Local Project Listing (2019)
County of San Diego’s “Road to 70” Road Resurfacing Program
Location San Diego County Unincorporated Area City or County Responsible for Project County of San Diego Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Mark Perrett Organization County of San Diego Department of Public Works Address 5500 Overland Avenue, Suite 320, San Diego, CA 92123 Phone 858-694-2693 Project Description The County of San Diego’s (County) Department of Public Works is responsible for maintaining nearly 2,000 centerline miles in the unincorporated county. Maintaining this extensive system of roads is complicated by the large variations in geographical settings, climate conditions, road uses, traffic volumes, soil conditions, and pavement types and ages. The County’s average Pavement Condition Index (PCI), dropped from 70 in 2012 to 60 in 2017. In April 2017, California Senate Bill 1 was approved, known as the Road Repair & Accountability Act of 2017, which provided new revenues so that cities and counties could address the
Avenida Encinas Complete Streets
Location Avenida Encinas, between Cannon and Palomar Airport Roads, Carlsbad CA City or County Responsible for Project City of Carlsbad Category Complete Streets Projects Author Craddock Stropes Organization City of Carlsbad Address 1635 Faraday Avenue, Carlsbad, CA 92008 Phone 760-602-2726 Project Description The City of Carlsbad has taken a more cost-effective and efficient approach to implementing complete streets by repurposing existing right-of-way during scheduled construction projects rather than acquiring and constructing new right-of-way. A prime example of this is a portion of Avenida Encinas between Cannon and Palomar Airport Roads that received a new road diet in May 2018 in coordination with underground installation of new sewer, water and recycled water pipelines. The city’s Mobility Element is consistent with and further enhances the state and federal requirements for complete streets by implementing a “livable streets” strategy. Livable streets recognize that each street within the city is unique given its geographic
Crawford Canyon Road Drainage Improvements and Reconstruction Project
Location Crawford Canyon Road, from Newport Boulevard to Chapman Ave in North Tustin City or County Responsible for Project Regina Hu Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Regina Hu Organization County of Orange, Public Works Address 300 N. Flower St, Santa Ana, CA 92703 Phone 714-647-3927 Project Description The Crawford Canyon Road Drainage Improvements and Reconstruction Project consisted of two phases, replacing approximately 1 mile of existing open drainage ditch on the western edge of pavement with a curb and gutter drainage system. Other major improvements included custom designed catch basins with storm drain laterals, inlet/outlet headwall weir structures, reconstruction of driveways and curb ramps, reconfiguration of the Crawford/Barrett Lane intersection, construction of a decomposed granite walking/trail surface, installation of fencing, pavement reconstruction, signing and striping upgrades, school ingress/egress improvements, and safety enhancements to pedestrian crossing. Crawford Canyon Road residents have experienced major flooding
Avenue I Corridor Improvements
Location 15th Street West to 10th Street West City or County Responsible for Project City of Lancaster Author Candice Vander Hyde Organization City of Lancaster Address 44933 Fern Avenue, Lancaster, CA 93534 Phone 661-723-5851 Project Description The City of Lancaster submitted the Avenue I Corridor Improvements, 15th Street West to 1Oth Street West project in response to LACMTA’s 2011 Call for Projects. This project was submitted under the Transportation Enhancement (TE) mode and was successful in receiving a recommendation for STIP funding through the California Transportation Commission (CTC). Avenue I functions as the northern gateway to the core of the City from State Route 14 and provides convenient access to residential homes; commercial and retail businesses; professional offices and automotive services; as well as entertainment and recreation venues. The previously existing right-of-way (ROW) improvements along Avenue I were inadequate, incomplete and deteriorating. This Complete Streets project made “right size” safety
Revive 25 Program
Location Various Locations Throughout Lancaster City or County Responsible for Project City of Lancaster Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Luis Garibay Organization City of Lancaster Address 615 West Avenue H, Lancaster, CA 93534 Phone 6617236110 Project Description In 2015, the City of Lancaster launched the Revive 25 Program — an ambitious plan to ‘revive’ every road in Lancaster by 2025. The Revive 25 goal would require staff to retool the City’s existing pavement management program, finding creative ways to treat more roads each year with essentially the same resources. As a result, the City created a long-term strategy which placed a larger emphasis in pavement preservation, streamlined the pre-construction process, and incorporated more sustainable treatments. Under the Revive 25 program, the City has made tremendous progress towards its goal including: – Revived over 400 lane miles of roads — approximately 25% of the
Balfour Road Shoulder Widening Project
Location Balfour Road from Bixler Road to Sellers Avenue City or County Responsible for Project Contra Costa County Public Works Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Adelina Huerta Organization Contra Cost County Public Works Address 255 Glacier Drive Martinez, CA 94553 Phone 925 313-2305 Project Description Contra Costa County is dedicated to providing public services which improve the quality of life of our residents using innovative and sustainable techniques whenever feasible. The County’s Balfour Road Shoulder Widening Project reconstructed and widened 3 miles of a 20-foot wide roadway with 2 10-foot-wide travel lanes to a 36-foot paved roadway with 2 12-foot wide travel lanes and 6-foot wide paved shoulders. The project is located in unincorporated Contra Costa County between the City of Brentwood and Town of Discovery Bay. The completed roadway includes 12-foot wide left turn pockets at the Byron Highway and Bixler Road
