Local Project Listing (2020)
Inner Sunset Streetscape Improvements & Muni Forward
Location Irving St and 9th Ave City or County Responsible for Project San Francisco Author Denny Phan Organization San Francisco Public Works Address 30 Van Ness Ave, 5th Floor Phone 628-224-2232 Project Description Irving St is an active two-lane commercial corridor in the heart of the Inner Sunset neighborhood. It is home to approximately 19,000 residents and includes the main campus of UCSF and the gateway into Golden Gate Park. The N-Judah light rail train runs along the center of the street serving the City’s busiest line with a daily average of 50,000 riders. The project was conceived as a small transit improvement project to construct four large bulbouts to serve as dedicated transit stops with full-scale pedestrian safety improvements, landscape beautification elements, and seating for transit riders and local businesses to make the street more livable, vibrant, and sustainable. However, since the project planned to already impact the neighborhood,
Pavement Management Program
Location Cupertino, Various Locations City or County Responsible for Project City of Cupertino Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Roger Lee Organization City of Cupertino Address 10300 Torre Ave Phone 408-777-3354 Project Description Cupertino’s street network consists of approximately 138 centerline miles and is one of the City’s most valued assets. Like many other Cities, Cupertino’s Pavement Maintenance funding decreased during challenging economic times. By 2013, the average PCI had declined to 64. With an improved economy, it became clear the City needed to invest in its aging street infrastructure, as deferring maintenance would only lead to more costly repairs in the future. As a result, the City Implemented an aggressive Pavement Management Program which set a performance measures to achieve a system wide PCI of 82 or greater. Between 2013 and 2018, the City repaired or maintained approximately 653 street segments, installed 900
North Sanborn Road Safety Improvement Project
Location North Sanborn Road (from East Alisal Street to Freedom Parkway) -10 intersections City or County Responsible for Project Salinas Category Safety or Intelligent Transportation System Projects Author Victor Gutierrez Organization City of Salinas Address 200 Lincoln Avenue Phone 831-758-7241 Project Description North Sanborn Road, between East Alisal Street and Freedom Parkway, was identified as a road segment with heavy pedestrian activity and a high number of rear-end collisions, broadsides and collisions that involved pedestrians and/or bicyclists. The City of Salinas successfully received funding from the California Highway Safety Improvement Program (HSIP) to make improvements along North Sanborn Road, between East Alisal and Freedom Parkway, to address the need for safety and efficiency along this corridor. The corridor is in East Salinas, a low-income area in the City which has high pedestrian and transit/bus activity along the route to various schools (elementary, middle and high schools). The North Sanborn Road
Warnerville Road Rehabilitation
Location Between Tim Bell Road and Crabtree Road in unincorporated Stanislaus County City or County Responsible for Project Stanislaus County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author David Leamon Organization Stanislaus County Address 1716 Morgan Road Phone 2095254151 Project Description With a new funding source of Senate Bill 1 gas tax funds becoming available in 2017, the County’s Public Works team began brainstorming on long term, sustainable and innovative solutions to resolve the historically poor road conditions on the eastern portion of Warnerville Road. The targeted segment of Warnerville Road is located in eastern rural Stanislaus County and was made up of stretches of asphalt pavement, gravel, and native non-draining soils. This 5.4 mile segment of road is primarily utilized as an agricultural haul road for various agricultural products such as tree nuts and wine grapes. During harvest periods, the roads sees heavy truck loads
San Jacinto Trails Master Plan
Location Citywide City or County Responsible for Project City of San Jacinto Category Complete Streets Projects Author Rene Yarnall Organization City of San Jacinto Address 595 S San Jacinto Ave Phone 9514877330 Project Description The San Jacinto Trails Master Plan (SJTMP) is a comprehensive planning document that provides a strategic framework for the future development of a fully connected, multi-use, non-motorized trails network. The plan summarizes the City’s existing trail and multi-modal conditions to develop project recommendations that make multi-modal transportation safe and an enjoyable option. The plan strongly promotes public health through active transportation, street safety, environmental health and more. The plan aligns with regional non-motorized transportation plans and addresses sustainable community planning goals and objectives. What is unique and exemplary of the SJTMP is that its focus and priority was to establish a network of Class 1 multi-use trails, which are widely considered the safest and most comfortable
