Local Project Listing (2023)
Paving the Way – Phase 2 and HyRAP Streets Project
Location Various Locations City or County Responsible for Project City of Montebello Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author René Bobadilla, P.E. Organization City of Montebello Address 1600 West Beverly Boulevard, Montebello, CA 90640-3932 Phone (323) 887-1350 Project Description MONTEBELLO – BRINGING SUSTAINABLE STREETS TO OUR RESIDENTS Cities throughout Southern California struggle with aging streets, limited budgets and looming environmental mandates. Montebello recently confronted those challenges with two innovative street projects, repaving nearly 100 streets. Montebello became the first California city to use the advanced Composite Layering System process, HyRAP® Hot Mix Asphalt (HyRAP®) on an Asphalt-Rubber Aggregate Membrane (ARAM), referred to as HyRAM™. Conventional hot mix asphalt is a combination of virgin aggregate and liquid asphalt (oil), whereas HyRAP® is produced almost entirely using recycled asphalt and petroleum rejuvenators, therefore resulting in a reduction of 100% of virgin aggregate and up to 90% in
Downtown Streets Circulation Project Redding
Location Market Street at Yuba Street, Butte Street and Tehama Street City or County Responsible for Project City of Redding Category Complete Streets Projects Author Chuck Aukland, PE Organization City of Redding Address 777 Cypress Avenue, Redding, CA 96001 Phone (530) 245-7156 Project Description The City of Redding Downtown Streets Circulation Project is an exemplary local road transportation project that is the centerpiece of downtown transformation and revitalization in Redding, California. This project utilized Affordable Housing and Sustainable Communities grant funding from the California Department of Housing and Community Development to reintroduce a local road that had been closed to vehicular traffic since 1972 and improve the facilities to better serve the downtown area and new residents of affordable housing calling the area home. The reintroduction of Market Street and modifications to Butte Street and Yuba Street not only reintroduced vehicle traffic to the area, but improved pedestrian and cyclist
City of San Jose 2021 ADA Curb Ramp Request Project #2 – Sustainable Mix Design
Location San Jose (various) City or County Responsible for Project City of San Jose Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author Irene Ding Organization City of San Jose Address 1404 Mabury Rd, San Jose, CA 95133 Phone 415-816-2382 Project Description The City of San José’s “2021 ADA Curb Ramp Request Project #2 – Sustainable Mix Design” was the City’s very first pilot project aimed at reducing the carbon footprint of its concrete construction activities. The project constructed/upgraded 94 concrete curb ramps to be ADA compliant in response to residents’ requests for improved sidewalk and street accessibility for wheelchair users and people with disabilities. The scope of work included the design and construction of curb ramps, including improving curb and gutter, and adjacent sidewalk. The City of San José collaborated with the California Nevada Cement Association and U.S. Concrete to develop a specification for low-carbon concrete
Sierra Highway Sidewalks
Location Sierra Highway between Sarabande Lane and Hillfield Lane City or County Responsible for Project City of Santa Clarita Category Complete Streets Projects Author Shannon Pickett Organization City of Santa Clarita, Capital Projects Division Address 23920 Valencia Blvd., Suite 300 Santa Clarita, CA 91355-2196 Phone 661-255-4968 Supporting Documentation https://savecaliforniastreets.org/wp-content/uploads/2023/02/2023-02-07_63e1a1100853c_BackupforSierraHwySidewalks.pdf Project Description Ensuring safe paths of travel along City sidewalks and enhancing pedestrian safety are goals of the City of Santa Clarita (City) 2025 strategic plan and Local Roadway Safety Plan. The Sierra Highway Sidewalks project supports those safety goals by constructing an uninterrupted path of travel between the Canyon Country Community Center and Skyline Ranch development. The path of travel along Sierra Highway was wildly different from one property to the next. Pedestrians transitioned between sidewalks, planters, gravel, driveways, front yards and parking lots. Accessing transit, shopping, schools, and residences required pedestrians to maneuver through different elevations, grades, and surfaces
Iron Horse Trail Gap Closure – Livermore
Location Isabel Avenue to Murrieta Boulevard City or County Responsible for Project City of Livermore Category Complete Streets Projects Author Roberto Escobar Organization City of Livermore Address 1052 South Livermore Ave Phone (925) 960-4532 Supporting Documentation https://savecaliforniastreets.org/wp-content/uploads/2023/02/2023-02-07_63e1a1021719a_IHTrailTrailLivermoreLocationMapandPics2-6-23.pdf Project Description This project is a major milestone that completed one-mile gap of the Iron Horse Trail between the easterly edge of Downtown Livermore and the City of Pleasanton and resulted in a connection of Iron Horse and other local trails to the interregional Iron Horse Trail network in all the cities of Contra Costa County. This trail was planned through Livermore and over the last 10 years Livermore constructed several internal segments along downtown that run parallel the Union Pacific railroad tracks and connect to Livermore’s Downtown Transit Center. The goal of connecting to the regional Iron Horse Trail network and provide a continuous active transportation corridor between Concord and Livermore was
Devlin Road and Vine Trail Extension Project
