Local Project Listing (2021)
Anacapa Safe Routes to School
Location Telegraph Road between Mills Road and Ashwood Street City or County Responsible for Project Ventura City Category Complete Streets Projects Author Jeff Hereford Organization City of Ventura Public Works Address 501 Poli Street, Room 120, Ventura CA 93001 Phone 805-654-7744 Project Description Nestled along a busy corridor in the coastal town of Ventura, California lies a middle school named after Anacapa Island of nearby Channel Islands National Park. Anacapa Middle School serves grades six through eight for families living in the midtown area and with Ventura Community College located just a mile away on Telegraph Road, these improvements provided a critical to the nearby Ventura Transit Center. Prior to 2020, Telegraph Road between Ashwood Avenue and Mills Road was an incomplete maze of sidewalks, curb, and gutter, as well as patches of incomplete bike lanes. Furthermore, Ventura Unified School District began to express concern over the lack of walkable
Kirker Pass Road Northbound Truck Climbing Lane
Location Kirker Pass Road City or County Responsible for Project Contra Costa County Category Safety or Intelligent Transportation System Projects Author Jenna Caldwell Organization Contra Costa County Public Works Department Address 255 Glacier Drive, Martinez 94553 Phone (925) 500-3048 Project Description Kirker Pass Road is an interregional route between Central and East Contra Costa County that serves as an essential route for approximately 20,000 vehicles a day, including 1,200 trucks. Due to the mountainous terrain with sustained grades greater than 10%, in conjunction with the high passenger vehicle and truck traffic, significant traffic congestion occurred during peak hours. The Kirker Pass Road Northbound Truck Climbing Lane project dramatically increases safety and reduces congestion along Kirker Pass Road by constructing a truck climbing lane in the northbound direction. To better serve the users of this road, this truck lane provides a dedicated lane for the slower, heavier truck traffic to climb
Building Better Road Program
Location San Diego County Region City or County Responsible for Project County of San Diego Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Keith Kezer Organization County of S5500 Overland Ave., Suite 320, San Diego, Ca 92123an Diego Address 5500 Overland Ave., Suite 320, San Diego, Ca 92123 Phone 858-694-3013 Project Description The County of San Diego’s Building Better Roads program was established as a collaborative effort between local stakeholders including cities, agencies, private industries, and industry associations to identify innovative, cost-effective, and sustainable pavement preservation treatments that can be easily and efficiently implemented throughout the state. The Building Better Roads Working Group has become the centerpiece of this program by including a diverse set of representatives from the County, Caltrans, San Diego Association of Governments, local cities, and private industries and associations. The goals of the Working Group are to bring together the extensive knowledge,
Loomis Town Center Implementation Plan Phase 3
Location Taylor Road City or County Responsible for Project Town of Loomis Category Complete Streets Projects Author Sean Rabe Organization Town of Loomis Address 3665 Taylor Road, Loomis, CA 95650 Phone (916) 652-1840 Project Description The Town of Loomis initiated this project to support a walkable, pedestrian-friendly downtown, improve pedestrian accessibility and roadway quality. The project also supports positive impacts to the local economy and the community while preserving historic Route 40. Improvements included roadway, streetscape, landscaping, and drainage. Construction sites were evaluated to determine potentially significant environmental impacts; prepared CEQA/NEPA documents and obtained permits for the project; as well as prepared all Caltrans Local Assistance Procedures Manual to obtain the E-76. Collaboration included coordination with Caltrans local assistance and Placer County Transportation Agency for funding. Funding sources came from the Regional Surface Transportation Program, a federal Congestion Mitigation and Air Quality grant and state money from SB1 Road Maintenance
The Antioch Cape Seal 2020 Project (P.W. 392-31)