Marsh Creek Road Bridge Replacement Project
Location 12801 Marsh Creek Road, Clayton, CA 94517 City or County Responsible for Project Contra Costa County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Neil Leary Organization Contra Costa County Public Works Address 255 Glacier Drive, Martinez, CA 94553 Phone 925-313-2278 Project Description The goal of the Marsh Creek Road Bridge Replacement Project is to replace the existing structurally deficient and geometrically obsolete steel girder bridge in the valley near Mount Diablo State Park with a wider, concrete girder bridge that is 100 year flood compliant and built to current safety standards, while accommodating current heavy traffic and minimizing impact to local stakeholders and ecosystem. The replacement bridge was constructed in several stages as it overlaps the existing bridge over steep creek bank slopes. The project also required the construction of a wider roadway alignment, soldier pile retaining wall, temporary soil-nail shoring walls, water main
Elmwood Elementary School Access Improvements
Location Ardelle Avenue from West End to Bird Avenue; Bird Avenue from Ardelle Avenue to Garden Acres Community Center City or County Responsible for Project San Joaquin County Category Complete Streets Projects Author Kris Balaji Organization San Joaquin County Department of Public Works Address 1810 E. Hazelton Avenue Phone (209) 468-3000 Project Description For decades, pedestrians, including many school children, within the disadvantaged Garden Acres community were forced to share Ardelle Avenue with vehicular traffic due to a lack of sidewalks. However, that all changed when San Joaquin County’s diligence in pursuing grant opportunities paid off. Public Works was first successful to receive a Community Development Block Grant for the Elmwood Elementary School Access Improvements (Project) design and environmental efforts. Subsequently, the Project was awarded a second grant from the Alternative Transportation Program for the project construction. Together, these grant funds made the Elmwood Elementary School Access Improvements project possible.
Traffic Signal System Modernization and the North County Intelligent Transportation System (ITS) Expansion projects
Location Lancaster, CA City or County Responsible for Project City of Lancaster Author Candice Vander Hyde Organization City of Lancaster Address 44933 Fern Avenue, Lancaster, CA 93534 Phone 6617235851 Project Description Traffic Engineering Blossoms with Intellectual Modernization: The City of Lancaster has just completed two of its greatest traffic engineering projects to date, the Traffic Signal System Modernization project and the North County Intelligent Transportation System (ITS) Expansion project. These projects are being submitted as one application because they come out of the City’s Transportation Communications Master Plan, and ultimately the intended and achieved results of these projects are completely reliant upon the success of each other. These projects required multi-jurisdictional coordination with the City of Palmdale and Los Angeles County, including funding source collaboration. The Traffic Signal System Modernization project replaced the City’s aging traffic signal communications system infrastructure with a more reliable, redundant, and faster system based on
BlueTOAD Connected Vehicle Technology
Location Throughout City of Carlsbad (180 signalized intersections) City or County Responsible for Project City of Carlsbad Category Safety or Intelligent Transportation System Projects Author Craddock Stropes Organization City of Carlsbad Address 1635 Faraday Avenue, Carlsbad CA 92008 Phone 760-602-2726 Project Description The City of Carlsbad implemented connected vehicle technology that allows staff and the public to use real-time interactive maps and the traffic data analytics reporting system to more efficiently manage traffic flow. The system provides alerts to staff in the city’s Traffic Management Center when traffic congestion is present so that issues can be diagnosed and corrected remotely without visiting the field. Leveraging this technology also enhances the city’s efforts to implement Transportation Demand Management programs in line with the city’s General Plan Mobility Element and Climate Action Plan, resulting in greenhouse gas emission reductions. TrafficCast’s BlueTOAD Spectra DSRC Roadside Units are being used to collect data from
11th Street East Tracy Overhead Bridge Replacement
Location 11th Street and MacArthur Drive City or County Responsible for Project City of Tracy Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Zabih Zaca Organization City of Tracy Address 333 Civic Center Plaza, Tracy, CA 95376 Phone 209.831.6452 Project Description The 11th Street Bridge is a major thoroughfare in the City of Tracy. The original bridge provided vehicular access over three active Union Pacific Railroad tracks, but was too narrow to provide safe access for pedestrians and bicyclists. The recently completed 11th Street Bridge designed by Drake Haglan & Associates, Inc. provides wider traffic lanes, 4-foot median, 8-foot shoulders which also serve as Class II bicycle lanes, and barrier-separated mixed-use paths that promote the safe use across the UPRR tracks by pedestrians and bicyclists. The new bridge will assist the City in meeting their General Plan objective to achieve a comprehensive system of City-wide bikeways.