Location Devlin Road/Boone Drive to Green Island Road City or County Responsible for Project City of American Canyon Category Complete Streets Projects Author Erica Ahmann Smithies Organization City of American Canyon Address 4381 Broadway Street Phone 7076474366 Supporting Documentation https://savecaliforniastreets.org/wp-content/uploads/2023/02/2023-02-07_63e19ec66748b_2023DevlinRoadandVineTrailExtensionProject.pdf Project Description The significance of the Devlin Road project is that it’s the final segment of a 3.5 mile stretch from the City of American Canyon to Soscol Ferry Road at Highway 29/221. In addition, the project connects the Green Island Road Industrial Area and the Napa County Airport Industrial Area allowing for business to business drivers to move within the industrial area without needing to use the highway. The need for a parallel route during an emergency closure of Highway 29 was put into action as recent as January 2023 when the highway was closed due to flooding. Without this segment, a highway closure between South Kelly Road and
2020-21 Overlay and Slurry Seal Program
The City of Santa Clarita (City) is the third largest city in Los Angeles County, and as such we strive to maximize our resources to preserve our growing pavement infrastructure. We employ a five-year pavement management plan to strategize the locations and treatments for our pavement projects. Our multi-year pavement management plan utilizes current pavement management principals of doing the right thing to the right pavement at the right time (Federal Highway Administration). The City’s maintained pavement network consists of 1,252.09 lane miles and 112,164,467 square feet. Maintenance for our pavement network is prioritized using a critical point management approach which focuses on the rehabilitation and maintenance of streets above rather than below a critical point pavement condition index (PCI). Before this project, the City’s overall PCI was 70, but with all of the creative strategies we employ, the City’s overall PCI rating increased to 72 after completion. The City
James Bypass Overflow Bridges on Manning Avenue
James Bypass was a multiple bridge project executed using the accelerated bridge construction method in order to keep Manning open to trucks and traffic for as much of the project duration as possible. The foundations for the two new bridges were constructed under the existing bridges, and the road was closed down for only 35 total days to demolish the old bridges, construct the new bridges, and pave the roadway. Since there was a very limited amount of space under the bridges to construct the foundations, the girders were designed with footings that would rest on the abutments and pier caps. Unfortunately, while pre-casting the foundations, it was discovered that alternative designs needed to be considered because the original girder design wouldn’t work. A design was chosen that raised the elevation of the pier caps and abutments utilizing a secondary concrete pour. While it added to the necessary road closure
Green Tree Blvd. Extension Project
The Green Tree Extension is the final phase of a three-phase multi-jurisdiction regional project. The agencies involved with permitting and funding are the City of Victorville, the San Bernardino County Transportation Authority (SBCTA), the County of San Bernardino, and the Town of Apple Valley. The project was added to the City of Victorville General Plan Circulation Element in 1988 and an alignment study was completed in 1994. In 2008, the Town of Apple Valley started the environmental document for the regional corridor project. In 2016, design and the right of way acquisition started for the Green Tree Extension. In 2020, right of way was certified. The construction contract was awarded in March 2021. The project is scheduled to be complete in May 2023. The Green Tree Boulevard Extension Project will extend Green Tree Boulevard from Hesperia Rd. to Ridgecrest Rd./Yates Rd., for a distance of over one mile. Integral to
North Dinuba Infrastructure Improvements Project
The City of Dinuba received an award of $4,198,800 through the Community Development Block Grant (CDBG) program for the North Dinuba Infrastructure Improvements Project. The project has brought much needed sewer, storm drain facilities, street improvements and a pocket park to an underserved area of town that was previously annexed by the City of Dinuba. These improvements will greatly benefit the residents who reside within the project service area. Not only will this project provide these residents with better infrastructure and a new park, it will also improve the overall quality of life in the area. The project met the Low Moderate Area (LMA) National Objective and will benefit approximately 7,370 persons that reside within this project service area. The North Dinuba Infrastructure Improvements Project installed approximately 3,300 lineal feet of sewer main to serve the current residents within the Griggs Avenue neighborhood, Western Sky Mobile Home Park, and other
Folsom Boulevard Streetscape Enhancement Project Phase I-V
Folsom Boulevard is a major arterial running east-west through Rancho Cordova that was underutilized for many years prior to City incorporation. Folsom Boulevard was previously a wide expanse of asphalt with minimal landscaping and accommodations for pedestrians and bicycles. Prior to completion, the entire corridor did not have sidewalk on the south side that serves the light rail. This meant that pedestrians, students and wheelchair users using light rail traveled on the shoulder of buys Folsom Boulevard near traffic. This project provides safe sidewalk access to education, jobs, housing, shopping, and transit. The project also included three murals by local artists, creating a place out of the former freeway alignment. Early in Rancho Cordova’s history, upon incorporation in 2003, the Folsom Boulevard and Mather Road Enhancement Master Plan and the Folsom Boulevard Specific Plan were created to transform the corridor into a boulevard that enhances safety, attracts pedestrians and bicyclists,
