Local Project Listing (2018)
Colorado Bridge Repairs
Location North K St and Needles Hwy City or County Responsible for Project Needles Author Marc Richards Organization City of Needles Address 817 Third St. Needles, Ca. 92363 Phone 760-220-9027 Project Description This bridge crosses the Colorado River from California to Arizona and maintenance is shared with Arizona. The bridge needs to be raised to original specs and also needs resurfacing.
Chilco Street Streetscape Improvements
Location Chilco Street near Constitution Drive City or County Responsible for Project City of Menlo Park Category Complete Streets Projects Author Nicole Nagaya Organization City of Menlo Park Address 701 Laurel St Phone 6503306770 Project Description The Chilco Street Streetscape project is an example of a successful partnership between private development and government to complete major street improvements. In early 2015, Facebook submitted an application for the proposed redevelopment of a site located at 301-309 Constitution Drive, which included construction of 2 new office buildings of over 900,000 square feet, a 200-room hotel, and publicly-accessible open space and a new pedestrian bridge over Bayfront Expressway. Chilco Street is a two-lane roadway connecting Menlo Park’s Belle Haven neighborhood, across the inactive Dumbarton Railroad right-of-way, and Bayfront Expressway. Chilco Street had a posted speed of 40 miles per hour and standard bicycle lanes, but no sidewalks or walking facilities. Being a link
North Santa Monica Boulevard Complete Street Reconstruction
Location N. Santa Monica Blvd, between Wilshire Boulevard and Doheny Drive City or County Responsible for Project City of Beverly Hills Category Complete Streets Projects Author Michelle Tse Organization City of Beverly Hills, Public Works Department Address 345 Foothill Road Phone 310-288-2821 Project Description As one of the main thoroughfares through the City of Beverly Hills, N. Santa Monica Blvd. has helped define Beverly Hills since the 1930’s and remains the ‘Mother Road’ to Beverly Hills. This famous road had deteriorated, sidewalks cracked, sections of curb/gutter and drainage inlets damaged and/or missing from decades of use (50,000+ vehicles daily) requiring a full reconstruction from subbase to surface for 1.5 miles of roadway extending from Wilshire Blvd. to Doheny Drive. The project represents a Complete Street project that includes aesthetically pleasing native landscapes, environmentally efficient LED street lights, fiber optic conduit, new curbs, gutters, and sidewalks with new ADA approved access
Miller Avenue Streetscape Plan
Location Miller Avenue from Sunnyside to Almonte City or County Responsible for Project City of Mill Valley Category Complete Streets Projects Author Andrew Poster Organization City of Mill Valley Address 26 Corte Madera Avenue Phone (415) 384-4800 Project Description Miller Avenue functions as a central corridor serving the circulation, commerce, recreation, and experiential needs of Mill Valley. The Miller Avenue Streetscape Plan balanced a need to improve critical infrastructure and safety features while preserving the unique character of Mill Valley. The 2-mile thoroughfare is filled with unique character and five “rooms” that define the history of the street. The development of the Plan involved an extensive community-based planning process that incorporated multi-modal features along the corridor and highlighted historical conditions, surveyed community sacred places, identified minimal change options, evaluated existing trees and introduced water quality features to improve the quality of storm water released to the Corte Madera Creek Watershed.
Madonna – Los Osos Valley Road Rehabilitation Project (Finalist)
Location Madonna & Los Osos Valley Road City or County Responsible for Project City of San Luis Obispo Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Brian Nelson Organization City of San Luis Obispo Address 919 Palm Street Phone 805-781-7113 Project Description The City of San Luis Obispo recently completed the largest roadway maintenance and rehabilitation project in its history on two heavily utilized arterial streets: Madonna and Los Osos Valley Roads. The roads service approximately 25,000 vehicles daily and are crucial to mobility connections for residents and thousands of commuters. This project enhanced the City’s multimodal transportation improvement goals and utilized a variety of techniques to save taxpayer money and reduce environmental impacts. Part of the City’s comprehensive Pavement Maintenance Plan (PMP), the $2.6m project covered an area of 1.17m SQFT, and was designed to emphasize maintenance of arterial streets. One goal of this plan
The Autumn Parkway Project
Location Coleman Avenue to West Julian Street City or County Responsible for Project City of San Jose Category Complete Streets Projects Author Lam Cruz Organization Department of Transportation Address 200 East Santa Clara Street, San Jose, CA 95113 Phone 408-794-1962 Project Description The Autumn Parkway Project is a vital transportation investment which supports the City of San Jose’s long term economic success strategy. The City has identified the development of the Diridon Station Area as an important area of job growth and the Autumn Street Parkway provides a new connection to this area. The Diridon Station Area currently includes the SAP Center as well as transit services such as Valley Transportation Authority (VTA) light rail, VTA bus service, Caltrain, Capitol Corridor, ACE rail, and AMTRAK. In the near future Diridon Station will expand as a major Bay Area transit hub with new transit service including BART and California High-Speed Rail
The Ocala Avenue Project
Location Ocala Avenue City or County Responsible for Project City of San Jose Category Safety or Intelligent Transportation System Projects Author Lam Cruz Organization Department of Transportation Address 200 East Santa Clara Street, San Jose, CA 95113 Phone 408-794-1962 Project Description The Ocala Avenue Improvements Project implements a variety of traffic safety, roadway configuration and infrastructure improvements along Ocala Avenue between Daytona Drive and Capitol Expressway. Ocala Avenue is a key corridor within the East San Jose area that serves a large residential neighborhood, Meyer Elementary School, Overfelt High School, Hank Lopez Community Center, and nearby parks. The project improves the connectivity for all users by providing a safer walking and biking corridor to and from key destinations, including Valley Transportation Authority’s (VTA) transit system. Previous roadway conditions consisted of a very wide street with one lane in each direction and a median striped turning lane, standard Class II bike