Brookwood Drive Bridge over Jacoby Creek Rehabilitation Project
Location Brookwood Drive and Jacoby Creek Road City or County Responsible for Project Humboldt County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Tony Seghetti Organization Humboldt County Public Works Address 1106 Second Street, Eureka, CA 95501 Phone 707-445-7377 Project Description Built between 1967 and 1969, the picturesque Brookwood Drive Bridge has served as the gateway into the Brookwood neighborhood for 50 years. The covered timber Warren-truss structure, with its signature red paint, crosses over Jacoby Creek near the community of Bayside in Humboldt County. In 2013, the Humboldt County Department of Public Works conducted a field inspection and bridge condition evaluation to determine what was needed to ensure the bridge would remain a safe way for pedestrians and vehicles to cross the creek for many years to come as it is the only access route into the community. The primary concern identified in the evaluation
[Resubmitted] City of Riverside ITS Connectivity and Connected Vehicle Technology Initiatives
Location Magnolia and University Avenues within the City of Riverside City or County Responsible for Project Riverside Author Nathan Mustafa Organization City of Riverside Address 3900 Main Street Phone 9518262251 Project Description Magnolia Avenue spans nearly the entire length of the City of Riverside, linking major centers of commerce such as the Galleria at Tyler and Riverside Plaza, medical institutions such as the Kaiser Medical Center and Riverside Community Hospital, educational institutions including Cal Baptist University and Riverside City College, the Central Business District, our neighboring agencies, and State Routes 91 and 60. In November of 2018 10.5 miles of fiber optic cabling went ‘live’ along Magnolia Avenue, spanning 49 signalized intersections; a project funded through a combination of Federal CMAQ and State MSRC grant dollars. This project has enabled Riverside to deploy additional traffic monitoring cameras, rapidly deploy and adjust traffic signal timing and coordination plans, and sets the
City of Riverside ITS Connectivity and Connected Vehicle Technology Initiatives
Location Magnolia and University Avenues within the City of Riverside City or County Responsible for Project Riverside Author Nathan Mustafa Organization City of Riverside Address 3900 Main Street Phone 9518262251 Project Description Magnolia Avenue spans nearly the entire length of the City of Riverside, linking major centers of commerce such as the Galleria at Tyler and Riverside Plaza, medical institutions such as the Kaiser Medical Center and Riverside Community Hospital, educational institutions including Cal Baptist University and Riverside City College, the Central Business District, our neighboring agencies, and State Routes 91 and 60. In November of 2018 10.5 miles of fiber optic cabling went ‘live’ along Magnolia Avenue, spanning 49 signalized intersections; a project funded through a combination of Federal CMAQ and State MSRC grant dollars. This project has enabled Riverside to deploy additional traffic monitoring cameras, rapidly deploy and adjust traffic signal timing and coordination plans, and sets the
Clean-Up and Repair of Transportation Infastructure, Montecito Debris Flow, Januiary 2018
Location Montecito, California City or County Responsible for Project Santa Barbara County Category Safety or Intelligent Transportation System Projects Author Bill Tracy Organization Department of Public Works, County of Santa Barbara Address 4417 Cathedral Oaks Road Phone 805-681-5694 Project Description Clean-up and Repair of Transportation Infrastructure Damage Montecito Flood, January 2018 County of Santa Barbara, Department of Public Works January 10, 2019 Clean-up and Repair of Transportation Infrastructure Damage Montecito Flood, January 2018 County of Santa Barbara, Department of Public Works January 10, 2019 Introduction On January 9, 2018 an atmospheric storm of tremendous intensity passed thru Santa Barbara County. A radar image of the storm is presented in Figure 1-Intense Storm located just to the east of Santa Barbara in the community of Montecito. Several cloudbursts began dropping rainfall at 3:34 AM at the rate of one-half inch of rain in 5 minutes, according to the County Flood Control
State Route 92/State Route 82 Interchange Upgrade
Location State Route 92/State Route 82, San Mateo, California City or County Responsible for Project City of San Mateo Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Kellie Benz Organization City of San Mateo – Public Works Department Address 330 W. 20th Avenue Phone 650-522-7282 Project Description The City of San Mateo has experienced unprecedented growth in recent years thanks largely to its proximity to Silicon Valley. To ensure intelligently managed roads, the city prioritized the upgrade of one of its busiest connectors: State Route 92/State Route 82 Interchange. Work was completed in 2018. The Interchange was a classic cloverleaf marking the middle of the city. Originally named the Route 105/Route 2 Separation, the Interchange was built in 1961/62 when city population was 69,000. In 2016, city population was just over 103,000. The Interchange connects eastbound SR 92 to Eastbay counties and westbound SR 92 to
Century Boulevard Extension from Grape Street to Alameda Street