Location 120 residential streets in Antioch, CA City or County Responsible for Project City of Antioch Author Junming Li Organization Public Works, City of Antioch Address 200 H St, Antioch, CA 9459 Phone 925-779-7025 Project Description Over the last few years, the City of Antioch has been leveraging Measure J Funds and a CalRecycle Grant to provide cost-effective pavement preservation treatments to extend deteriorating roads’ life expectancy. In response to The Globe Warming Solutions Act (AB32) and due to limited budget, the City has developed a sustainable approach to (1) focuses on preserving roads in fair condition; (2) using recycled materials in pavement treatments; and (3) push the project out to bid at slow construction seasons for competitive bids. Our Pavement Preservation Project completed in August 2020, showcases the benefits when properly applying this cost-effective and sustainable approach. Pavement condition of over 120 residential streets (totaling approximately 470,000 square yards
Rio Linda Boulevard Bridge Replacement and Main Avenue Realignment Project
Location Rio Linda Boulevard and Main Avenue Intersection City or County Responsible for Project City of Sacramento Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Philip Vulliet, PE Organization City of Sacramento Address 915 I Street, Room 2000, Sacramento, CA 95814 Phone (916) 808-5092 Project Description The existing Rio Linda Boulevard Bridge over Magpie Creek, constructed in 1937, was a four-span reinforced concrete slab bridge carrying two travel lanes. The bridge was structurally deficient and functionally obsolete due to a lack of shoulders/bike lanes, sub-standard railing, and poor approach geometrics. Immediately north of the bridge was the all-way stop controlled Rio Linda Boulevard/Main Avenue intersection. This intersection had a large skew to avoid Magpie Creek. This skew restricted vehicle stopping sight distance and had poor visibility at night. The City of Sacramento (City) secured federal Highway Bridge Program (HBP) funds to replace the bridge on Rio
Bouquet Canyon Road
Location Unincorporated Angeles National Forest (between Elizabeth Lake Road and Spunky Canyon Road) City or County Responsible for Project Los Angeles County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Hassan Alameddine Organization Los Angeles County Public Works Address 900 South Freemont Avenue, Alhambra, CA 91803 Phone 626-458-4911 Project Description Los Angeles County Public Works (Public Works) rehabilitated approximately 6.5 miles of Bouquet Canyon Road (Project) in 2020. Bouquet Canyon Road is a north-south two-lane major highway that connects the Santa Clarita Valley with communities in the Leona Valley and the Antelope Valley. In addition, it serves as an alternate route for commuters traveling along the SR-14 freeway and provides access to the Bouquet Reservoir and the Pacific Crest Trail. It is located within an unincorporated area of the Angeles National Forest and partially within the jurisdiction of the City of Palmdale, which also participated in
Second Street Streetscape Improvements Project
Location Second Street between Market Street and King Street City or County Responsible for Project San Francisco Category Complete Streets Projects Author Trent Tieger Organization San Francisco Public Works Address 49 South Van Ness Ave, 7th Floor, San Francisco, CA 94103 Phone 415-319-4637 Project Description Second Street rests in the heart of downtown San Francisco, connecting Oracle Park, home of the San Francisco Giants, to the bustling historic Market Street and Financial District. Once a hilly stretch of land, the city excavated and graded the street in the 1860s to ease the strain on horse transportation and create a more connected community. In 2012, the City began a comprehensive public engagement process with a community-driven approach to planning and began meeting with residents, merchants, and community groups to develop a plan for a safer Second Street. With a focus on pedestrian and traffic safety, improvements were identified and implemented along
Interstate 880 Northbound Safety and Operational Improvements at 23rd and 29th Avenues
Location I-880 at 23rd and 29th Avenues City or County Responsible for Project Alameda CTC Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Trinity Nguyen Organization Alameda CTC Address 1111 Broadway, Suite 800, Oakland CA 94607 Phone 510-208-7441 Project Description I-880 is a major corridor in California’s Bay Area region, connecting the Port of Oakland with Silicon Valley. High traffic volumes, nonstandard geometry, nonstandard interchange spacing and short weaving all contributed to the deficient flow of traffic and high accident rates in the vicinity of the 23rd Avenue and 29th Avenue interchanges. Major project stakeholders included the California Department of Transportation, Alameda County Transportation Commission and the City of Oakland. To improve safety and operations at the interchanges, a five-stage plan was executed that included: • Phase 1 o Safety improvements to the northbound on-ramp o Safety improvements to the freeway mainline o Soundwall installation in