City of Elk Grove, 2017 Roadway Resurfacing and Rehabilitation Project
Location Various locations throughout the City of Elk Grove (see supporting documentation) City or County Responsible for Project City of Elk Grove Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Jeff Werner Organization City of Elk Grove, Department of Public Works Address 8401 Laguna Palms Way, Elk Grove, CA 95758 Phone 916-478-3602 Project Description The City of Elk Grove undertakes a roadway rehabilitation and resurfacing project annually, to extend the lifespan of streets, bike paths, repair sidewalks, concrete curb ramps and other hardscape features, and improve traffic calming features. Over the past three years, the City hired Psomas as construction manager, to assess streets programmed for rehabilitation or resurfacing, assist with alterations to project plans and specifications, and manage the project during construction. The assessment process begins each winter with construction occurring during spring through early fall. This preventative maintenance approach saves the City money by
Advance Adaptive Traffic Management System (AATMS)
Location City of Sunnyvale – Citywide City or County Responsible for Project City of Sunnyvale Category Safety or Intelligent Transportation System Projects Author Shahid Abbas Organization City of Sunnyvale Address Department of Public Works – 456 West Olive Avenue, Sunnyvale, CA 94088-3707 Phone 408-730-7330 Project Description The purpose of this Project was to replace the City’s existing outdated and proprietary client/server central traffic management system with a modern web-based Advanced Adaptive Traffic Management System (AATMS) Central System Software that uses state of the art web-based technology on the server and thin clients which use leading browsers with no additional client software needed on the client workstations. In 2015, the City of Sunnyvale implemented a pilot project by installing AATMS system controllers and software at one of its busiest roadway segments Mathilda Avenue and State Route 237 interchange (a.k.a. The Monster). The pilot project showed great success in managing traffic safely
Rancho Cordova Citywide Intelligent Transportation System Project (Finalist)
Location Citywide City or County Responsible for Project City of Rancho Cordova Category Safety or Intelligent Transportation System Projects Author Albert Stricker Organization City of Rancho Cordova Address 2729 Prospect Park Drive, Rancho Cordova, 95670 Phone 916-851-8713 Project Description The City of Rancho Cordova (City) is pleased to submit our Citywide Intelligent Transportation System project to the League of California Cities for consideration for an Outstanding Local Streets and Roads Project Award. The City invested $5.5 million to construct an intelligent transportation system (ITS) that fully connected the City network, paves the way for a future with autonomous vehicles, increases safety, and transcends jurisdictional boundaries by providing integration with neighboring Sacramento County (a first of its kind in the region). In 2010, the City of Rancho Cordova prepared an Intelligent Transportation Systems Master Plan that led to two major grants from Caltrans and SACOG for a combined total of $4
Willowbrook Area Access Improvements and Wayfinding Project
Location Willowbrook City or County Responsible for Project Los Angeles County Category Complete Streets Projects Author Leslie Schenk Organization Los Angeles County Department of Public Works Address 900 South Fremont Avenue, Alhambra, CA 91803 Phone (626) 458-5946 Project Description The County of Los Angeles (County) Department of Public Works (Public Works) implemented the Willowbrook Area Access Improvements and Wayfinding Project (Project) to preserve and enhance sustainability of the local transportation system. The implementation of the Project involved strong partnerships and collaboration between multiple agencies, County departments, and the community. This Project helps fulfill Public Works’ commitment to “Invest in Community Sustainability”. The Project limits include Wilmington Avenue between Imperial Highway and 120th Street, 119th Street between Wilmington Avenue and Willowbrook Avenue, and 120th Street between Compton Avenue and Wilmington Avenue in the unincorporated Los Angeles County area of Willowbrook. The Project improved the quality of life in the Willowbrook community
California Incline Bridge and Idaho Avenue Pedestrian Overcrossing Replacements
Location Santa Monica, CA City or County Responsible for Project City of Santa Monica Author Zach Pollard, PE Organization City of Santa Monica Address 1437 4th Street, Suite 300, Santa Monica, CA 90401 Phone 310-458-2200 Project Description Constructed by the City of Santa Monica, working closely with Caltrans, the California Incline Bridge and Idaho Avenue Pedestrian Overcrossing (Idaho Avenue POC) are two interrelated bridges that replace deteriorating, seismically deficient structures. The California Incline Bridge is a major connector street, beginning atop the steep slopes of Pacific Palisades Park and carrying vehicles, pedestrians, and bicyclists down to Pacific Coast Highway (PCH) at the base of the bluffs near Santa Monica State Beach. The 750-foot-long bridge has a total width of 52 feet to incorporate a new barrier-separated, multiuse bicycle/pedestrian path. Project challenges included a tightly confined construction site and the protection of erodible bluff slopes in an urban environment alongside the
Local/Residential Street Improvement Project (Phase VII)
Location Kenneth Rd, Scott Rd, Tulare St, Victory Pl, Santa Anita Ave, Haven Way City or County Responsible for Project City of Burbank Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Artin Megerdichian Organization City of Burbank Address 150 North Third Street Burbank, CA 91502 Phone 818-238-3915 Project Description City of Burbank’s Phase VII of Local/Residential Street Improvement project repaved qualified streets in two neighborhoods in the City. The project resurfaced a total of 110 City blocks (32 lane miles) using 17,000 tons of rubberized asphalt (ARHM), which uses crumb rubber from recycled tires – a total of 340,000 discarded tires were recycled for this project. The project also reconstructed and improved 170 pedestrian curb ramps to meet Americans with Disabilities Act guidelines, reconstructed over 23,000 square feet of damaged sidewalk, driveway and alley approaches, and reconstructed over 3,500 linear feet of curbs and gutters. In