North Fremont Bike and Pedestrian Access and Safety Improvements Project
Location North Fremont Street, Monterey, CA City or County Responsible for Project City of Monterey Category Complete Streets Projects Author Andrea Renny Organization City of Monterey Address 580 Pacific Street Phone 831-646-3705 Project Description The North Fremont Bike and Pedestrian Access and Safety Improvements Project transformed North Fremont Street in the City of Monterey (City) into a true multi-modal corridor, providing safe access to bicyclists and pedestrians on a vital link between residential, commercial, educational, and community facilities. This project is the first major transportation project to occur along North Fremont Street in over fifty years. Construction of this $9.4 million project involved included the construction of the first Class IV-protected bicycle lanes adjacent to the median with bicycle signals and bike-protected intersections in California. This design is aimed at users of all ages and abilities. This project promotes a safe alternative to driving on a corridor that carries an
Live Oak Canyon Road and Trabuco Canyon Road Highway Safety Improvements
Location Live Oak Canyon Road, Trabuco Canyon Road (near El Toro Road) City or County Responsible for Project County of Orange Category Safety or Intelligent Transportation System Projects Author Regina Hu Organization County of Orange, Public Works Address 601 N. Ross St, Santa Ana, CA 92703 Phone 714-647-3927 Project Description Live Oak Canyon Road and Trabuco Canyon Road are two-lane rural, windy, canyon roadways within unincorporated County of Orange, known for its series of vertical and horizontal curves with limited recovery areas for errant vehicles. In fact, the sharp curvatures and tree canopy have been featured in commercials and cinema to showcase the handling of sports cars. But for typical drivers, within a 10-year span between January 2002 and January 2012, there were 245 collisions and several fatalities within the project limits. These collisions could be counter-measured with improvements compatible with a rural roadway, making this 3-mile project an ideal
Yount Street Rehabilitation Project-MT3020
Location Yount Street from Washington Street to Mount Street City or County Responsible for Project Town of Yountville Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Joe Tagliaboschi Organization Town of Yountville Address 6550 Yount Street Phone 707.944.8851 Project Description Yount Street was reconstructed using the Full Depth Reclamation technique. This process was arrived at after extensive testing and analysis and recommendation by our consultant Pavement Engineering Inc. The Town of Yountville uses Full Depth Reclamation (FDR) as the preferred method for street reconstruction as this is the fifth street in as many years to undergo this process. This is an innovative process that saves time, material, and money while reducing the carbon footprint when compared to traditional paving reconstruction processes. FDR is a beneficial process as the existing pavement is pulverized and cement ( and lime) are added to stabilize the sub base. The FDR
Bayside Drive, Jamboree Road/Marine Avenue
Location Bayside Drive (from PCH to Jamboree); Jamboree Avenue (from PCH to North Bay Front) City or County Responsible for Project City of Newport Beach Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Dave Webb Organization City of Newport Beach-Public Works Address 100 Civic Center Drive Phone 949-644-3330 Project Description Bayside Drive and Jamboree Road/Marine Avenue Improvements project was a multi-purpose endeavor designed to provide traffic calming measures, beautification, and sustainability along the high volume corridor. Bayside Drive is a heavily traveled thoroughfare that provides the main access to multiple neighborhoods, a retail center, and Balboa Island. A portion of Bayside Drive is located at the busy intersection/entrance to Balboa Island. For context, Balboa Island is home to many residents and also a popular tourist destination. Aside from the ferry, the Bayside Drive corridor serves as the only vehicular entrance to the island. Due to the
Foothill Crossing Project