Location Grape Street and Century Boulevard City or County Responsible for Project City of Los Angeles Category Complete Streets Projects Author Ramnik D. Mungra Organization Engineering, City of Los Angeles Address 1149 S. Broadway, Suite 810, Los Angeles, CA 90015 Phone 213-485-4526 Project Description As part of the Jordan Downs Redevelopment in the Watts Community of Los Angeles, the Century Boulevard Extension Project extended Century Boulevard from Grape Street to Alameda Street. Century Boulevard was designed and constructed as a neighborhood “Main Street” consistent with the Jordan Downs Urban Village (JDUV) Specific Plan. The project constructed a multimodal roadway where no streets, bike lanes, sidewalks, or pedestrian enhancements previously existed. This half-mile roadway serves as the spine of a 119-acre mixed use redevelopment connecting 1,800 residential units, open spaces, community facilities, and retail spaces while promoting sustainability and alternatives to car ridership by providing bus access, bike lanes, sidewalks, and
Austin Road Safety Improvements and French Camp Road Safety Improvements
Location Austin Road from French Camp road to Burnham Road; French Camp Road from Prescott Road to Jack Tone Road City or County Responsible for Project San Joaquin County Category Safety or Intelligent Transportation System Projects Author Kris Balaji Organization San Joaquin County Department of Public Works Address 1810 E. Hazelton Avenue Phone (209) 468-3000 Project Description San Joaquin County Department of Public Works utilizes a traffic collision database to help identify locations where improvements can be made to enhance safety for the traveling public. Through ongoing vigilance to improve safety, county engineers identified two roadways, Austin Road and French Camp Road, as having multiple collisions with similar factors. Based on the review of county engineers, it was determined that placement of High-Friction Surfacing (HFS) would be appropriate at these two locations. Consequently, county engineers applied for and received Highway Safety Improvement Program (HSIP) funding for the two roadway projects.
Cherokee Road Improvements
Location Cherokee Road from Sanguinetti Lane to Diverting Canal City or County Responsible for Project San Joaquin County Category Complete Streets Projects Author Kris Balaji Organization San Joaquin County Department of Public Works Address 1810 E. Hazelton Avenue Phone (209) 468-3000 Project Description Prior to improvements by San Joaquin County, Cherokee Road was a challenging area to travel through not only for vehicles but pedestrians as well. Development of the area dates back to the 1940s and 1950s, when few standards existed. Prior to the project, the pavement surface was in poor condition, rutted and riddled with cracks. The roadway also lacked an integrated storm drainage system, as only some portions had rudimentary drain inlets and intermittent roadside ditches. Other areas simply pooled or drained into the surrounding properties. Additionally, the corridor lacked pedestrian facilities despite the high volume of pedestrian traffic in the area including: schoolchildren; business patrons; and
Lammers Road Pedestrian Pathway
Location Lammers Road between Redbridge Road and Kimball High School City or County Responsible for Project San Joaquin County Category Safety or Intelligent Transportation System Projects Author Kris Balaji Organization San Joaquin County Department of Public Works Address 1810 E. Hazelton Avenue Phone (209) 468-3000 Project Description When faced with the challenge of providing a 0.6 mile pathway for area school students with only a little over two months before school was scheduled to begin, San Joaquin County engineers had to think fast. In order to provide the pathway along Lammers Road between an isolated residential area, Redbridge, and the newer Kimball High School in the City of Tracy, San Joaquin County, in collaboration with the City, took a unique approach and constructed a base rock path to allow students to walk or bike to and from the high school. This met the immediate need before school started, and allows
Del Amo Boulevard Rehabilitation
Location From Avalon Boulevard to Central Avenue City or County Responsible for Project City of Carson Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Gilbert Marquez Organization City of Carson Address 701 E. Carson Street Phone 310-830-7600 Project Description The Del Amo Boulevard Rehabilitation is a 1.05-mile East-West main Arterial between Avalon Blvd. and Central Ave. It serves as the main access road to South Bay-Pavilion Mall. To encourage economic development, Del Amo Blvd.’s poorly conditioned asphalt pavement was rehabilitated. A $1,011,489.00 public investment funded the rehabilitation. The project produced new asphalt rubberized pavement surfaces, reconstructed sidewalks for Carson Circuit Bus terminal, access ramps, ADA compliant driveways, and improved pedestrian circulation. A unique aspect of the project is that it stimulated a needed revitalization of the city’s “Mall” Shopping District by transforming a formerly incongruous area into a cohesive pedestrian-friendly environment. Included among the infrastructure improvements
Road Rehab Program
Location City-wide City or County Responsible for Project City of Santa Clarita Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Damon Letz Organization City of Santa Clarita – Public Works Address 23920 Valencia Boulevard Suite 304, Santa Clarita, CA 91355 Phone 661-255-4982 Project Description Every city has roads to maintain, but not many cities are expanding as fast as the City of Santa Clarita. When first incorporated in 1987, the City was 39 square miles. Today, the City spans over 70 square miles and home to 222,000+ residents. There are over 542 miles of major and minor streets the City of Santa Clarita is responsible for maintaining. The City of Santa Clarita realized they were holding the City’s overall average Pavement Condition Index (PCI) at a constant unsatisfactory number. The numerical index which rates street conditions between 0 (failed road) and 100 (excellent road) had been