Colima Road Rehabilitation Project
The City of Whittier completed the Colima Road Rehabilitation Project in September 2022. The Project focused on Efficient and Sustainable Road Maintenance and Reconstruction. Project limits on Colima Road were from Lambert Road to Mar Vista Street. Due to cost savings, the project limits were extended from Mar Vista Street to the Northern City Limits. Colima Road transports traffic to various shopping centers, schools, Hospitals, churches, parks, and to the Puente Hills Open Space Preserve. Many cyclists use Colima Road for recreation and transportation. Prior to the street rehabilitation, Colima Road had a Pavement Condition Index of 41. The road was deteriorated from years of wear and tear as the average daily traffic is 36,000 motorists. The City of Whittier hired a consultant to design the improvement plans for the Street Rehabilitation Project. The scope of the project consisted of removing and replacing existing asphalt pavement, curb and gutter, access
San Pablo Avenue Streetscape Improvements – Phase II
The City of Palm Desert (City) is pleased to nominate the San Pablo Avenue Streetscape Improvements – Phase II (Project) for the Outstanding Local Streets and Roads Awards Program under the category of Complete Streets Projects. The Project demonstrates a commitment to Complete Streets through a successfully partnership between the City, Dokken Engineering (Engineer), Los Angeles Engineering Inc. (Contractor), and Southstar Engineering (Construction Manager). Project Overview The Project includes the 2,600-foot segment of San Pablo Avenue from Fred Waring Drive to Magnesia Falls Drive in Palm Desert. The Project reduces the existing number of lanes (four to two) through a road diet, which includes improved bikeway facilities along the corridor, enhanced pedestrian accommodations, new landscaping, on-street parking, and two roundabout intersections at the entrance of College of the Desert and Magnesia Falls Drive. The Project costs approximately $8,961,000, including $5,739,000 in City funds and $3,222,000 in Caltrans Active Transportation Program
2022 Pavement Overlay and Resurfacing Program
The City of Thousand Oaks, second largest city in Ventura County, uses its resources efficiently while maintaining its pavement infrastructure in a very good condition which is one of the resident’s highest priorities. The City’s maintained pavement network consists of 760 lane miles over an area of 56 square miles. The City utilizes a 5-year pavement management program to strategically preserve and rehabilitate the City pavement network in a cost-effective and consistent basis to ensure doing “the right thing to the right pavement at the right time”. The City has taken steps to significantly reduce the deferred cost for maintaining the pavement network in a very good condition by seeking additional funding and utilizing cost-effective pavement preservation and rehabilitation strategies. One of the major recent changes has been focusing more on preservation strategies to extend the pavement service life in lieu of removing and replacing the pavement. The City also
Sepulveda Bridge Widening Project
The widening of the Sepulveda Bridge was a major engineering project aimed at improving safety and accessibility for all road users. Sepulveda Boulevard is owned and maintained by Caltrans. The project involved widening the existing 100 feet wide and 165 feet long bridge with 5-foot sidewalks and no shoulders. Based on a Caltrans Bridge Inspection Report in 2009, the existing structure was given a status identification of “Functionally Obsolete” and a recommendation for seismic retrofitting of the existing non-ductile columns. The service life of the existing bridge structure had already exceeded 80 years and could no longer safely support daily traffic. In addition, the average daily traffic within the project area in 2012 was approximately 71,000 vehicles with a volume-to-capacity ratio of 1.263 and a service level of F. A V/C ratio over 1 indicates that the roadway demand is higher than the capacity and there is severe congestion. The
2022 Resealing and Complete Streets Project
The City of San Luis Obispo is pleased to nominate the 2022 Resealing and Complete Streets Project, with particular emphasis on complete streets elements within the City’s downtown core, for a Save California Streets Award, Complete Streets Projects category. Completion of this project has improved City of San Luis Obispo’s streets and sidewalks, making them safer, more accessible and more sustainable for future use by enhancing safety, accessibility and neighborhood livability for all roadway users. This high-priority transportation project included repairing and extending the life of pavement within the City’s downtown core and local residential streets within the several neighborhoods. The project implemented several complete street modifications in the downtown core to improve downtown safety and mobility for all road users. These strategies include elements that improve pedestrian crossing safety, increase separation between bicyclists and motor vehicle traffic, and calm traffic and reduce speeds through the downtown. Overall project summary:
Tank Farm Road and Orcutt Road Roundabout