Location Foothill Boulevard and Ferrini Road City or County Responsible for Project City of San Luis Obispo Category Safety or Intelligent Transportation System Projects Author Andrew Harris Organization City of San Luis Obispo Address 919 Palm Street, San Luis Obispo, CA 93401 Phone 805-783-7857 Project Description On December 18th, 2019 The City of San Luis Obispo, California, activated the very first Pedestrian Hybrid Beacon (PHB) or HAWK Beacon intersection in the County of San Luis Obispo at the intersection of Foothill Boulevard and Ferrini Road. A PHB is a traffic control device used to stop road traffic and allow pedestrians and bicyclists to cross safely. They are often used to improve crossings of major streets in locations where conditions do not warrant installation of a full traffic signal. For pedestrians and bicyclists, a PHB provides a similar crossing experience to a conventional traffic signal, with less disruption to vehicle traffic
Clinton Keith Road = Extension Project
Location Clinton Keith Road between I-215 and SR-79 City or County Responsible for Project County of Riverside Category Complete Streets Projects Author John Marcinek Organization County of Riverside Address 3525 14th Street, Riverside, CA 92501 Phone 951-955-3727 Project Description The County of Riverside in cooperation with the City of Murrieta, RCTC and WRCOG initiated the Clinton Keith Road extension project from I-215 to SR-79, to address the need for an east-west traffic corridor in the vicinity of north Murrieta, and unincorporated French Valley. The project relieves congestion and improves safety along Los Alamos Rd as well as Scott Rd and provides commuters with improved access to the I-215 freeway. The project extends Clinton Keith Rd by approximately 3.4 miles which includes sections of widening, upgrading dirt roads and constructing a new 6 lane urban arterial road through the Murrieta hills. Due to funding constraints, the project is being constructed in
Clinton Keith Road – Extension Project
Location Clinton Keith Road between I-215 and SR-79 City or County Responsible for Project County of Riverside Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author John Marcinek Organization County of Riverside Address 3525 14th Street, Riverside, CA 92501 Phone 951-955-3727 Project Description The County of Riverside in cooperation with the City of Murrieta, RCTC and WRCOG initiated the Clinton Keith Road extension project from I-215 to SR-79, to address the need for an east-west traffic corridor in the vicinity of north Murrieta, and unincorporated French Valley. The project relieves congestion and improves safety along Los Alamos Rd as well as Scott Rd and provides commuters with improved access to the I-215 freeway. The project extends Clinton Keith Rd by approximately 3.4 miles which includes sections of widening, upgrading dirt roads and constructing a new 6 lane urban arterial road through the Murrieta hills. Due to funding
Willow Street Bridge Replacement (STL261)
Location Willow Street at Bonita Road City or County Responsible for Project Chula Vista Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Maria Kachadoorian Organization City of Chula Vista-Office of the City Manager Address 276 Fourth Avenue, Chula Vista Ca 91910 Phone 619-691-5031 Project Description The bridge replacement provided capacity increasing traffic for vehicles, bicycles, and pedestrians. Additionally, the bridge continued use of an equestrian trail undercrossing and adjacent walking path during construction. The project provided a context sensitive solution too adjacent recreational golf coarse users and the surrounding business community. Incorporated context sensitive bridge aesthetics and developed stage construction plan to ensure continued transportation link, safety & constructability. These measures lead to a Categorical Exclusion (NEPA) and Mitigated Negative Declaration (CEQA) environmental documents. Additionally, the bridge replacement project was a catalyst to water transmission line improvements that were near the design life, had a high
The McClellan Road Bikeway Improvement
Location McClellan Road, between Imperial Avenue and Stelling Road City or County Responsible for Project CUPERTINO Category Safety or Intelligent Transportation System Projects Author David Stillman Organization City of Cupertino Address 10300 Torre Ave Phone 4087773249 Project Description The McClellan Road Bikeway Improvement Project is a multi-phase safety project that aims to install separated/Class IV bike lanes on McClellan Road between Torre Avenue and Imperial Avenue. The first phase of the project created a physical separation between motor vehicles and bicyclists along a portion of McClellan Road that serves four different schools (elementary, middle, high school and college). The work included installation of a raised physical barrier, traffic signal improvements, placement of delineators to increase visibility of the bicycle lanes, and enhanced striping.