Alleghany Road over Oregon Creek Bridge Rehabilitation (Finalist)
Location Highway 49 & Alleghany Road, Northern Yuba County City or County Responsible for Project Yuba County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Michael Lee, PE Organization Yuba County Department of Public Works Address 915 8th Street, Suite 125, Marysville, CA 95901 Phone (530)749-5420 Project Description The Alleghany Road over Oregon Creek Bridge Rehabilitation Project involved rehabilitating the historic wooden covered truss bridge in the Tahoe National Forest in northern Yuba County. The bridge is listed in the Caltrans Historic Bridge Inventory as a Category 1 Historic Bridge. The bridge is also listed in the National Register of Historic Places (NRHP 75000499). The bridge was closed to vehicular traffic due to possibility of “catastrophic collapse”. The proposed project was necessary to improve public safety by providing a safe river crossing for all passenger sized vehicles as well as small Forest Service fire trucks. This
City of Atascadero 2017 F-14 Pavement Rehabilitation Project
Location Carmelita Road, Alcantara Avenue, Cortez Avenue, Monterey Road City or County Responsible for Project City of Atascadero Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Ryan Hayes Organization City of Atascadero Address 6500 Palma Avenue Phone 805-470-3424 Project Description The 2017 F-14 Pavement Rehabilitation Project (Project) was consisted of four separate roadways, grouped together into a single roadway project. Total yearly budget for the F-14 Projects is approximately $2 million, and is managed through design and construction by City staff. The City utilizes consultants for roadway testing and preparation of project Plans and Specifications. For the 2017 Project, a total of 2.3 lane miles of pavement were rehabilitated ( 12,200 square feet). Existing roadway PCI’s ranged from a low of 21 to a high of 34. As the first task during design, coring and pavement deflection testing determined that a significant portion of the roadway
Twin Peaks Blvd Cold In-Place Recycling Pavement Renovation Phase 2
Location Twin Peaks Blvd, San Francisco, CA City or County Responsible for Project City & County of San Francisco Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Ophelia Lau Organization San Francisco Public Works Address 1680 Mission St, 4th Floor Phone 415-554-8350 Project Description Twin Peaks Blvd sits on top at one of the highest peaks of San Francisco, CA which provides a breathtaking view of the skyline of San Francisco. The area is frequently visited by tourists and many residents of the Bay Area. “Eureka” (North) and “Noe” (South) are the two peaks which the roadway wraps around to create the ‘Figure 8’ where stunning 360-degree views of the city and the surrounding Bay Area are showcased. With the frequent visitors and usage of the area, the approach was to utilize an emerging technology paving method of Cold In-Place Recycling (CIR) with an overlay which
McDonnell Avenue, Et Al
Location East Los Angeles City or County Responsible for Project Los Angeles County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Leslie Schenk Organization Los Angeles County Department of Public Works Address 900 South Fremont Avenue, Alhambra, CA 91803 Phone (626) 458-5946 Project Description The County of Los Angeles Department of Public Works is committed to “preserve the long-term well-being and resiliency of our communities and the environment by investing in infrastructure, promoting economically sound, socially desirable, and environmentally healthy projects” as stated in our strategic plan. The McDonnell Avenue, Et Al project, completed in September of 2017, was an outstanding example of this commitment as it used many sustainable design elements to improve numerous local roads within the unincorporated community of East Los Angeles. Several sustainable pavement reconstruction treatments were used that recycle the existing material and/or use recycled material making this project both cost
US Route 66 Bridge Preservation Program (Finalist)
Location National Trails Hwy between the Cities of Barstow and Needles City or County Responsible for Project County of San Bernardino Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Sundaramoorthy (Sri) Srirajan, M.S. P.E Organization County of San Bernardino Department of Public Works Address 825 E. 3rd Street, Room 143, San Bernardino, CA 92415-0835 Phone (909) 387-8166 Project Description National Trails Highway (NTH), also known as Historic Route 66, was established as one of America’s first transcontinental highways. The County of San Bernardino is responsible for maintaining NTH between the Cities of Barstow and Needles. This corridor, the longest remaining original section of Historic Route 66, containing 127 timber bridges, was built between 1929 and 1931. This section of highway is critical to the economic vitality of an underserved rural region larger than some U.S. states, provides the only by-pass to Interstate 40, and is deemed
San Bernardino County Pavement Management Program
Location County Wide City or County Responsible for Project County of San Bernardino Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Sundaramoorthy (Sri) Srirajan, M.S., P.E. Organization County of San Bernardino Department of Public Works Address 825 E. 3rd Street, Room 143, San Bernardino, CA 92415-0835 Phone (909) 387-8166 Project Description The County of San Bernardino has over 2,100 miles of paved roadway under its jurisdiction, which becomes a challenge to maintain with limited funds. Road surface quality is determined by a score from 0 to a 100 called the Pavement Condition Index (PCI), with 0 indicating a completely failed road and 100 indicating a new or resurfaced road. Paved roads deteriorate over time based on traffic, weather, sunlight, and other factors. As the PCI of a roadway drops, the cost of rehabilitation escalates exponentially if not addressed in a timely manner. The County developed a
Foothill Middle School and Walnut Acres Elementary School Pedestrian and Bicycle Improvements