The City of San Luis Obispo is pleased to nominate the Tank Farm Road and Orcutt Road Roundabout for a Save California Streets Award, Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects category. As a complex effort at the gateway of San Luis Obispo, this project benefitted from an exemplary alliance between the City, designer, construction manager, and contractor—presenting one unified team to meet and mitigate challenges throughout the project lifecycle. This high-priority transportation project constructed a roundabout at the heavily travelled intersection of Tank Farm Road and Orcutt Road, reconfiguring the intersection from side-street stop-control to a four-legged roundabout. The project relieves lengthy delays and vehicle queues during peak commute periods, improves safety, reduces long-term maintenance costs and reduced greenhouse gas (GHG) emissions. Construction for the project began in September 2021 and was completed in August 2022. Final construction costs were $4.1M, and the project was completed within
SSF 2022 West of 101 Pavement Rehabilitation Projects
With over 140 centerline miles of roadway, the City of South San Francisco’s (SSF) pavement network represents a highly visible and valuable asset to the community and local businesses. The residents of the City of SSF (City) identified the condition of the roadways a priority concern through a public outreach process to support the Measure W sales tax the City approved in 2015. As a result, the City secured a $24 Million in bond funding for the SSF Pavement Management Program (PMP) in 2021 to catch up on deferred street maintenance. The City hired Nichols Consulting Engineers (NCE) of Richmond, California for design of the 2022 West of 101 Pavement Rehabilitation Project. By performing most of the maintenance in one large-scale project, as opposed to smaller annual projects, the City was able to maximize economies of scale; significantly reduce design, construction mobilization, and future street maintenance costs. This program brought
20/21 Surface Treatment Project
The project we’re presenting meets the safety and sustainability needs of California’s San Luis Obispo County visitors and residents. Through the course of this work, we’ve upgraded or installed 29 ADA-compliant curb ramps, improved 9 ADA-compliant parking stalls, and resurfaced 60 miles of roadway, some of that including bike lanes, making this a truly inclusive, multi-modal success story. The County of San Luis Obispo maintains over 1,100 miles of paved road. Our 5-year Pavement Management Program (PMP) plans 55-60 miles of road to be surface-treated each year. The County has several cost-effective options that allow us to be proactive in rehabilitating roads rather than reacting to deterioration requiring complete reconstruction. Micro-surfacing is one of the most versatile tools we currently use for road maintenance due to its cost-effectiveness and long-lasting results. In the 20/21 surface-treatment project, partnerships with property owners, county staff, other government agencies, community advisory groups, and private
City of Stockton Miner Avenue Complete Streets
The Miner Avenue Complete Streets project was a comprehensive redesign of a busy thoroughfare in Downtown Stockton. This 10 block project was designed in phases, utilizing several different funding buckets and multiple agency partners. The final product resulted in a beautifully renovated roadway that reduced traffic lanes from four lanes to two, installed bike lanes, designed a new roundabout, and fixed the path of travel to be accessible for pedestrians and those with disabilities. Planning for the rehabilitation of Miner Avenue started in 2005 and was completed in 2022. Due to the size and scope of the project, plus the new features added, the City of Stockton utilized several different funding sources, that ranged from local transit grants to larger transportations grants such as ATP and CMAQ. By working through the project in several phases and funding pools, the City was able to piece the project together and achieve the
Miner Avenue Complete Streets
The Miner Avenue Complete Streets project was a comprehensive redesign of a busy thoroughfare in Downtown Stockton. This 10-block project was designed in phases, utilizing several different funding buckets and multiple agency partners. The final product resulted in a beautifully renovated roadway that reduced traffic lanes from four lanes to two, installed bike lanes, designed a new roundabout, and fixed the path of travel to be accessible for pedestrians and those with disabilities. Planning for the rehabilitation of Miner Avenue started in 2005 and was completed in 2022. Due to the size and scope of the project, plus the new features added, the City of Stockton utilized several different funding sources, that ranged from local transit grants to larger transportations grants such as ATP and CMAQ. By working through the project in several phases and funding pools, the City was able to piece the project together and achieve the final
Bridge Inventory Management and Maintenance Program
Orange County Public Works (OCPW) maintains 64 bridges within unincorporated Orange County. OCPW has developed a Bridge Inventory Management and Maintenance Program (BIMMP) to organize and monitor bridge inventory, rank bridges by type of work needed, and identify bridge projects for County’s Capital Improvement Plan (CIP) and Maintenance Improvement Plan (MIP). Currently County’s MIP averages $2.5M dollars a year and consists of maintenance of 3-4 bridges per year and County’s 7-Year CIP includes 9 bridges identified for replacement and rehabilitation, valued at approximately $74M. BIMMP organizes inspection data from Caltrans bi-annual bridge inspection reports for bridges registered in the National Bridge Inventory (NBI) database. Caltrans inspection reports include conditions and rankings of various elements of the bridges and work recommendations. County supplements Caltrans inspection reports with its own inspections to verify work recommendations. For structures that are not inspected by Caltrans but are still within County’s jurisdiction, OCPW performs own