Cook Riolo Multi-Use Pathway
Location Cook Riolo Road/Baseline Road (Roseville) City or County Responsible for Project Placer County Category Complete Streets Projects Author Jean Hanson Organization Placer County Address 3091 County Center Drive, Auburn, CA 95670 Phone 530.745.7553 Project Description October 11, 2018 was the date of the ribbon cutting ceremony for the Cook Riolo Multi-Use Pathway project. This truly community-oriented project was a success for Placer County, Dry Creek Joint Elementary School District and local residents in providing safe access for pedestrians and bicyclists to and from Creekview Ranch Middle School and the Dry Creek Greenway recreational area. This project provides an important link between the Dry Creek Community and City of Roseville and is consistent with Complete Streets principles. The effective land use has encouraged future construction of facilities within the area. Cook Riolo Road, a north-south two-lane collector, extends south from Baseline Road towards the Sacramento County line. The travel lanes
Bicycle and Pedestrian Improvements along E. Hillsdale Boulevard and Beach Park Boulevard
Location E. Hillsdale Boulevard (from westerly City limit to Gull Avenue); Beach Park Boulevard (from Gull Avenue to Foster City Boulevard) City or County Responsible for Project City of Foster City Category Complete Streets Projects Author Vivian Ma Organization City of Foster City Address 610 Foster City Blvd., Foster City, CA 94404 Phone (650) 286-3277 Project Description Foster City recently completed the “Bicycle and Pedestrian Improvements along East Hillsdale Boulevard and Beach Park Boulevard” project. As part of the City’s annual street resurfacing program, the project utilized multiple funding sources to construct improvements for all road users in a cost effective manner, including a TDA grant, SB 1, Measure A, Measure M, and Gas tax. The project consisted of bicycle and pedestrian improvements along two major corridors throughout the City – E. Hillsdale Blvd. and Beach Park Blvd. The improvements allowed an east-west bicycle connection from the City of San
Bollinger Canyon Road Widening Project
Location Bollinger Canyon Road (east of Market Place to the I-680 Freeway) City or County Responsible for Project City of San Ramon Author Theresa Peterson Organization City of San Ramon Address 2401 Crow Canyon Road San Ramon, CA 94583 Phone (925) 973-2685 Project Description The Bollinger Canyon Road Widening Project was constructed to improve safety and circulation on Bollinger Canyon Road between the I-680 Freeway and Market Place intersection in San Ramon. Bollinger Canyon Road is the City’s main arterial carrying traffic volumes as high as 60,000 vehicles per day. Prior to the implementation of this project there were substantial peak commute vehicle delay and vehicle driver complaints. This Project was completed ahead of time and within budget. The Project was completed in concert with the grand opening of the City Center – Bishop Ranch, a 300,000 square foot upscale retail center on Bollinger Canyon Road adjacent to the Project.
2018 Marin County Travel Safety Plan
Location Marin Local Arterial and Collector Roads City or County Responsible for Project Marin County Category Safety or Intelligent Transportation System Projects Author Robert Goralka Organization Marin County Public Works Address P.O. Box 4186, San Rafael, CA 94913-4186 Phone (415) 473-3076 Project Description Each year 44 collisions occur on local roads in the Marin County Region where someone is killed or severely injured (KSI). Through the Marin Public Works Association (MPWA), Marin County and the 11 cities and towns in the region partnered to conduct a systemic safety analysis and prepare a regional travel safety plan to enhance safety in the region. The scope of the study included both the unincorporated area of Marin County and the incorporated cities and towns within Marin County. Marin County was the lead project manager, a technical advisory committee (TAC) provided input during project development and each individual jurisdiction participated in preparation of the
ITS Phase IV
Location Various locations City or County Responsible for Project City of Santa Clarita Category Safety or Intelligent Transportation System Projects Author Damon Letz Organization City of Santa Clarita – Public Works Address 23920 Valencia Boulevard Suite 304, Santa Clarita, CA 91355 Phone 661-255-4982 Project Description In February 2015, the City of Santa Clarita executed a Letter of Agreement with the Los Angeles County Metropolitan Transportation Authority after successfully responding to the Metro Call for Projects to obtain Proposition C grant funds for the design and construction of the Intelligent Transportation System (ITS) Phase IV. The ITS Phase IV project builds upon the successes of the ITS Phases I-III previously completed. This phase installed the necessary infrastructure to continue expanding traveler information data collection, integration, and dissemination systems. The goal was to enhance the existing communication system by installing detection equipment and adaptive traffic signal systems at various intersections. The project
Mulholland Highway and Stokes Canyon Road, et al.