A Walk Down Shady Lane
Location 21st Avenue & Sierra St. City or County Responsible for Project Kingsburg Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Alex Henderson Organization City of Kingsburg Address 1401 Draper St. Phone 559-897-6528 Project Description 21st. Avenue, also known as ‘Shady Lane,’ is an iconic street in Kingsburg, CA. The nickname stems from the now 100-year-old Camphor trees that line both sides of the street. Planted in the early 1900s, the trees have blossomed into a mature canopy that covers the entirety of 21st Ave and have helped define the street for several decades. Of course, with large trees often comes issues related to the conflicts of root systems and road/sidewalk infrastructure. For nearly 15 years, repaving the road was avoided as many believed the only long-term solution was to remove the now iconic symbol of 21st – the large trees. In fact, as adjacent roads
Cesar Chavez Boulevard Improvement Project
Location Cesar Chavez Boulevard, from State Route 98 to 2nd Street International Port of Entry City or County Responsible for Project City of Calexico Category Complete Streets Projects Author David Dale Organization City of Calexico Address 608 Heber Avenue, Calexico CA 92231 Phone 760-768-2110 Project Description The United States Federal Government relocated and constructed new Calexico West Land Port of Entry (POE) in order to facilitate cross border from Mexico inspection activities, to reduce wait times and improve downtown City vehicle circulation. Traffic through the crossing has increased to approximately 15-20 thousand vehicles per day, leading to overcrowding and potentially unsafe conditions, and therefore requiring the expansion of a new route to the POE. The City of Calexico received a grant from the Department of Transportation for construction of the Cesar Chavez Improvement Project, located between the new POE and State Route 98 in the amount of $7,104,240.00 (Federal $5,500,000.00
Expansion of Adaptive Traffic Signal System (TF389)
Location East H St from Hidden Vista Dr to Tierra del Rey, Telegraph Canyon Rd from Canyon Plaza Dwy to Auburn Av, Otay Lakes Rd from Bonita Vista Middle Dwy to Telegraph Canyon Rd City or County Responsible for Project City of Chula Vista, California Category Safety or Intelligent Transportation System Projects Author Eddie Flores Organization City of Chula Vista Address 276 Fourth Avenue Phone 6194765368 Project Description This project replaced an existing Adaptive Traffic Control System (ATCS) that included 12 intersections surrounding Southwestern Community College, Bonita Vista High School, and two retail centers. In addition, it expanded the ATCS to a total of 29 intersections, linking the community college, high school, and retail centers to Interstate 805 via the major arterial roadways of East H Street and Telegraph Canyon Road. The objectives of the project were twofold: to improve safety along the major arterial corridors by better synchronizing traffic
McHenry Avenue Corridor Improvements
Location McHenry Avenue and River Road City or County Responsible for Project San Joaquin County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Najee Zarif Organization San Joaquin County – Public Works Address 1810 E. Hazelton Avenue, Stockton, CA 95205 Phone 2094683053 Project Description San Joaquin County significantly alleviated commuter and motorists’ frustrations by literally and figuratively clearing the air along one of the busiest and most essential routes in the region. With the nearest river crossing four miles away, the McHenry Avenue Bridge over the Stanislaus River is a vital connection between San Joaquin County and Stanislaus County. Daily commuters, trucks and farm vehicles rely on the McHenry Avenue corridor to maintain local and regional mobility and support the Central Valley’s economic vitality. For years, the intersection of McHenry Avenue and River Road, at the north end of the bridge, experienced congestion during peak hours.