North Park, Mid-City Bikeways Project: Georgia/Meade and Landis
The SANDAG North Park | Mid-City Bikeways Project: Georgia – Meade and Landis includes 6.6 miles of low-stress bikeways in the North Park and Mid-City communities of San Diego, filling key connections in the Regional Bike Network. Through extensive coordination with the community, Kimley-Horn developed the project features, which include buffered bike lanes, bike boulevards, 19 neighborhood traffic circles, five bend-outs, three raised crosswalks, curb extensions, high-visibility crosswalks, traffic signal modifications, street lighting, rapid rectangular flashing beacons, reverse angle parking, wayfinding, and other traffic calming features. The project also includes green street features such as green gutter BMP edge islands and drought-tolerant landscaping. This project transforms the existing streets to make walking and biking more comfortable for all ages and abilities, providing vital community connections, especially for students and people with limited travel mode choices. This project improves safety and mobility, increases bicycling and walking, and helps achieve greenhouse gas
Bello Street Bridge Replacement
The Bello Street Bridge, a 125-foot-long single span steel Pratt truss structure, was completed in 1913. The bridge was closed in 1983 due to major deficiencies and continued to deteriorate for almost three decades due to the corrosive coastal environment. Rehabilitation of the bridge was not feasible due to the advanced deterioration, insufficient service load carrying capacity and an obsolete bridge width. In 2011 the City successfully obtained 100% federal replacement funds using the Federal Highway Bridge Program (HBP) to replace the bridge and reopen a viable crossing of Pismo Creek. The project aim was to reopen a vital transportation link and evacuation route that had been closed for an extended period of time. When open, the bridge provides greater access to the U.S. 101 northbound onramp on Bello Street by those at the southern end of Highway 1. Further, the Bello street Bridge provides a more efficient route for
Marsh Drive Bridge Replacement Project
10.1 Million Marsh Drive Bridge Replacement over Walnut Creek Project replaced the existing reinforced concrete slab bridge originally constructed in 1938 as a 6-span bridge, and subsequently lengthened in 1965 by adding 4 additional reinforced concrete spans, creating a 10-span bridge. The existing bridge was 325 feet long by 34 feet wide. The new bridge was designed to correct all the existing bridge deficiencies and meet traffic needs for traveling public. Funding for this project was provided by six sources, including Federal Highway Bridge Program Funds. The project replaced an existing structurally deficient and geometrically obsolete bridge with a new 340 feet long and 55 feet wide 5-span bridge, pre-stressed, voided concrete slab structure bridge supported by 36-inch diameter drilled hole cast-in-place concrete piles. The new bridge elevation was raised approximately seven feet with fewer supports in the channel to improve hydraulic capacity and meet hydraulic standards. The roadway approaches
Bardin Road Safe Routes to School Improvements
The Bardin Road Safe Routes to School Improvements Project is a road diet and safety enhancement project with a focus on improving vehicular, pedestrian, and bicycle access to Bardin Elementary School. Kimley-Horn utilized two contiguous roundabouts to maintain vehicular flow while providing safe access to the school’s drop-off and pick-up zone. The original intersection of Bardin Road and Alisal Street consisted of three separate intersections closely spaced with multiple decision points. Vehicles from the north and west, where the majority of the students live, did not have an easy way to access the school’s drop-off and pick-up location. As a result, parents were either making illegal U-turns or dropping off their children on the opposite side of the street, forcing students to cross Bardin Road at various locations without crosswalks. School-bound traffic was also using alternative routes along Monte Bella Boulevard and Sconberg Parkway to get to the drop-off and
Overlay 2022
The Overlay 2022 project is the most recent iteration of the City’s Annual Road Maintenance Program. This program has evolved over the years, using new pavement materials and technologies, creating and utilizing a pavement management system, and piloting different treatment methods. The City’s Overlay 2022 project mill and paved twenty-seven residential, collector, and arterial streets citywide, and was funded in part by RMRA. The project utilized three different types of asphalt: conventional, rubberized, and fiber reinforced. El Cajon has been installing rubberized asphalt (RAC) on major thoroughfares for over a decade. RAC products have demonstrated enhanced durability, noise reduction, crack resistance, and better longevity with respect to conventional asphalt (AC). RAC is produced by grinding up old tire rubber and incorporating it into the asphalt binder, but it can cost up to 50% more per ton than AC. Fortunately, the City received a $350,000 grant from CalRecycle to offset the
Road Safety Audit on Ironwood Avenue