Location Wiget Lane & Cedro Lane, Walnut Creek City or County Responsible for Project Walnut Creek Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Katie Bruner Organization City of Walnut Creek Address 1666 N Main Street, Walnut Creek, CA 94596 Phone 925-256-3536 Project Description The Foothill Middle & Walnut Acres Elementary Schools Pedestrian & Bicycle Improvements Project was the result of community advocacy and collaboration between schools, the Mount Diablo Unified School District, parents, and the City of Walnut Creek. In November 2015, an ad hoc neighborhood committee approached the City regarding several issues with access to the Walnut Acres Elementary & Foothill Middle schools. Parents and school personnel witnessed speeding in the neighborhood, near collisions on streets around the schools, and even a student hit by a car outside of the middle school. After several meetings in local coffee shops, schools offices, and on-site reviews,
East Fork Road Bridge over North Fork San Gabriel River Project
Location In the San Gabriel Mountains, Los Angeles County City or County Responsible for Project Los Angeles County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Leslie Schenk Organization Los Angeles County Department of Public Works Address 900 South Fremont Avenue, Alhambra, CA 91803 Phone (626) 458-5946 Project Description The East Fork Road Bridge over North Fork San Gabriel River Project (Project) is a 642-feet long, steel truss bridge built in 1949. It is located in the San Gabriel Mountains National Monument just north of the City of Azusa and provides access to Los Angeles County Fire facilities and recreational amenities such as the East Fork Trail that leads to the “Bridge to Nowhere”. The Project consisted of seismically retrofitting the bridge to prevent collapse after an earthquake. It demonstrates a high level of complex structural engineering and innovative use of technology. Respecting the environment and
Garnet Bridge Over Mill Creek Replacement
Location Garnet Street at Mill Creek, Mentone Area City or County Responsible for Project County of San Bernardino Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Sundaramoorthy (Sri) Srirajan, M.S., P.E. Organization County of San Bernardino Department of Public Works Address 825 E. 3rd Street, Room 143, San Bernardino, CA 92415-0835 Phone (909) 387-8166 Project Description The project replaced the existing Garnet Street Bridge that traverses the Mill Creek Wash in the community of Mentone. The bridge was constructed in 1925 and placed in its current location in 1941. The original bridge was a metal truss structure atop concrete footings built as part of a concrete and rock abutment on the north and south sides of the wash and was 159 feet long with a width of only 17 feet, 10 inches from rail-to-rail. Average Daily Traffic for Garnet Street in the project location is 2,610
Carson Street Master Plan
Location I-405 Exit on Carson Street to I-110 on Carson Street City or County Responsible for Project City of Carson Category Complete Streets Projects Author Garrett Roberts Organization City of Carson, Public Works Department Address 701 E. Carson Street, Carson, California 90745 Phone (310) 952-1700 Ext. 1125 Project Description The Carson Street Master Plan was envisioned in 2001 to encourage economic development within a diverse but disadvantaged community. It was implemented with a public investment along a 1.75-mile mixed-use corridor positioned between the I 405 and I 110 freeways. The City of Carson’s motto is “Future Unlimited”, and this project emphasizes a positive shift for the community. This project transforms a formerly incongruous area into a vibrant and cohesive pedestrian-friendly environment, and revitalizes Carson’s “downtown” commercial district and Civic Center. Included among the improvements were expanded sidewalks, enhanced bike lanes, decorative crosswalks, modern bus shelters, pedestrian lighting, drought-tolerant landscaping, and
Susana Road Reconstruction Project (Finalist)
Location Susana Road, Unincorporated Community of Rancho Dominguez City or County Responsible for Project County of Los Angeles Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Leslie Schenk Organization Los Angeles County Department of Public Works Address 900 South Fremont Avenue, Alhambra, CA 91803 Phone (626) 458-5946 Project Description The County of Los Angeles Department of Public Works has utilized sustainable pavement treatments with great success since 2008. We continue our commitment to preserving and improving the quality of our roads in a cost effective and environmentally responsible way. The statewide mandate (AB32) to reduce greenhouse gas (GHG) emissions with limited budgets were key motivators for developing our sustainable approach that included (1) focusing on preserving roads in good condition first; (2) using recycled materials in pavement treatments; and (3) reutilizing materials in place when reconstructing our roads. The Susana Road Project showcases the benefits when
Harrison Street Safety Improvement Project
Location Harrison and 23rd Streets, Oakland City or County Responsible for Project Oakland Category Complete Streets Projects Author Nicole Ferrara Organization OakDOT Address 250 Frank Ogawa Plaza, Oakland, CA 94612 Phone 510-238-4720 Project Description After the tragic death of a senior walking across the street at the intersection of Harrison and 23rd, the City of Oakland’s new Department of Transportation (OakDOT) jumped into immediate action to prevent other community members from suffering a similar crash. Within 10 weeks, the City installed its first set of comprehensive swift and effective safety improvements to build a safe street for people walking, biking, taking transit, and in vehicles. The project aimed to address the main crash pattern that resulted in the fatal crash: a difficult left turn from a minor street onto a six-lane arterial right next to the City’s largest senior center and most treasured park, Lake Merritt. But the project didn’t
Drones- A Public Works Modern Tool
Location 1810 E. Hazelton Ave, Stockton, California 95209 City or County Responsible for Project San Joaquin County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Awni Taha Organization Public Works – San Joaquin County Address 1810 E. Hazelton Avenue, Stockton, CA 95209 Phone 2099537619 Project Description San Joaquin County initiated a program to help improve productivity and increase the efficiency of various tasks while promoting a safer work environment for the employees and residents of San Joaquin County. The Department of Public Works now utilizes unmanned aerial systems (drones) to decrease the occupational risks, provide pre and post site conditions and increase efficiencies of surveying and inspection activities.