Dixon Mine Road Bridge over Wolf Creek
Location Alpine County, CA City or County Responsible for Project Alpine County, Community Development Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Brian Peters Organization Alpine County – Community Development Address 50 Diamond Valley Road, Markleeville, CA 96120 Phone (530) 694-2140 x425 Project Description Nestled in the Sierra Nevada Range and located just south of Lake Tahoe, Alpine County is a rural area with majestic views of both mountains and meadows. Between the winter skiing and summer hiking, the high altitude contributes to extreme weather conditions that must be considered for any design work and construction. The primary purpose of this federally funded bridge replacement project was to replace the original timber bridge and to provide a modern structure that meets current design criteria. Located on Dixon Mine Road, a one-lane road with nominal shoulders, approximately 8 miles southeast of the community of Markleeville, the original
Edinger Avenue Bridge Replacement
Location Edinger Avenue and Countess Street, over Bolsa Chica Channel City or County Responsible for Project County of Orange Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Regina Hu Organization County of Orange Address 601 N. Ross Street, Santa Ana, CA 92701 Phone 7146473927 Project Description The deteriorated, timber Edinger Avenue Bridge, built in 1968, is the only access for Sunset Aquatic Marina/Shipyard and OC Sheriff’s Marine Operations Bureau, over Bolsa Chica Channel connecting the cities of Seal Beach and Huntington Beach. Due to an underwater pest infestation by “marine borer” crustacean, 50 out of the 140 wooden piles were eaten away, forcing an emergency bridge closure by Caltrans. Temporary repair measures were implemented in 2015 to keep the bridge open with load restrictions. In 2019 after years of programming, engineering design, and construction, the bridge was finally replaced with a 340-ft precast concrete, 4-span bridge
Mission Street Pavement Maintenance Project “Mission Possible”
Location Mission Street from US 101 to State Street, and Los Olivos Street from Laguna Street, over the Mission Canyon Bridge to the City limits City or County Responsible for Project Santa Barbara Author Ashleigh A. Shue Organization City Of Santa Barbara, Public Works, Engineering Division Address 630 Garden Street Santa Barbara CA 93101 Phone (805) 564-5424 Project Description In the summer of 2019, the City of Santa Barbara undertook an extensive rehabilitation of one of the City’s busiest arterial streets, Mission Street between Highway 101 and State Street. The rehabilitation included replacing failing traffic signal conduits, improving pedestrian accessibility by upgrading access ramps and repairing sidewalks, repairing curbs and gutters, repaving the roadway, and planting new street trees. In preparation for disrupting one of Santa Barbara’s heaviest travelled corridors, the City launched the “Mission Possible” campaign, inspired by the movie, “Mission Impossible,” in an effort to raise community awareness
Fremont Street Bridge/Low Water Crossing Replacement Project
Location Fremont Street at Wilson Creek City or County Responsible for Project City of Yucaipa Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Fermin Preciado Organization City of Yucaipa Address 34272 Yucaipa Blvd Phone 9097972489 Project Description In partnership with other agencies the City of Yucaipa replaced the low water crossing along Fremont Street, just north of Oak Glen Road, by constructing a reinforced concrete box culvert bridge to provide an all-weather road crossing over Wilson Creek. Prior to the construction being completed, Fremont Street would be closed to vehicular and pedestrian traffic due to floodwaters making the street impassable. Floodwaters also put underground utilities at risk. The project construction elevated the roadway 10 feet above the box culvert. An underground utility corridor was created within the 10 feet. The upstream side of Wilson Creek was graded in a manner that promotes enhanced groundwater recharge. This
Sacramento’s Downtown Parking Protected Bikeways
Location Sacramento City or County Responsible for Project City of sacramento Author Jennifer Donlon Wyant Organization City of Sacramento Department of Public Works Address 915 I Street Phone 9168085913 Project Description Sacramento’s Central City or “The Grid” is not only the City’s downtown but also includes the state capital; county seat; entertainment and retail; and home to residents in vibrant and eclectic neighborhoods. The current daytime population is over 100,000. The City’s General Plan and regional planning allocation focus substantive growth in housing and commercial densities on The Grid. Historically, the approach to transportation planning centered on streets that efficiently moved vehicles, giving priority to vehicular traffic. The downtown network could not accommodate the anticipated growth if everyone traveled in their own personal vehicles. The City of Sacramento recognizes to accommodate growth, support business, and provide mobility choices is with a multi‐modal transportation system that provides an enjoyable environment whether
Orange County Pavement Management Program