Orange Grove Resurfacing Project – STPL-5064 (088)
Location Orange Grove Blvd – Lincoln Ave to Sierra Madre Villa City or County Responsible for Project City of Pasadena Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Frank Lujan Organization City of Pasadena Public Works Address 100 N Garfield Ave Pasadena CA 91101 Phone 6267443703 Project Description As an environmental steward, the City of Pasadena is aware of the need to Design and Construct Public Works projects with an environmentally responsible approach. Although, it is a challenge for Public Agencies to keep up with the demand for preservation to our roads, the City of Pasadena is constantly looking to implement more efficient ways to stretch the dollars. The City is looking to perform the right treatment at the right time, incorporate preventative maintenance treatments to preserve good pavement conditions, as well as implementing the use of creative pavement preservation applications, including the use of recycled
Ralston Avenue Corridor Improvement Project Segments 1 and 2
Location Ralston Avenue City or County Responsible for Project Belmont Category Complete Streets Projects Author Peter Brown Organization City of Belmont Address 1 Twin Pines Ln Phone 6505957459 Project Description The Ralston Avenue Corridor Improvement Project Segments 1 and 2 created more complete streets by improving bicycle and pedestrian facilities throughout the corridor while also rehabilitating pavement. These two segments focused on Ralston Avenue between Hiller Street and South Road, which passes through Belmont’s priority development area. Improvements were also done on connecting streets to make the downtown area more walkable and bikeable. Ralston Avenue is an arterial that connects to I-280 and US101 on either side of the City making it a major corridor. It carries a large volume of people through the City and has a number of high use activity centers. The improved streets create better access to schools, shops, Caltrain, SamTrans, and multiple parks. Coordination with
Seaside Pavement Rehabilitation Project
Location N/A, pavement rehabilitation took place on many streets throughout Seaside City or County Responsible for Project City of Seaside Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Scott Ottmar Organization City of Seaside Address 440 Harcourt Avenue, Seaside, CA 93955 Phone 831.899.6884 Project Description The Seaside Pavement Rehabilitation Project was a $9 million project that included pavement rehabilitation of approximately 49,500 linear feet of streets and roads throughout the City of Seaside. The design was performed in two phases and included improved drainage and ADA facilities for several areas. The initial phase included less complex improvements to the roadways (e.g., slurry seals) to prepare the community for construction and show quick and efficient progress. The second phase was more difficult because it involved older streets and incorporating necessary ADA ramps and improving existing drainage issues, resulting in the installation of bulb-outs. Constructing curb ramps at
Folsom Boulevard Streetscape Enhancements, Phases I to V
Location Folsom Boulevard from Bradshaw Road to Sunrise Boulevard City or County Responsible for Project City of Rancho Cordova Category Complete Streets Projects Author Albert Stricker Organization City of Rancho Cordova Address 2729 Prospect Park Drive, Rancho Cordova, CA 95670 Phone (916) 851-8713 Project Description Folsom Boulevard is a corridor with special historical significance to the City of Rancho Cordova (City) and the Sacramento region. Folsom Boulevard was part of the Lincoln Highway and the original route of US 50, and the main thoroughfare into and out of Sacramento, until the new freeway bypass was built in the 1970’s. Paralleling Folsom Boulevard to the south was the Sacramento Valley Railroad which later became the Sacramento Regional Transit District (SacRT) Gold Line light rail corridor. After the construction of the highway bypass, Folsom Boulevard evolved into the communities’ commercial and transit-oriented development corridor. Recognizing the importance of Folsom Boulevard’s legacy, the