Teresa and Delta Avenue Pavement Preservation Project
Location Unincorporated Community of South San Gabriel, Teresa and Delta Ave. City or County Responsible for Project County of Los Angeles Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Leslie Schenk Organization Los Angeles County Department of Public Works Address 900 South Fremont Avenue, Alhambra, CA 91803 Phone (626) 458-5946 Project Description In September 2017, the Teresa and Delta Avenue Project (Project) was completed in the unincorporated community of South San Gabriel. It serves as one of seven neighborhood pavement preservation projects completed by the County of Los Angeles Department of Public Works (DPW) this past year. The 11.7 lane-miles of residential roads had an average Pavement Condition Index of 59 (fair condition). The goal of this Project was to use preservation treatments as a stopgap measure to extend the service life of the roads until funding becomes available for more permanent repairs. Typically, stopgap measures
Retrofit and Rehabilitation of Georgia Street Bridge and Retaining Walls
Location University Avenue (intersection of Georgia Street), San Diego, CA 92103 City or County Responsible for Project San Diego Author Alex Sleiman Organization City of San Diego, Public Works Address 525 B Street San Diego, CA 92101 Phone 619-533-4618 Project Description Constructed over 100 years ago as “The Gateway to Eastern San Diego,” the historic Georgia Street Bridge is a three-hinge arch bridge with extended abutment walls into two 700-foot-long grade separation retaining walls below the bridge. This bridge replaced an existing timber bridge that was removed prior to 1914 and the walls replaced a formational soil slope that was further cut to accommodate the widening of University Avenue for increased traffic. Prior to this major retrofit and rehabilitation project, the bridge and walls had undergone a substantial amount of repairs and modification including extensive patching and multiple global layers of shotcrete. Degradation of the concrete and reinforcement was visually
I-880/SR-92 Reliever Route
Location Whitesell Street between Breakwater Avenue to Depot Road, Intersection of West Winton Avenue and Hesperian Boulevard, Intersection of Hesperian Boulevard and Middle Lane and Southland Drive City or County Responsible for Project City of Hayward Category Complete Streets Projects Author Yama Farouqi, PE Organization City of Hayward Address 777 B Street, Hayward, CA 94541 Phone 510-583-4761 Project Description The I-880/SR-92 Reliever Route project merits the Complete Streets award because it represents an impressive example of how the local community can benefit from more sustainable and forward thinking public transit infrastructure efforts. Located in an industrial area north of State Route 92 and west of Interstate 880 in Hayward, California, many of the streets in this area were constructed with a major emphasis on motor vehicle access only. While the Reliever Route project is intended to greatly improve access for motor vehicles, it also considers pedestrian and bicycle transportation modes,
9th Street & Division Street – Bike and Pedestrian Improvements (Finalist)
Location 9th Street & Division Street City or County Responsible for Project City & County of San Francisco Category Safety or Intelligent Transportation System Projects Author Isabel Liang Organization San Francisco Public Works Address 1680 Mission St Phone 415-554-8205 Project Description The City and County of San Francisco adopted a road safety policy, Vision Zero, in 2014 as part of a committed effort to increase safety and reduce fatalities. The goal is to effectively eliminate all traffic fatalities by 2024. Vision Zero promotes a safer, livable and sustainable transportation system for residents and visitors of San Francisco. In San Francisco’s SoMa district, 9th St & Division St is identified as one of the higher risk intersection within the High-Injury Network. This intersection is part of a larger bicycle facility on Division St that is well-used and an essential bike route for many bicyclists traveling to the SoMa & Mission Districts.
Maude Avenue Complete Street Project
Location Maude Avenue between Mathilda Avenue & Fair Oaks Avenue City or County Responsible for Project City of Sunnyvale Category Complete Streets Projects Author Lillian Tsang Organization City of Sunnyvale Address 456 West Olive Avenue, Sunnyvale, CA 94088 Phone 408-730-7556 Project Description The study corridor is 1.3 miles long along Maude Avenue between Fair Oaks Avenue and Mathilda Avenue. It is an east-west industrial/commercial collector roadway that connects SR-237 on the west to Wolfe Road on the east. It is predominately one lane in each direction with a two-way center turn lane, providing direct access to Sunnyvale Business Park on the west, which houses businesses such as Apple Inc. and Linkedin, and direct access to Downtown Sunnyvale and Caltrain station on the south. It also provides direct access to Bishop Elementary School to the east, and several apartment complexes and retail shopping centers along both sides of the corridor. Maude
Streamview Drive Improvements Project
Location San Diego, California City or County Responsible for Project City of San Diego, Public Works Department Category Safety or Intelligent Transportation System Projects Author Steven Bliss, PE, TE, PLS Organization City of San Diego, Public Works Department Address 525 B. Street, 5th Floor, San Diego, CA 92101 Phone (619) 533-4668 Project Description Streamview Drive is a 1.3 mile long 2-lane collector located in the Oak Park and Redwood Village neighborhoods of San Diego between 54th Street and College Avenue. The design objective was to improve safety and aesthetics along the corridor, while preserving neighborhood parking. The section of road consist of one eastbound and one westbound travel lanes with a variable width median that ranges from 3 feet up to 50 feet. Parking is provided alternating between the shoulders and within the median. There are a few existing trees in the median along the road. Streamview Drive is a
Dynamic Lane Change (Finalist)
Location Soledad Canyon Road at Sierra Highway City or County Responsible for Project City of Santa Clarita Category Safety or Intelligent Transportation System Projects Author Robert Newman Organization City of Santa Clarita – Department of Public Works Address 23920 Valencia Blvd, Santa Clarita, CA 91355 Phone 661-284-1429 Project Description To address congestion and queuing at Soledad Canyon Road at Sierra Highway, one of the busiest intersections in the City of Santa Clarita during the afternoon peak, the City implemented a dynamic lane – an operational change that converts a dedicated right turn lane to a right/through lane during the p.m. peak. The change resulted in an increase in throughput of almost 10% and a decrease in travel time! The intersection of Soledad Canyon Road at Sierra Highway carries approximately 80,000 vehicles per day. During peak hours, traffic volumes can exceed the intersection capacity causing excessive delays to motorists. This project