Location Various locations throughout unincorporated Orange County City or County Responsible for Project Orange County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Edward Frondoso Organization OC Public Works Address 1152 E Fruit St, Santa Ana, CA 92701 Phone 714-245-4596 Project Description Orange County maintains approximately 318 miles of paved roadway. We currently maintain a relatively high network average Pavement Condition Index (PCI) of 81. Overall, nearly 70% of our road network is rated “Very Good” or “Good” condition. This is a tremendous improvement from just 8 years ago, when our network average PCI was only 62. Our pavement management program divides our roadway network into 7 geographic areas. We treat one geographic area each year on a rotating basis. We typically budget and construct roughly $13 million annually on pavement maintenance using Measure M2 and SB1 funding sources. Orange County has taken measures to increase
Western Placerville Interchanges Project, Phase 2
Location US-50 and Ray Lawyer Drive, Placerville, CA City or County Responsible for Project City of Placerville Category Complete Streets Projects Author Rebecca Neves Organization City of Placerville Address 3101 Center Street, Placerville, CA 95667 Phone 530-642-5250 Project Description The Western Placerville Interchanges Project (WPIP), Phase 2 is the third of a four-phase sequence of projects to construct improvements at two interchanges west of central Placerville, along US-50. The purpose of the WPIP is to improve traffic operations and to accommodate projected 20-year increases in traffic volumes at the Forni Road/Placerville Drive/US-50 Interchange and to provide new on- and off-ramps to US-50 at the Ray Lawyer Drive Overcrossing. The project provided improvements where needed between the Forni Road/Placerville Drive/US-50 Interchange and the Ray Lawyer Drive Overcrossing, to better serve the needs of local and regional traffic, including transit, bicycle and pedestrian traffic. The project was needed to respond to current
Woodward Island Road Bridge
Location Bacon Island Road and Middle River City or County Responsible for Project San Joaquin County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Najee Zarif Organization San Joaquin County – Public Works Address 1810 E. Hazelton Avenue, Stockton, CA 95205 Phone 2094683053 Project Description Although it stood as an historic treasure for 80 years, San Joaquin County recognized the need to replace the antiquated Woodward Island Ferry system. The Ferry provided access to 1,850 acres of rich farmland in the San Joaquin Delta and the local farming community relied on it to transport $2 million annually in agricultural exports across Middle River to Upper Jones Tract. However, as operational costs to run the ferry increased to upwards of $90,000 annually, the reliability and practicality of the cable-driven barge diminished. San Joaquin County Department of Public Works (SJCPW) joined with the Island’s Reclamation District 2072 and
San Joaquin County Pavement Maintenance Program
Location Countywide City or County Responsible for Project San Joaquin County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Najee Zarif Organization San Joaquin County – Public Works Address 1810 E. Hazelton Avenue, Stockton, CA 95205 Phone 209 468-3053 Project Description San Joaquin County implemented a comprehensive Pavement Maintenance Program (Program) which extends the life of 1,650 miles of public roadways using a variety of cost effective and innovative treatments that improve the overall quality and condition of its road system. The need for a strategic and proactive investment in the County’s roadway system was clear after the San Joaquin County Department of Public Works (SJCPW) noticed a declining trend in the overall Pavement Condition Index (PCI). Members from SJCPW Engineering and Road Maintenance teams collaborated over several months to develop the Program to assess the conditions of roads and identify road segments that were ideal
County of San Diego Building Better Roads Program
Location San Diego County Region City or County Responsible for Project County of San Diego Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Mark Perrett Organization County of San Diego Department of Public Works Address 5500 Overland Avenue, Suite 320, San Diego, CA 92123 Phone (858) 694-2693 Project Description The County of San Diego’s Building Better Roads program was established as a collaborative effort between local stakeholders including cities, agencies, private industries, and industry associations to identify innovative, cost-effective, and sustainable pavement preservation treatments that can be easily and efficiently implemented throughout the state. The Building Better Roads Working Group has become the centerpiece of this program by including a diverse set of representatives from the County, Caltrans, San Diego Association of Governments (SANDAG), local cities, and private industries and associations. The goals of the Working Group are to bring together the extensive knowledge, experience, and
Bellflower Blvd. Widening Project
Location Bellflower Blvd at 91 Fwy City or County Responsible for Project City of Bellflower Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Len Gorecki Organization City of Bellflower Phone 562-804-1424 ext. 2217 Project Description Ranked the top most congested arterial intersection in the Gateway Cities region of Los Angeles County, Bellflower Blvd. at the 91 Fwy had long been a congestion nightmare for commuters in the southeast LA County area. The City of Bellflower designed the widening project to incorporate an additional lane of traffic in both the north/southbound direction as well as lengthening the northbound left turn lane onto the 91 Fwy westbound on-ramp increasing the vehicle capacity in the turn lane from 3 vehicles to 14 vehicles. In order to have the needed space to widening the street, the City had to acquire private property, particularly on the west side of Bellflower Blvd.
