap Acres as having “a rich history dating back to the Serrano Indians and the later settlers who ranged in the area. The area extends south of Yucaipa Boulevard and west of Oak Glen Road. Due to a history of flooding, the area retains a more rural character, with lower density residential developments on generally larger lots, limited animal keeping, and equestrian uses”. That said, resolutions in the Update focus on how to improve the safety and livability of neighborhoods, and Dunlap Acres is a focal point in attaining those goals. Roads and other infrastructure have been threatened over time because of flooding and even the types of vehicles on those roadways that tend to impinge on safe travel. Yucaipa’s City Council has been committed to improving transportation options in ways that preserve
Westley, CA @ Interstate 5 – Asphalt Replacement with Concrete Pavers
Located in Westley, California at exit 441 on I-5, Howard Road handles a tremendous amount of heavy truck traffic. The Stanislaus Public Works Department was faced with the challenge of designing a long-term, economical pavement solution for the frontage road. Given that the asphalt pavement had failed, the County looked at interlocking concrete pavers as the innovative solution. Given design parameters of an R-value of <5 for the subgrade soils and a Traffic Index of 11, the Public Works staff designed the pavement section that called for the 80 millimeter thick concrete pavers in a herringbone laying pattern. The pavement section required 14 inches of compacted Caltrans Class 2 aggregate and a layer of biaxial geogrid installed over the compacted subgrade for additional structural support. Stanislaus County received six bids ranging from $4.50 to $6.00/sf to install the concrete pavers. Earth Shelter Developers was awarded the concrete paver installation. With
East Campbell Avenue Portals Project (Finalist)
In Campbell, the East Campbell Avenue Portals Project transformed East Campbell Avenue under the Highway 17 overcrossing from a dark, uncomfortable pathway with narrow sidewalks and bike lanes to a welcoming multimodal facility with widened bicycle lanes and separated pedestrian portals on both sides of Campbell Avenue. The project removed curtain abutment walls and installed new retaining and tie-back walls to provide 26-foot wide portal openings behind existing abutment walls. Benefits to the general public include better bicycle and pedestrian connectivity for residents through the underpass; public art, terraced landscaping, and ornate columns; more comfortable walkway separated from moving traffic and running between the Historic Downtown/Downtown Campbell Light Rail Station and the PruneYard Shopping Center and residences on Union Avenue and east of Bascom Avenue. The Portals Project has opened up a new, functional, and beautiful entrance to Downtown Campbell.
Main Street Rehabilitation Project
PROJECT DESCRIPTION The City of Placerville Main Street Rehabilitation Project was designed, bid, and constructed in three phases, each with its own unique challenges: Phase 1A – Water Line Replacement, Phase 1B – Sewer Cured in Place Pipe (CIPP) Lining, and Phase 2 – Pavement Rehabilitation and Streetscape SUSTAINABILITY The construction of the new water main and water services eliminated the need for continuous water system repairs and all of the old system’s water leaks and losses. An average water system has approximately 10% losses. Based on the observed conditions of the existing system, it was apparent that the water losses were in excess of 10%. Therefore, the new water system should conserve over 10% of previous water usage. The installation of the CIPP sewer pipe eliminated the need for continuous sewer main repairs. By eliminating the cracks and leaky joints, seepage and groundwater pollution were greatly reduced. Lighted bollards