San Jose Creek Bike Path North
Location Kellogg Avenue City or County Responsible for Project Santa Barbara County Category Safety or Intelligent Transportation System Projects Author Bill Tracy Organization County of Santa Barbara, Department of Public Works Address 4417 Cathedral Oaks Road, Santa Barbara CA 93110 Phone 805-886-1591 Project Description Construction is nearly complete on the San Jose Creek bike path in January, 2018. This heavily wooded path includes a 970-foot long Class I bike path between Kellogg Avenue and Merida Drive near Cathedral Oaks Road. The path travels from Kellogg Avenue through the open space next to the Kellogg Tennis Courts, over San Jose Creek and along the northern edge of University Open Space. The bike path includes a 140-foot bridge over San Jose Creek. Construction is expected to be complete by February 2018. The bike path is part of the 1993 Goleta Community Plan and 1999 Goleta Transportation Improvement Plan (GTIP). The total cost
Golden Valley Bridge Widening
Location Golden Valley Road @ State Route 14 City or County Responsible for Project City of Santa Clarita Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Robert Newman Organization City of Santa Clarita – Department of Public Works Address 23920 Valencia Blvd, Santa Clarita, CA 91355 Phone 661-284-1429 Project Description Dedicated as “The Connie Worden-Roberts Memorial Bridge,” the Golden Valley Road Bridge over State Route 14 (SR14) is an 8.5-mile crucial link of the Cross Valley Connector (CVC), connecting SR14 to Interstate 5. The Golden Valley Road Bridge widening project widened the existing bridge from two to six lanes, added four through-lanes, three lanes to access north and southbound SR14, installed new traffic signals, and added a new northbound access lane. In the event of freeway closures – unfortunately a common occurrence due to wildfires or severe accidents – traffic on the SR14 and Interstate 5
Wayfinding Signage
Location City-wide City or County Responsible for Project City of Santa Clarita Category Complete Streets Projects Author Robert Newman Organization City of Santa Clarita – Department of Public Works Address 23920 Valencia Blvd, Santa Clarita, CA 91355 Phone 661-284-1429 Project Description The City of Santa Clarita’s Citywide Wayfinding Signage project installed directional signage for nearly 80 miles of trails and bicycle lanes. Four types of signs were designed with the City logo using earth tone colors, and then installed along trail entrances, exits, corridors, and at transit stations. The signs make it easier for residents and visitors to navigate their way through the city. Each sign identifies the mileage to connecting trails and other areas of interests such as libraries and parks. The project was formed after the City’s Non-Motorized Transportation Plan identified a need for wayfinding signage to enhance ride-ability and increase non-vehicular use. With $217,000 of federal funding
Juan Street – Concrete Street & Water Pipeline Replacement
Location Juan Street, Between Taylor Street and Sunset Road City or County Responsible for Project City of San Diego Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Jesus Garcia Organization City of San Diego Address 525 B Street, Suite 750, MS 908A, San Diego, CA 92101 Phone (619) 533-5410 Project Description The City of San Diego and Atkins North America, Inc. teamed up to design the challenging Juan Street Reconstruction project. The existing roadway provided inadequate drainage, which frequently flooded during rain events. To achieve proper drainage, a new storm drain system was installed and the street section was changed from an inverted street to a crowned roadway section. Additionally, the replacement and upsize of an existing 8” asbestos cement to 12”PVC water pipeline was included to help serve the growing water demand. Lastly, the installation of Americans with Disabilities Act (ADA) curb ramps provides better
Five-Year Road Rehab Overlay and Slurry Seal Program
Location City-wide City or County Responsible for Project City of Santa Clarita Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Robert Newman Organization City of Santa Clarita – Department of Public Works Address 23920 Valencia Blvd, Santa Clarita, CA 91355 Phone 661-284-1429 Project Description In an effort to increase cost-effectiveness, while delivering high quality service, the City of Santa Clarita (City) opted to adopt a critical-point management system to manage its 516 miles of major and minor streets – repaving nearly100 miles of roadway annually. Using an unbiased, standardized street selection process, the City established a five-year “Road Rehab” program with a goal of increasing the City’s Pavement Condition Index (PCI) from 64 to 70 by the year 2020 through the use of additional preventative maintenance techniques, some of which are as follows: Micro surfacing with fiber, which is a technique that adds fiberglass to a
Replacement of Goleta Beach Park Bridge
Location Sandspit Road and California Highway 217 City or County Responsible for Project Santa Barbara County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Eric Pearson Organization Santa Barbara County, Department of Public Works Address 4417 Cathedral Oaks Road, Santa Barbara Ca 93110 Phone 805-681-5686 Project Description The County of Santa Barbara is pleased to provide this submittal for consideration in the Local Streets and Roads Project Awards Program. Santa Barbara Department of Public Works has in January 2018 completed a replacement bridge over the Goleta Slough at Goleta Beach Park Bridge (Br. No. 51C-058) in the County of Santa Barbara. The bridge is the only vehicle access point to Goleta Beach County Park. This beach is a region of coastline located near Goleta, California, just east of the University of California, Santa Barbara campus. A portion of the shore of Goleta Bay is managed by
2017 El Cerrito / Crystal Springs Roadway Rehabilitation Project
Location El Ceritto Ave. between Crystal Springs Rd. and Gramercy Dr. and Crystal Springs Rd. between City Limits north of Tartan Trail and El Cerrito Ave. City or County Responsible for Project Town of Hillsborough Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Misty Bradshaw Organization Town of Hillsborough Address 1600 Floribunda Ave. Phone 6503757518 Project Description The Town of Hillsborough’s 2017 El Cerrito/Crystal Springs Roadway Rehabilitation Project consisted of overlaying the existing roadways with Rubberized Asphalt Concrete (RAC). El Cerrito Avenue and Crystal Springs Road are two primary scenic thoroughfares in Town for both vehicular and bicycle traffic. The Town recognized the benefit of RAC Overlay on these roadways as compared to the traditional Asphalt Concrete Overlay for the improvement to the driving experience by creating a quieter and smoother ride, including for bicyclists; and for promoting the use of recycled construction materials. This project