Harco Street, et al.
Location Woodruff Avenue to Conquista Avenue City or County Responsible for Project Los Angeles County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Greg Kelley Organization Los Angeles County Public Works Address 900 South Fremont Avenue, Alhambra, CA 91803 Phone 6264584911 Project Description Los Angeles County Public Works has utilized sustainable pavement treatments with remarkable success since 2008. We continue our commitment to preserving and improving the quality of our roads in a cost effective and environmentally responsible way. The state mandate (AB32) to reduce greenhouse gas (GHG) emissions and limited budgets were key motivators for developing our sustainable approach that emphasized (1) focusing on preserving roads in good condition first; (2) using recycled materials in pavement treatments; and (3) reutilizing materials in-place when reconstructing our roads. The Harco project, completed in November 2019, showcases the benefits when properly applying this approach. The project covers 7
City of San Jose 2019 Pavement Maintenance Program
Location San Jose, CA City or County Responsible for Project San Jose Department of Transportation Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Rick Scott Organization City of San Jose Department of Transportation Address 1404 Mabury Rd, San Jose, CA, 95133 Phone (408) 794-1925 Project Description The City of San José’s Department of Transportation (DOT) manages a street network that consists of 2,434 (30-ft equivalent) miles. Of that total, 944 miles are considered major streets that carry most of the City’s traffic and 1,490 miles are local and neighborhood streets where most of our residents live. Due to budget constraints, local and neighborhood streets have not been maintained since 2011. Funding for street maintenance in San José dramatically changed in 2016 with the passage of SB1 and VTA Measure B, although the City was unable to access Measure B funds for two years due to a
Avenue E
Location 35th Street East to 130th Street East City or County Responsible for Project Los Angeles County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Greg Kelley Organization Los Angeles County Public Works Address 900 South Fremont Avenue, Alhambra, CA 91803 Phone 626-458-4911 Project Description Los Angeles County Public Works (PW) has utilized sustainable pavement treatments with remarkable success since 2008. We continue our commitment to preserving and improving the quality of our roads in a cost effective and environmentally responsible way. The state mandate (AB32) to reduce greenhouse gas (GHG) emissions and limited budgets were key motivators for developing our sustainable approach that emphasized (1) focusing on preserving roads in good condition first; (2) using recycled materials in pavement treatments; and (3) reutilizing materials in-place when reconstructing our roads. The Avenue E project, completed in October 2019, showcases the benefits when properly applying this approach.