This project was funded by the Highway Safety Improvement Program (HSIP); the HSIP is a competitive grant in which municipalities, cities, counties, tribal lands, etc. apply and compete for funding. The HSIP is a core federal-aid program whose purpose is to achieve a significant reduction in traffic fatalities and serious injuries on public roads. This successful application required a data-driven approach to improving highway safety on all public roads that focuses on performance; this means that when applying, the city had to strategize and show actual collision data that demonstrated that the proposed location was a high collision area. After the city did this, it also proposed countermeasures known as Crash Reduction Factors (CRFs) in order to reduce the number of collisions occurring at the project location extents. Upon being selected as a successful recipient of the grant, the city proceeded to hire a consultant to produce signing and striping
City of Moreno Valley Local Road Safety Plan
A Local Roadway Safety Plan (LRSP) is a means to provide local and rural road owners with an opportunity to address unique highway safety needs in their jurisdictions while contributing to the success of the Strategic Highway Safety Plan (SHSP). An SHSP is a statewide data-driven traffic safety plan that coordinates the efforts of a wide range of organizations to reduce traffic accident fatalities and serious injuries on all public roadways. This SHSP establishes goals, objectives, and places emphasis on challenge areas and intends to address the 4Es of traffic safety: Engineering, Enforcement, Education and Emergency Services. The process to develop an LRSP, funded through a Local Roadway Safety Plan (LRSP) grant provided by the California Department of Transportation (Caltrans), is to identify and analyze safety problems and recommend safety improvements. Thus, once prepared the LRSP document creates a framework and plan of prioritized list of improvements and actions that
Matilija Dam Ecosystem Restoration Santa Ana Blvd Bridge Replacement
The replacement of the Santa Ana Blvd Bridge over the Ventura River is a gateway project to and a crucial step towards the realization of the removal of the Matilija Dam — an essential project for the long-term environmental health of the Ventura River watershed. The new bridge project with design funding from the California State Coastal Conservancy and construction funding from the California Department of Fish and Wildlife, is key to restoring fish habitat, biodiversity, and coastal wetland ecosystems as part of the larger watershed-scale ecosystem restoration effort. The old bridge was 210 feet long, and the new bridge is 350 feet long. It is wider, longer, and eliminates current and future concerns with increased sediment transport (which will occur with or without Matilija Dam removal) while enhancing endangered steelhead (Oncorhynchus mykiss) migration. The new bridge also provides unimpeded traffic access across the Ventura River, adds a sidewalk (north
Santa Gertrudis Creek Pedestrian/Bicycle Trail, Phase 1.
This project included design, environmental, and construction of the extension and interconnect of the existing Santa Gertrudis Creek Pedestrian/Bicycle Trail from Ynez Road to the Murrieta Creek Multi-Purpose Trail. The extension and interconnect will provide access and under-crossings at Ynez Road, Interstate 15 and Jefferson Avenue, and a continuous paved trail along the Santa Gertrudis Creek to interconnect with the Murrieta Creek Multi-Purpose Trail. Based on previous community surveys, this is the City’s single most important trail connection, and to regional trails beyond. It would provide safe, east-west connectivity under Interstate 15 on a Class I off-street facility. This project will also complete the Temecula Loop, a 17 mile trail encircling the City utilizing the Santa Gertrudis Creek Recreation Trail, Murrieta Creek Regional Trail, bicycle lanes and natural surface paths on De Portola Road, and Class II bicycle lanes on Butterfield Stage Road. The Temecula Loop provides a family-friendly, recreation
Old Town Calabasas Sidewalk Replacement Project
Old Town Calabasas is the quintessential heart of the City of Calabasas where it pioneered the City’s origin and most of its history. Due to its unique location in the City, Old Town corridor serves as a gateway either welcoming or extending farewells to visitors. As a result, it is very important for the City and its residents, Old Town’s equitability and impactful impression. Annually, an average of 7.5 million vehicles pass through the Old Town corridor, making it one of the busiest roadways in the City of Calabasas. Old Town features the historic Leonis Adobe Museum and number of historic buildings with a fine selection of shops and restaurants. All, within walking distance of the Calabasas Civic Center. The critical part of the design for this project was the preservation of its historical character and features while improving safety and accessibility to better meet the needs of all community
South Oak Park Boulevard Rehabilitation Project
The City of Grover Beach passed a bond measure in 2014 to repair all residential streets, however, funding for non-residential streets had been limited to gas taxes and general funds when available. In 2020, voters approved a 1% sales tax measure to add a 1% Transactions and Use Tax (Sales Tax) to the City’s existing Transactions and Use Tax of 0.5%. With this increase in General Funds, along with state SB-1 (Road Maintenance and Rehabilitation Account funds) and other local funds, the City was able to fund The South Oak Park Boulevard Project, the City’s first Major Street project in five years. The City Council identified Street Improvements as a Major City Goal for FY 2021-23 and identified Pedestrian and Bicycle Safety as an important goal. With respect to the South Oak Park Boulevard project, Council also provided direction to include a buffered Class II bike lane. The section of