Foothill Boulevard Master Plan Improvements Project
Location Foothill Boulevard from Towne Avenue to LA/SB County Boundary City or County Responsible for Project City of Claremont Category Complete Streets Projects Author Maria B. Tipping Organization City of Claremont Address 207 Harvard Avenue Phone 9093995474 Project Description The Foothill Boulevard Master Plan Improvements project is located within the City of Claremont, in Los Angeles County. This is a complete streets project that was designed to improve the corridor by making it a pedestrian, bicycle, and storm water friendly facility in addition to addressing motorists’ safety and needs. This project is just over 2 miles in length, and is a major east-west corridor (Old Route 66) connecting its neighbor to the west (City of Pomona) to the Los Angeles/San Bernardino County boundary, at the City of Upland/City of Claremont limit to the east. This complete streets project is the largest Capital Improvement project of its kind to take place
Federal Downtown Controller and Communication Upgrade Project
Location Downtown Sacramento City or County Responsible for Project City of Sacramento Category Safety or Intelligent Transportation System Projects Author John Matoba Organization City of Sacramento Address 915 I Street, Room 2000, Sacramento, CA 95814 Phone (916)808-7891 Project Description The Downtown Sacramento Grid, or Central City, is home to City Hall, the Central Business District, the new Golden 1 Arena, the County Seat, and the State Capitol. In addition to the visitors drawn to the State Capitol and surrounding attractions, approximately 5,000 employers and a population of more than 90,000 daytime employees generate tremendous amounts of daily traffic within the Central City. Close to 250 traffic signals and the controllers that operate them lie within the Central City to serve the variety of personal and mass transit options available. The signal cabinets and controllers were originally installed in the 1980’s and 1990’s and had been failing with increasing frequency in
Fremont Street Low Water Crossing Replacement Project
Location Fremont Street and Wilson Creek City or County Responsible for Project City of Yucaipa Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Todd Gutjahr Organization City of Yucaipa Address 34272 Yucaipa Blvd. Phone 909-797-2489×289 Project Description In November of 2019 the City completed the Fremont Street Low Water Crossing Replacement Project. The Project is the 8th bridge project completed by the City with a total value of over $18 million. This Project replaced the low water at grade crossing on Fremont Street and Wilson Creek with a new bridge. The old roadway at the bottom of the dip was not wide enough for 2 vehicles traveling in the opposite direction to pass at the same time. Prior to the construction of the bridge, Fremont Street would have to be closed to vehicular and pedestrian traffic when it rained. There is now is an all-weather road
Overlay and Slurry Project
The City of Santa Clarita (City) is the third largest city in Los Angeles County, and as such we strive to maximize our resources when managing our growing pavement infrastructure. The City employs a 5-year pavement management plan to strategize and treat our pavement infrastructure.
Franklin Boulevard Class IV Protected Bikeway Project
Location Franklin Blvd (Big Horn Drive to Cosumnes River Blvd) City or County Responsible for Project City of Sacramento Author Philip Vulliet Organization City of Sacramento Address 915 I Street Suite 2000, Sacramento CA 95814 Phone 916-808-5092 Project Description The City of Sacramento and the City of Elk Grove teamed up on the Franklin Boulevard Class IV Protected Bikeway Project to implement bicycle and pedestrian safety improvements along the Franklin Boulevard Corridor while also performing much needed pavement maintenance. Franklin Boulevard functions as a commuter route and is the only continuous roadway connecting the City of Elk Grove to Sacramento’s urban core between Interstate 5 and Highway 99, an overall distance of 11.5 miles. Franklin Boulevard has 4 lanes of vehicular traffic, and carries 25,000 cars per day at speeds of around 45 mph. Although there were existing Class II bike lanes along Franklin Boulevard, the high vehicular speeds and
Third Street Bridge Rehabilitation Project