Sir Francis Drake Boulevard High Friction Surface Treatment
Location Sir Francis Drake Boulevard near Whites Hill, just west of the Town of Fairfax City or County Responsible for Project County of Marin Author Julian Kaelon Organization Marin County Department of Public Works Address 3501 Civic Center Drive, San Rafael, CA 94903 Phone 4154734070 Project Description During the Summer of 2019, the Marin County Department of Public Works (DPW) completed a High Friction Surface Treatment (HFST) project on a one-mile long, hillside stretch of Sir Francis Drake Boulevard. The road is a major arterial in Marin with over 10,000 cars driving it per day. DPW identified the project following a 2014 safety assessment based upon a review of California Highway Patrol collision reports and related coordination with CHP, the County of Marin Sheriff Department and County Fire Department. The safety assessment in 2014 helped guide the project design. Research showed that between 2008 and 2013, a total of 52
Camino Del Mar Downtown Streetscape
Location Camino Del Mar between 9th Street and Plaza City or County Responsible for Project San Deigo Author Mohsen Maali Organization City of Del Mar Address 2240 Jimmy Durante Boulevard Phone 858-704-3680 Project Description The Camino Del Mar Downtown Streetscape project included improvement to roadway, sidewalks, parking areas, bike lanes, medians, landscape areas, site furnishings, and adds high efficiency LED street lights. The Project’s objectives are to improve safety and access, beautify the Camino del Mar corridor in the downtown area to encourage additional revitalization of the downtown and economic growth, while promoting sustainability. As a part of the existing San Diego Regional Bike Network, the project promotes safer bicycle access with the creation of dedicated bicycle lanes and bike parking. Before the project, the corridor had gaps in bike lanes that made for unsafe conditions when bike lanes terminate and merge with a vehicular travel lane. The project promotes
Box Canyon Road Pavement Resurfacing
Location Box Canyon Road – Ventura County City or County Responsible for Project Ventura County Public Works Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Matt Maechler Organization Ventura County Public Works, Transportation, Design and Construction Address 800 S. Victoria Ave. Phone (805) 477-1911 Project Description The Box Canyon Road Resurfacing Project was a challenging and successful project for Ventura County Public Works Agency, Transportation Department. It incorporated new sustainable and efficient paving technologies, advanced traffic safety measures, and extensive public outreach. Box Canyon Road is a two-mile-long high-volume commuter road through a rugged mountain pass in eastern Ventura County, that connects the community of Simi Valley in Ventura County to Chatsworth in Los Angeles County. The road is narrow and winding and home to an isolated community. A major challenge of the project was the high volume of commuter traffic that travels at high speed
Roundabout Improvements at La Paz Road and Ynez Road
Location Intersection of La Paz Road and Ynez Road City or County Responsible for Project Temecula Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Patrick Thomas Organization City of Temecula Address 41000 Main Street, Temecula CA 92590 Phone 951-506-5163 Project Description This project included construction of a roundabout on Ynez Road at the intersection of La Paz Road. Improvements included construction of a raised traffic circle with desert style hardscape inside the circle; along with public art component, a bronze horse statue in recognition of equestrian theme residential neighborhood. This project maintains the natural beauty of the community and improves traffic safety at the intersection. The roundabout was a partnership between the City of Temecula, nearby commercial development project (Temecula Gateway) and Los Ranchitos Homeowner’s Association. The developer provided financial contribution in-lieu of requirement for installation of traffic signal at subject intersection. The Homeowner’s Association provided
Sierra Highway Pedestrian Bridge & Street Improvements Project
Location Sierra Highway and Golden Valley Road City or County Responsible for Project City of Santa Clarita Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Damon Letz Organization City of Santa Clarita – Public Works Address 23920 Valencia Boulevard Suite 304, Santa Clarita, CA 91355 Phone 661-255-4982 Project Description The City of Santa Clarita is committed to building vital infrastructures that enrich a growing and diverse community. To date, the City has constructed approximately 80 miles of picturesque trails and over 20 miles of paseos designed for community and recreational use, including walking, riding, and jogging. To support this vision, in partnership with the California Department of Transportation (Caltrans), the federally-funded Sierra Highway Pedestrian Bridge and Street Improvement Project was designed to install a pre-fabricated steel truss pedestrian bridge and constructed street improvements along Sierra Highway. The City of Santa Clarita hosted a public ribbon cutting