Location Unincorporated Malibu City or County Responsible for Project Los Angeles County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Leslie Schenk Organization Los Angeles County Public Works Address 900 South Fremont Avenue, Alhambra, CA 91803 Phone (626) 458-5946 Project Description The Mulholland Highway (MH) Project (Project) demonstrates that Los Angeles County Public Works is committed to preserving and improving the quality of the road system in a cost effective and environmentally responsible way. The County’s sustainable approach, cold in-place recycling (CIR) was selected as part of the pavement treatment. CIR provided substantial cost savings when compared with an equivalent hot mix alternative and demonstrated strong environmental leadership as it reduced energy consumption, greenhouse gas emissions (GHG), and landfill deposition. The Project showcases the benefits when properly applying the sustainable approach. MH is a scenic road that runs through the Santa Monica Mountains from US Route
San Joaquin County Department of Public Works Periodic Chip Seal Road Maintenance Program
Location Various locations throughout San Joaquin County City or County Responsible for Project San Joaquin County (Department of Public Works) Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Jim Stone Organization San Joaquin County Address 1810 East Hazelton Avenue, Stockton, CA 95205 Phone (209) 468-3031 Project Description San Joaquin County’s In-house Chip Seal Program (Program) allows the County to extend the life of its roads in a cost effective manner which leads to improving the overall quality and preservation of the road system. The Department of Public Works (SJCPW) has a 7-year cycle for chip sealing selected roadways. Roads are designated for the Chip Sealing program based on road conditions and traffic volumes. Roads may be chip sealed twice within a 20-year period. After the second chip seal application, roads are evaluated for more extensive rebuilding in future maintenance efforts. Yearly, the Chip Seal Program affects
Newhall Ranch Road Bridge Widening
Location Newhall Ranch Road & McBean Parkway City or County Responsible for Project City of Santa Clarita Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Damon Letz Organization City of Santa Clarita – Public Works Address 23920 Valencia Boulevard, Suite 304, Santa Clarita, CA 91355 Phone 661-255-4982 Project Description The Newhall Ranch Road Bridge Widening over San Francisquito Creek is a $16M project that provided two more travel lanes, a raised median, barrier protected sidewalks, a bike trail, and trail connection underneath the bridge. As part of cross-valley connector, this project constructed the bridge to its ultimate width, removing a bottleneck condition, and improving traffic circulation. This project is consistent with the City’s General Plan and Circulation Element and supports SC2020, the City’s 5-year strategic plan. The Newhall Ranch Road Bridge over San Francisquito Creek was originally constructed with three lanes in each direction causing one
City of Folsom, Greenback–Madison / Folsom Auburn Roadway Cold-In-Place Recycling
Location Greenback Lane – Madison Avenue / Folsom-Auburn Boulevard City or County Responsible for Project City of Folsom Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Ryan Chance Organization City of Folsom Address 50 Natoma Street, Folsom, CA 95630-2696 Phone 916-461-6713 Project Description The City of Folsom’s heavily used arterial sections of Greenback Lane, Madison Avenue and Folsom-Auburn Boulevard have been repaired by using a Cold In-Place method that has resulted in improved safety for vehicles and cyclists as well as achieved the City’s preservation and sustainability goals. Execution of complex traffic controls allowed the in-place recycling work to be performed during the daytime. Due to the significant public support for this project, temporary traffic delays created by the construction were well managed. The majority of the remainder of the project, which included an HMA overlay, striping, and improvements to several ADA ramps and driveways, was
Clinton Keith Road Extension Project
Location Between I-215 and SR-79 City or County Responsible for Project County of Riverside Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author John Marcinek Organization County of Riverside Address 3525 14th Street, Riverside, CA 92501 Phone 951-955-3727 Project Description The County of Riverside in cooperation with the City of Murrieta, RCTC and WRCOG initiated the Clinton Keith Road extension project from I-215 to SR-79, to address the need for an east-west traffic corridor in the vicinity of north Murrieta, and unincorporated French Valley. The project relieves congestion and improves safety along Los Alamos Rd as well as Scott Rd and provides commuters with improved access to the I-215 freeway. The project extends Clinton Keith Rd by approximately 3.4 miles which includes sections of widening, upgrading dirt roads and constructing a new 6 lane urban arterial road through the Murrieta hills. Due to funding constraints, the project
Clinton Keith Road Extension (Phase 2 and 4)