Location Third Street over Mission Creek, between Channel Street and Berry Street City or County Responsible for Project San Francisco Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Jacky Ng Organization San Francisco Public Works Address 49 South Van Ness Avenue, Suite 700, San Francisco, CA 94103 Phone 628-271-2229 Project Description The Third Street Bridge, also known as the Francis “Lefty” O’Doul Bridge, crosses over Mission Creek Channel and links the South of Market and Mission Bay neighborhoods in San Francisco’s Eastern Neighborhoods Planning Area. At approximately 295-foot-long and 80-foot-wide, Third Street Bridge spans the Mission Creek Channel and provides five lanes of traffic and pedestrian walkways on each side. As a busy arterial for vehicles, pedestrians, and cyclists, the draw span lifts to allow boats to navigate through Mission Channel to access the upstream harbor. Prior to the Third Street Bridge Rehabilitation Project, the bridge’s
Outside Canal Bridge Replacement on Russell Avenue
Location Russell Avenue 3.90 miles north of W Nees Avenue City or County Responsible for Project Fresno County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Author Mohammad Alimi, Ph.D., P.E. Organization County of Fresno Public Works & Planning, Address 2220 Tulare Street, 6th Floor Phone (559) 600-4505 Project Description The Outside Canal Bridge on Russell Avenue is located in northwestern Fresno County, approximately 11 miles northwest of the town of Firebaugh. The surrounding area is largely rural and agricultural, and Russell Avenue is a major connector to I-5 in the region. The western San Joaquin Valley has experienced extensive subsidence due to depletion of the underground aquifer over decades of groundwater pumping and periods of severe drought. While the original bridge was built several meters above the water’s surface, subsidence caused the bridge to sink up to 11 feet from its original design elevation. As a
Fulton Road Reconstruction – Occidental Road to W. 3rd Street
Location Fulton Road between Occidental Road and W. 3rd Street City or County Responsible for Project City of Santa Rosa Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Greg Dwyer Organization City of Santa Rosa Address 69 Stony Circle, Santa Rosa, CA 95405 Phone 707-543-3838 Project Description The City of Santa Rosa’s “Fulton Road Reconstruction” project between Occidental Road and W. 3rd Street repaired approximately 3,200 lineal feet of 4-lane principal arterial pavement and associated bike lanes. This North-South arterial is separated by a landscaped median and sees a remarkable 25,000 vehicles per direction per day. Innovation and adaptability were key to the success of this project in both short and long-term aspects. The City strives to be a pioneer in the region testing and implementing new solutions, construction systems, materials, and bidding practices. Fulton Road exemplified this using Alternative Design/Alternative Bid (AD/AB) bidding which allowed
2019 WESTERN REGION PAVING PROJECT: DILLON BEACH ROAD
Location Dillon Beach Road City or County Responsible for Project Merin County Author Rachel Calvert Organization Merin County Address 607 Davidson St Phone 4152465017 Project Description Marin County Public Works has been using sustainable pavement preservation and reconstruction methods with noteworthy success since 2010. The central focus of the pavement management plan continues to prioritize pavement preservation with a worst-second approach. Roads that have deteriorated too far to be mended with preservation, are reviewed for ways to improve the quality of roads in a cost effective and environmentally responsible way. This review includes careful considerations for using recycled materials in pavement treatments; and reutilizing materials in-place when reconstructing roads. The Dillon Beach Road Project (Project), completed in December 2020, showcases the benefits when properly applying this sustainable approach. The project limits started in the East in the small quaint town of Tomales and heading West to beautiful Dillon Beach. the
Upper Haight Transit Improvement and Pedestrian Realm Project
Location Haight Street between Central Avenue and Stanyan Street (including the Haight/Ashubry intersection) in San Francisco CA City or County Responsible for Project San Francisco Category Complete Streets Projects Author Paul Baradas Organization San Francisco Public Works Address 49 South Van Ness Avenue Phone (628) 271-2580 Project Description Vision This Public Realm Plan lays out a vision for Haight Street and provides a design framework for the corridor, for key intersections, and for specific streetscape elements. The Haight Ashbury Merchants Association’s (HAMA) developed a list of improvements for the Haight Ashbury neighborhood in 2011. This interest served as the basis for the public engagement process for this Public Realm Plan. A vision for the neighborhood grew out of community input received during the first workshop in October 2012. Participants were asked what they love about the neighborhood, what concerns them, and ideas for improvements. Many participants expressed a desire to