Oregon Gulch Road Bridge Replacement across Morris Ravine
Location Oregon Gulch Road, 0.1 miles east of Cherokee Road City or County Responsible for Project Butte County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Raymond Cooper Organization Butte County Public Works Address 7 County Center Drive, Oroville, CA 95965 Phone 530-538-7681 Project Description Butte County Oregon Gulch Road Bridge Replacement across Morris Ravine This project is a bridge replacement funded through the Federal Highway Bridge Program (HBP) in conjunction with the Off Federal-aid System (OFS) Highway Bridge Program. In general, the project involved the replacement and the subsequent removal of an existing bridge. The new bridge, completed in the fall of 2017 was constructed on a new alignment immediately adjacent and just downstream of the previous crossing. This allowed local traffic to be preserved throughout construction. The new bridge is a single-span pre-stressed cast-in-place reinforced concrete slab type highway bridge approximately 70 feet in
Roundabout at Cliff Drive and Las Positas Road
Location Intersection of Cliff Drive and Las Positas Road City or County Responsible for Project City of Santa Barbara Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Brian D’Amour, PE Organization City of Santa Barbara, Public Works Department Address 630 Garden Street, PO Box 1990, Santa Barbara, CA 93102 Phone 805-897-2661 Project Description The Roundabout at Cliff Drive and Las Positas Road began construction in November of 2016 and was completed in April of 2017; on time and within budget. The old stop-controlled intersection experienced recurring congestion and queuing during the busy commute hours. The new roundabout improves traffic flow at the intersection and reduces congestion, while reducing fuel consumption and emissions. The improved intersection enhances safety for all modes of travel. The roundabout has been designed for future connectivity to proposed future pathways along Las Positas Road and Cliff Drive. The project also includes new
City of Santa Cruz Branciforte Creek Bicycle/Pedestrian Bridge and Multi-Use Trail Project
Location From the existing Riverwalk path under the Soquel Avenue Bridge and over Branciforte Creek to San Lorenzo Park, Santa Cruz, CA 95060 City or County Responsible for Project City of Santa Cruz Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Janice Bisgaard Organization CIty of Santa Cruz Address 809 Center Street, Santa Cruz, CA 95060 Phone 831 420 5166 Project Description The Branciforte Creek Bicycle/Pedestrian Bridge and Multi-Use Trail Project meets terms outlined in the City of Santa Cruz 2003 Lorenzo Urban River Plan recognizing the San Lorenzo Riverwalk as an important alternative transportation corridor and outlining the construction of a pedestrian/bicycle bridge to connect the existing Riverwalk path under the Soquel Avenue Bridge and over Branciforte Creek to San Lorenzo Park. Until the completion of the Branciforte Creek Bicycle/Pedestrian Bridge and Multi-Use Trail Project in September 2017, there was a gap in the Riverwalk.
Santa Clara Avenue Bike Lane and Pedestrian Improvements
Location On Santa Clara Avenue, just north of the city of Oxnard City or County Responsible for Project County of Ventura Category Complete Streets Projects Author Chris Hooke Organization County of Ventura, Public Works Agency Address 800 South Victoria Ave., Ventura, CA 93009 Phone 805-654-2048 Project Description Santa Clara Avenue Bike Lane and Sidewalk Improvements In the spring of 2017 the County of Ventura completed a project to improve the safety for vehicles, pedestrians, and bicyclists along Santa Clara Avenue near Oxnard. The project converted a narrow two-lane road with an unusually high vehicle accident rate to a multi-modal corridor, safely accommodating bicyclists, pedestrians, parking, and increased traffic. Along its half-mile length, the project added a sidewalk, bike lanes, a parking lane, wider through lanes, and a center two-way turn lane. The construction cost $649,000, including approximately $522,000 in federal HSIP funding. Construction took two months, between February and April
Gardendale Street Improvement Project
Location Gardendale Street from Lakewood Boulevard to Garfield Avenue City or County Responsible for Project City of Downey Category Complete Streets Projects Author Julio Guerrero Organization City of Downey Address 11111 Brookshire Avenue Downey, CA 90241 Phone 5629047110 Project Description The Gardendale Street Improvement Project (Lakewood Blvd. – Garfield Ave) was completed to address the need for dynamic “complete streets” that adhered to the bicycle master plan of three agencies. It included rehabilitation of a secondary arterial street that could no longer be repaired through routine street maintenance due its deterioration to a state of disrepair thereby requiring a complete rehabilitation. Additionally, the street was to be re-striped to accommodate a road diet with a bicycle lane in each direction in compliance with the City’s bicycle master plan in an effort to establish a regional east-west bike travel connection between the Los Angeles and San Gabriel River bike paths. Other
2016 Cold-In-Place Recycling Project
Location Southern portion of Bayshore Boulevard in Brisbane, CA City or County Responsible for Project City of Brisbane Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Karen Kinser, PE Organization City of Brisbane Address 50 Park Place, Brisbane, CA 94005 Phone 415.508.2133 Project Description The City of Brisbane and its residents care deeply about a wide variety of sustainability issues. Work is being done by the government, citizens, and businesses to lower the environmental impact of our activity and preserve natural habitat. The City is committed to providing a safe community which is ecologically sound and fiscally prudent; these priorities are highlighted as two of five goals in the Council-adopted Community Goals. Additionally, the City has committed to reducing its greenhouse gas emissions in accordance with AB32 through the Climate Action Plan adopted in 2015; work to update the plan for increased emissions reductions to align
Thousand Oaks Blvd Overhead Utility Undergrounding
Location Thousand Oaks Boulevard City or County Responsible for Project City of Thousand Oaks Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Nader Heydari Organization City of Thousand Oaks Address 2100 TO Blvd Phone 8054492392 Project Description The City of Thousand Oaks partnered with Southern California Edison, Spectrum, Crown Castle, and numerous property owners to greatly improve the City’s main thoroughfare by removing 1.5 miles of overhead electrical and communication wires, along with 53 electrical poles from Thousand Oaks Blvd. This included undergrounding all of SCE’s existing overhead 16kV distribution and 66kV transmission electrical lines, along with all communication lines from Spectrum and Crown Castle across the entire 1.5 mile project limits, with the 2 separate trenches placed on both sides of the street. The project limits extended across several important landmarks such as the Post Office, Auto Mall, Westlake High School, several of the City’s