Location Between I-215 and SR-79 City or County Responsible for Project County of Riverside Category Complete Streets Projects Author John Marcinek Organization County of Riverside Address 3525 14th Street, Riverside, CA 92501 Phone 951-955-3727 Project Description The County of Riverside in cooperation with the City of Murrieta, RCTC and WRCOG initiated the Clinton Keith Road extension project from I-215 to SR-79, to address the need for an east-west traffic corridor in the vicinity of north Murrieta, and unincorporated French Valley. The project relieves congestion and improves safety along Los Alamos Rd as well as Scott Rd and provides commuters with improved access to the I-215 freeway. The project extends Clinton Keith Rd by approximately 3.4 miles which includes sections of widening, upgrading dirt roads and constructing a new 6 lane urban arterial road through the Murrieta hills. Due to funding constraints, the project is being constructed in phases, and to
Clinton Keith Road Extension
Location Between Interstate 215 and SR-79 City or County Responsible for Project County of Riverside Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author John Marcinek Organization County of Riverside Address 3525 14th Street, Riverside, CA 92501 Phone 951-955-3727 Project Description The County of Riverside in cooperation with the City of Murrieta, RCTC and WRCOG initiated the Clinton Keith Road extension project from I-215 to SR-79, to address the need for an east-west traffic corridor in the vicinity of north Murrieta, and unincorporated French Valley. The project relieves congestion and improves safety along Los Alamos Rd as well as Scott Rd and provides commuters with improved access to the I-215 freeway. The project extends Clinton Keith Rd by approximately 3.4 miles which includes sections of widening, upgrading dirt roads and constructing a new 6 lane urban arterial road through the Murrieta hills. Due to funding constraints, the
Hazel Avenue Widening Phase 2
Location Curragh Downs Drive to Sunset Avenue City or County Responsible for Project Sacramento County Category Complete Streets Projects Author Stephen White Organization Sacramento County Address 4111 Branch Center Road, Sacramento, CA 95827 Phone (916) 874-5354 Project Description The Project provides the following complete street elements: separated sidewalks with landscaping, bicycle lanes and bicycle detection at traffic signals, bus turn-outs, ADA upgrades including audible pedestrian signals, countdown pedestrian heads, and compliant ramps. The project also provides an additional vehicle lane in each direction to reduce congestion on this facility which serves over 50,000 vehicles/day and is a critical connection to the Hazel Avenue Bridge at the American River. These facilities provide bicyclists and pedestrians from the neighborhoods adjacent to the Project with direct access to the American River Parkway and the nearby recreation facilities at the Sacramento State Aquatic Center and the Nimbus Fish Hatchery. The Project demonstrates how an
2018 Full Depth Recycle & Overlay Project
Location Granite Creek Road & Branciforte Drive City or County Responsible for Project County of Santa Cruz Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Casey Carlson Organization County of Santa Cruz Address 701 Ocean Street, Rm 410, Santa Cruz, CA 95060 Phone (831) 454-3102 Project Description The pavement condition of the project roadway segments had degraded to a point where reconstruction of the roadway section was required. We chose to employ a full depth recycling process which pulverizes the existing pavement in place, mixes it with the underlying road base, adds cement and water and then regrades and recompacts the material to become a new strengthened road base. We were able to accomplish the work with no off-haul of materials required – all existing roadway material was re-used on site reducing truck trips required for the project, and thereby reducing emissions and wear on surrounding
Laurel Lane Complete Streets and Roadway Sealing
Location Laurel Lane (Orcutt to Johnson Ave) and misc. locations City or County Responsible for Project City of San Luis Obispo Category Complete Streets Projects Author Jennifer Rice Organization City of SLO Address 919 Palm Street Phone 8057817058 Project Description The City of San Luis Obispo’s Pavement Maintenance Plan was adopted in 1998 and uses a rotating method to provide regular preventative and corrective maintenance to City streets. One goal of this plan is to maintain 70% of the City’s 130 centerline miles of streets in good condition, as measured by the Pavement Condition Index. During the summer of 2018, the City implemented the pavement management plan by slurry sealing approximately 560,000 square feet of neighborhood streets (about 20% of City street surface area). Additional work included pavement repairs and slurry sealing of the 0.56 mile Laurel Lane arterial roadway, which incorporated new complete streets modifications. The “Roadway Sealing and
Westlake Boulevard Sidewalk & Bicycle Lane Improvements
Location Thousand Oaks, CA – Westlake Boulevard between US 101 and Triunfo Road City or County Responsible for Project City of Thousand Oaks Category Safety or Intelligent Transportation System Projects Author Nader Heydari Organization City of Thousand Oaks Address 2100 E. Thousand Oaks Boulevard Phone 805-449-2392 Project Description Westlake Boulevard (State Route 23) is a busy and active thoroughfare of the City. It is part of the City’s “scenic highway system” and a popular bicycle and pedestrian route (designated Class II bike lanes in the City’s Bicycle Facilities Master Plan). This corridor did not have continuous sidewalks, which required pedestrians to walk in the bike lanes or on the shoulder. At the U.S. 101 interchange, pedestrians and bicyclists had to navigate through the northbound and southbound on-ramps. Over the past four years there have been multiple bicycle-vehicle collisions in this area. The City received Federal Highway Safety Improvement Program (HSIP)