Gloria/Iverson/Johnson Canyon Road Pavement Reconstruction Project
Location Gloria Road, Iverson Road and Johnson Canyon Road in the City of Gonzales and County of Monterey City or County Responsible for Project County of Monterey and City of Gonzales Joint Project Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Patrick Dobbins Organization City of Gonzales Address PO Box 647 Phone 831-675-5000 Project Description This nomination is for the recently completed $7.0M Gloria/Iverson/Johnson Canyon Road Pavement Reconstruction Project. The project was a unique collaboration between County of Monterey, City of Gonzales, and the Salinas Valley Solid Waste Authority. These roadways are the truck route for Waste Authority trucks between their Johnson Canyon Landfill and US101. Prior to the project, the pavement was full of potholes and failed pavement as these roads were not designed for the number of large trucks. Congressman Jimmy Panetta called County Supervisor Chris Lopez after visiting the Swiss Rifle Club on
Shell Beach Streetscape Project
Location Shell Beach Road from Cliff Avenue to Terrace Avenue City or County Responsible for Project City of Pismo Beach Author Erin Olsen Organization City of Pismo Beach, Engineering Division Address 760 Mattie Road Phone 805-773-4656 Project Description The Shell Beach Streetscape is an 18 block long Complete Streets project improving safety and livability in the community for users of all ages and abilities by reconstructing the roadway, increasing lighting and landscaping, adding an 8-foot-wide multi-use path to accommodate bicycles and pedestrians, and painting sharrows in the traffic lanes. The improvements included sidewalk upgrades, ADA accessibility upgrades, improvements to the drainage and resurfacing of the roadway. In addition, the improvements included new crosswalks with paver inlays for increased visibility, enhanced landscaping with new trees and a new parking lot. Decorative features such as new LED streetlights, new benches, trash cans and public art have been installed throughout the corridor. This
York Street Regional Bus Facility Expansion
Location 311 Sacramento St, Vallejo, CA 94590; Cross Street: York Street City or County Responsible for Project Solano Transportation Authority/City of Vallejo/Solano County Transit Category Safety or Intelligent Transportation System Projects Author Vincent Ma Organization Solano Transportation Authority Address One Harbor Center Phone 7073993212 Project Description The York Street Regional Bus Facility is an extension of the Vallejo Transit Center (VTC) funded through the Transit and Intercity Rail Program (TIRCP) 2018. It is a multi-modal facility adjacent to the San Francisco Bay Ferry Terminal in Vallejo and will accommodate increased local and regional bus service. In partnership with Solano County Transit (SolTrans), the City of Vallejo, and the Solano Transportation Authority, construction on the facility broke ground on February 24, 2020 and was completed and celebrated with a Virtual Ribbon Cutting Ceremony on December 15, 2020. The York Street facility will serve as a secondary hub for local SolTrans routes
City of Ridgecrest Slurry Program
Location Several Locations City or County Responsible for Project Ridgecrest Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Ronald Strand Organization City of Ridgecrest Address 100 W. California Ave., Ridgecrest, CA 93555 Phone 760-499-5001 Project Description As many cities experience less and less revenue for infrastructure projects, the City of Ridgecrest is not excluded. The City of Ridgecrest (population of 29,000) is a small town located in the high desert near Death Valley. We experience extreme heat in the summer and cold temperatures in the winter months. This extreme variance in temperatures is very harsh on our road infrastructure. The last Pavement Management Study that was conducted revealed the city had an overwhelming road condition issue. The problem was estimated to be tens of millions of dollars, which we of course do not have. Citizens were becoming impatient with the lack of streets receiving maintenance or