Flashing Yellow Arrow – Traffic Signal Installations and Left-turn Modifications
Location Carnelian St at Banyan St, 6th St at Utica Ave, Milliken Ave at Victoria Park Ln, Milliken Ave at Terra Vista Pkwy, Milliken Ave at Mountain View Dr City or County Responsible for Project Rancho Cucamonga Category Safety or Intelligent Transportation System Projects Author Alberto Espinoza Organization City of Rancho Cucamonga – Engineering Services Department Address 10500 Civic Center Drive Phone 909-774-4051 Project Description The Flashing Yellow Arrow (FYA) was introduced to the City of Rancho Cucamonga in spring of 2017 at five signalized intersections to bring awareness, efficiency, and safety to these locations. The new traffic control devices were installed at three existing intersections located at Milliken Avenue/Victoria Park Lane, Milliken Avenue/Terra Vista Parkway, and Milliken Avenue/Mountain View Drive. The three existing signals were converted from traditional protective-permissive operation to FYA. In addition, two new traffic signals were installed at Carnelian Street/Banyan Street and Utica Avenue/6th Street with
Bellflower Boulevard at Imperial Highway Intersection Improvement Project
Location Bellflower Boulevard at Imperial Highway City or County Responsible for Project City of Downey Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Julio Guerrero Organization City of Downey Address 11111 Brookshire Avenue Downey, CA 90241 Phone 5629047110 Project Description The Bellflower Boulevard at Imperial Highway Intersection Improvement Project is an example of an innovative roadway program that proactively sought to achieve safety, preservation and sustainability goals of the statewide local street and road system. The project developed a program that sought to achieve several goals: 1) increased vehicular capacity, 2) reduced congestion, fuel consumption and Greenhouse gas emissions, 3) enhanced traffic safety and 4) promote environmentally sustainable practices. The program for the proposed project was developed in response to the Metro I-605 Freeway Corridor Hot Spots Congestion Feasibility Study. This document identified deficiencies that increasingly led to freeway congestion along the corridor, or “hot spots,”
Victor Avenue Safety Project
Location Victor Avenue between the Churn Creek Bridge and Enterprise Park City or County Responsible for Project City of Redding Category Safety or Intelligent Transportation System Projects Author Chuck Aukland Organization City of Redding Address 777 Cypress Avenue, Redding, CA 96001 Phone 530-225-4170 Project Description The City of Redding recently completed the construction of an HSIP project with the purpose of enhancing the corridor with speed reduction and traffic operation elements to improve vehicle, pedestrian and bicycle safety. The following improvements were constructed along this stretch of Victor Avenue that is just over a mile long: two round-abouts constructed; squared up intersections at Vega and Conifer to shorten the crossing distance of Victor Avenue; installed rectangular rapid flashing beacons (RRFB) at 3 locations, one of which also has a refuge island; provided high visibility crosswalks at all other crossings; constructed an 8-foot wide separated and paved multi-purpose path between Galaxy
Dunlap Neighborhood Revitalization
Location Numerous throughout Dunlap Neighborhood City or County Responsible for Project City of Yucaipa Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Raymond A. Casey Organization City of Yucaipa Address 34272 Yucaipa Boulevard, Yucaipa 92399 Phone 909-797-2489 Project Description The largest challenge that faced Yucaipa at incorporation was infrastructure as the County of San Bernardino was not nearly as proactive in providing street improvements, drainage improvements, facilities, trails, and sidewalks. City leaders have worked tirelessly to improve its local streets and roads, in addition to completing important drainage improvements and providing new public facilities. These challenges continue to be met, and today Yucaipa offers safely traveled roads throughout the community, much improved drainage systems and a number of new public facilities. One neighborhood in particular, historically referred to as “Dunlap”, presented significant challenges due largely to its location relative to the FEMA 100-year floodplain. The Dunlap
Kettleman City Safe Routes to School and Roadway Reconstruction Project (Finalist)
Location Unincorporated Community of Kettleman City, Kings County CA City or County Responsible for Project Kings County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Dominic Tyburski, P.E. Organization County of Kings – Public Works Address 1400 W. Lacey Boulevard, Hanford, CA 93230 Phone 559-852-2698 Project Description The Kettleman City Community Plan was developed as part of the Kings County 2035 General Plan adopted by the Board of Supervisors in 2010. Extensive public outreach during the plan’s development revealed residents’ primary concerns which included excessive speeds along SR41 and providing a safe route to school for their children. In 2009 a Caltrans Transportation Planning Grant was awarded to the County in the form of an Environmental Justice Grant. Recommendations from the Kettleman City Safety and Community studies, and workshops, were used as the basis for the Federal Safe Routes to School project. The program was approved
Construction of Street Improvements on Del Amo Boulevard
Location Del Amo Boulevard from Bloomfield Avenue to Norwalk Boulevard City or County Responsible for Project City of Cerritos Category Complete Streets Projects Author Fredy Bonilla Organization City of Cerritos Address 18125 Bloomfield Avenue; Cerritos, CA 90703 Phone (562) 916-1229 Project Description The project primarily resurfaced Del Amo Boulevard from Bloomfield Avenue to Norwalk Boulevard. This half-mile segment of Del Amo Boulevard connects the easterly City limits to other cities and Orange County. In addition to rehabilitating the northerly pavement the project replaced sidewalk, curb and gutter, eight ADA-accessible ramps, provided for low impact development (LID) improvements to capture all storm water and urban run-off and infiltrate it into the groundwater basin, converted the parkway and median irrigation system from potable to reclaimed water, re-established new trees and landscaping within the entirely of the parkway, and installed an interconnect conduit which will be used in a future interconnect project and/or