Farm Bureau Road Complete Streets – Phase 2
Location Farm Bureau Road between Wren and Walnut avenues City or County Responsible for Project City of Concord Category Complete Streets Projects Author ZeeLaura Page Organization City of Concord Phone 9256713059 Project Description City of Concord has used full depth reclamation to pave Farm Bureau Road between Wren and Walnut avenues. This Complete Streets Project managed by the City and sponsored by the Contra Costa Transit Authority used an innovative paving method that saves both time and money and is more environmentally friendly. Known as full depth reclamation, or FDR, this recycling process uses cement as a main component of the road base by combining the ground-up deteriorated asphalt pavement with base materials and pulverizes them in place. Cement and water are added to form a new and durable base material. Then a new top surface of asphalt is applied to create a smooth finish. Since crews don’t have to
Farm Bureau Road complete Streets Phase 2
Location Farm Bureau Road between Wren and Walnut avenues City or County Responsible for Project City of Concord Author ZeeLaura Page Organization City of Concord Phone 9256713059 Project Description City of Concord has used full depth reclamation to pave Farm Bureau Road between Wren and Walnut avenues. This Complete Streets Project managed by the City and sponsored by the Contra Costa Transit Authority used an innovative paving method that saves both time and money and is more environmentally friendly. Known as full depth reclamation, or FDR, this recycling process uses cement as a main component of the road base by combining the ground-up deteriorated asphalt pavement with base materials and pulverizes them in place. Cement and water are added to form a new and durable base material. Then a new top surface of asphalt is applied to create a smooth finish. Since crews don’t have to haul off excess soil
Palo Colorado Road Repair Project
Location Big Sur, CA City or County Responsible for Project Monterey County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Enrique Saavedra PE Organization County of Monterey Address 20 East Alisal Street, Salinas, CA 93901 Phone 831.755.8970 Project Description Big Sur suffered a historic one-two punch in 2016: The summer’s three-month-long Soberanes Fire was followed by a record-breaking rainy season. In the winter, with soil loosened by the fire, debris came down the mountain as runoff and clogged the culverts where Palo Colorado Road crosses Rocky Creek and Brandon Creek. The creek eventually blew out part of the road—cutting off 60 homes from stores, schools and workplaces. Governor Brown, followed quickly by President Trump, declared the area, along with many others impacted by the weather, a disaster. Monterey County Public Works (County) quickly addressed the emergency by establishing repairs along the half mile stretch of road
Kenney Street Pedestrian Improvements
Location Kenney Street in El Rio, Ventura County City or County Responsible for Project County of Ventura Category Safety or Intelligent Transportation System Projects Author Jeewoong Kim Organization County of Ventura public Works Agency Transportation Department Address 800 S. Victoria Avenue, Ventura. CA 93009-1620 Phone 805-654-2065 Project Description The Kenny Street Pedestrian Improvement Project has improved safety and encourages students to walk and bicycle to Rio Real Elementary School by constructing sidewalks and widening the road near the school. After many years of traffic headaches and congestion on Kenney Street, children can now safely walk or bicycle to school, and parents can easily drop off their children. The work included construction of 1,250 lineal feet of new sidewalk, curb, and gutter along the northerly side of Kenney Street, and paving 13 feet of earthen shoulder for that entire length. Crosswalks and accessible ramps were added at two intersections to promote
La Serena Way “Road Diet” Safety Improvement Project
Location La Serena Way between Margarita Road and Butterfield Stage Road City or County Responsible for Project City of Temecula Author Patrick Thomas Organization City of Temecula Address 41000 Main Street, Temecula, CA 92590 Phone 951-694-6411 Project Description The City of Temecula recently completed the installation of “Road Diet” improvements along La Serena Way between Margarita Road and Butterfield Stage Road. The goals of this project were to reduce vehicular speeds and enhance the safety of bicycles, pedestrians and vehicles traveling on the road. La Serena Way was previously configured as a four (4) lane Secondary Arterial road, providing direct access to several community parks and serving as the suggested route to school for Rancho Elementary School and Margarita Middle School. The “Road Diet” included modifying the four lane arterial to two lanes (one lane in each direction) along a two (2) mile length of roadway by installing the following