Fiscal Year 2021 Street Resurfacing and Sewer Repair Project
The Fiscal Year 2021 Street Resurfacing and Sewer Repair Project repaved miles of City streets, improved over 13,200 linear feet of concrete curbs, upgraded ramps to ADA standards, planted a multitude of street trees, upgraded signing and striping markings, installed speed humps, fully reconstructed a hillside roadway washed away by torrential rain events, installed over 950 feet of new guardrail, and improved over 8,000 feet of the City’s critical sewer network throughout various neighborhoods. To preserve the integrity of the newly paved street surfaces, City staff coordinated with multiple internal and external agencies to properly plan future projects that would not disrupt new infrastructure during the pavement moratorium period and beyond. Multiple project impact plans were sent to the City’s various departments to allow them ample time to complete any necessary infrastructure repairs before the start of construction, including our own Glendale Water and Power (GWP) department, given their extensive
West Capitol Avenue Safety Enhancement and Road Rehabilitation Project
West Capitol Avenue is the major east-west arterial through the City of West Sacramento connecting industrial, commercial, and residential land uses along the corridor. Initially built in the 1950s as part of the Lincoln Highway, West Capitol Avenue has been overdue for extensive rehabilitation and modernization. West Capitol Avenue is envisioned as the Downtown area which includes a central core with a vibrant main street that takes advantage of its prime location, provides an attractive setting for a variety of land uses, including the Civic Center, Community Center, Transit Hub, as well as residential, commercial and urban parks that are accessible via multiple modes of transportation. The roadway, formerly US 40, had fallen into a state of disrepair showing signs of distress with PCIs as low at 30. Previously, there had also been numerous collisions along the corridor. This $13 million project, funded by several federal and state grants increased
Humboldt Avenue Street Improvements
There have been longstanding issues with inadequate drainage and street flooding within the City of Chowchilla’s historic core, generally the area bounded by Front Street, 15th Street, Ventura Avenue and Mariposa Avenue. Due to the long surface drainage distances and inadequate intersection crossing improvements, surface runoff moves very slowly along the streets in the area and results in frequent street flooding. In order to address the issue, the City developed a conceptual plan for storm drainage improvements to be made within the historic core, and a plan for phasing of the improvements. Phase 1 of the improvements was the Humboldt Avenue Street Improvements Project. The Project installed storm drainage facilities to serve the southeastern portion of the City’s historic core to collect stormwater runoff and convey it the City’s retention basins. To convey the stormwater, a total of 7,451 lineal feet of storm drain piping was installed, along with storm
Local/Residential Street Improvement Project (Phase I of Cycle 2)
In 2021, the City of Burbank (City) completed its first 10-year citywide street resurfacing program (“Cycle 1”). Cycle 1 comprised of ten phases (or years) of resurfacing projects annually addressing streets rated poor and below in two (2) targeted maintenance zones throughout the City. In 2022, after the completion of Cycle 1, the City developed a new and more ambitious 5-year citywide street resurfacing program (Cycle 2) with the goal of significantly improving the overall network pavement condition index (PCI) to a ‘Good to Very Good’ rating (PCI of 70+) within 5 years (or 5 phases), based upon the industry standard StreetSaver software. The first year of the Cycle 2 Program was completed October 2022 and was the largest street improvement project in the City’s history! The project resurfaced residential and collector streets in the Magnolia Park and adjacent neighborhoods in four (4) maintenance zones in the City, improving over
Valley Boulevard Class IV Protected Bikeway
The Class IV Protected Bikeway along Valley Boulevard is the first of its kind in the City of Pomona. This 1.5-mile bi-directional facility is located on the south side of the major arterial and is separated from the through lanes by curb median and plastic delineators. This Bikeway encourages the replacement of motorized vehicle trips with bicycle trips, calms traffic by narrowing the street, enhances bus stops allowing for easier access to more efficient transit, and includes bicycle detection at the intersection of Valley Boulevard and Kellogg Drive to further reinforce bicyclist safety. Vibrant bike-shaped bikeway markers incorporating community school logos (Cal Poly University, Western University, IPoly High School, and the Pomona Unified School District, and the City of Pomona) are installed throughout the facility in an effort to help coalesce academics, education, and community within the City. The Bikeway has improved the community’s quality of life by promoting active
The Chico-Paradise Skyway
The Skyway Location: City of Chico – Town of Paradise City or County Responsible for Project: Butte County Award Category: Roads: Efficient & Sustainable Road Reconstruction Project Narrative Description of Your Entry: For 72 years, the Skyway has served our mountain communities by providing an arterial connection to the State Highway System. Built in 1948 as a 2-lane road serving 2,400 vehicles per day, the Skyway today serves several communities and 12,000 vehicles per day, and is Butte County’s busiest roadway. The Skyway provides a lifeline to services and an emergency evacuation route. On Nov 8, 2018, an electric transmission line ignited a firestorm known as the “Camp Fire,” one of the deadliest fires in California’s history. Shortly after the fire ignited, orders were given to evacuate the local communities, resulting in unprecedented traffic. The fire burned the Skyway, causing significant damage. During the long months of recovery work, the
The Skyway
The Skyway Location: City of Chico – Town of Paradise City or County Responsible for Project: Butte County Award Category: Roads: Efficient & Sustainable Road Reconstruction Project Narrative Description of Your Entry: For 72 years, the Skyway has served our mountain communities by providing an arterial connection to the State Highway System. Built in 1948 as a 2-lane road serving 2,400 vehicles per day, the Skyway today serves several communities and 12,000 vehicles per day, and is Butte County’s busiest roadway. The Skyway provides a lifeline to services and an emergency evacuation route. On Nov 8, 2018, an electric transmission line ignited a firestorm known as the “Camp Fire,” one of the deadliest fires in California’s history. Shortly after the fire ignited, orders were given to evacuate the local communities, resulting in unprecedented traffic. The fire burned the Skyway, causing significant damage. During the long months of recovery work, the
Conejo School Road and Willow Lane Sidewalk and Bike Lanes Project
The City of Thousand Oaks is committed to improving the quality of local streets, providing safe and accessible facilities for pedestrians and bicyclists, and encouraging active transportation throughout the community. As part of this commitment, the City has an on-going program to construct sidewalks and bike lanes throughout the community. This project filled critical missing gaps in the sidewalk network within these older neighborhoods as well as added defined bicycle lanes. The project provides 1.5 miles of sidewalk and Class II bicycle lane improvements on Conejo School Rd. and Willow Ln. from Hampshire Rd. to Hillcrest Dr. Previous project conditions required pedestrians and wheelchair users to travel in the roadway adjacent to a 40-mph road and/or travel off pavement onto an uneven dirt surface. The completion of the project has created a safe continuous and comfortable facility for all users, including students, seniors and persons with disabilities. The project connects
Culver Boulevard Realignment & Stormwater Project
The Culver Boulevard Realignment and Stormwater Capture Project is a $18.3M multi-benefit project improves traffic, pedestrian safety, bicycle mobility, improves and protects water quality by capturing runoff from 796 acres of watershed, treats and stores runoff in an 8 acre-feet underground reservoir, and filters and discharges some a portion of the treated stormwater back into the storm drain system. Treated stormwater is also pumped and used as irrigation for the 2-acre landscaped median. The project improves quality of life by improving traffic flow with the road realignment of Culver Boulevard. Pedestrian safety was improved with enhanced cross walks and improved traffic signals. Mobility was improved with separated pedestrian and bicycle paths on the median. Parking buffers were installed to protect parked vehicles. Interpretive signage and interactive educational experience using augmented reality to improve the local experience and highlight the cultural history and water quality benefits of this project along Culver
Lincoln Avenue Cold Pavement Recycling
Lincoln Avenue consists of approximately 14.5 miles of rural County Road, servicing primarily farming traffic. The existing pavement was heavily oxidized and distressed due to many years of heavy traffic, and during the project the County elected to widen the roadway as well, adding an additional 4-ft of shoulder width to each lane. The County determined that Cold Central Plant Recycling (CCPR) would be the most effective and cost-efficient method of rehabilitation. CCPR would allow the County to utilize the RAP generated from the existing pavement to create a new pavement section, while simultaneously providing the opportunity to adjust grades, widen shoulders, and perform any necessary digouts or base repairs. In total, of the 14.5 mile stretch of roadway, approximately 8.5 miles was designed for rehabilitation using CCPR of varying depths. The remaining 6 miles was rehabilitated using lesser depths of removal and replacement, as the pavement distress was not
Active Warning Signage
Enhancing pedestrian safety has been identified as a key emphasis area in the City of Santa Clarita’s recently completed Local Roadway Safety Plan. Pedestrians are involved in one-third of the City’s fatal and severe injury collisions in the past five years. The Active Warning Signage project was implemented at the intersection of Soledad Canyon Road and Valley Center Drive. The project was completed on schedule, within budget and has been operational since June 2022. The City continually explores cost-effective and innovative solutions to enhance safety at signalized intersections in the City. At this intersection, there is a channelized free right-turn lane that does not require right-turning vehicles to stop. Due to the geometrics of the intersection, there is not a clear driver-pedestrian line of sight when pedestrians cross between the sidewalk and channelized island. This has led to pedestrians being vulnerable due to poor yielding rates from motorists. To support