Local Project Listing (2024)
The Windsor River Road and Windsor Road Intersection Improvement and Multi-Use Pathway Connector Project
Location Windsor River Road and Windsor Road City or County Responsible for Project Windsor Category Safety or Intelligent Transportation System Projects Description The Windsor River Road and Windsor Road Intersection Improvements and Multi‐Use Pathway Connector Project is a transformative transportation project with unique challenges but also substantial benefit for the community it serves. For this project, the Town of Windsor hired GHD to provide project planning, public outreach, permitting, grant assistance, design, and engineering services during construction. The scope of work included construction of a roundabout, at‐grade rail crossing safety devices, pedestrian crossing safety improvements, and a multi‐use pathway segment. The results of the project are improved safety, enhanced multi‐modal connectivity, environmental benefits, and a better sense of place and gateway into the downtown Town Green area. The roundabout design created safer active transportation infrastructure at a complex intersection. The new design is expected to reduce the number of
Loma Ridge Widening Project
Location 2644 Santiago Cyn Rd, Silverado, CA 92676 City or County Responsible for Project Orange County CA Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Loma Ridge Project (Project) widened approximately 5,600 feet of road leading to the County’s Emergency Operations Center (EOC) from one lane serving both directions to one lane in each direction. The EOC serves all Orange County residents to provide essential emergency services in the event of a catastrophe. Prior to completion of the Project, visibility in the area was low, the road had non-standard guard rails, above ground utilities in a high fire hazard area and poor quality pavement. The Project’s sustainable features included revegetation with a native hydroseed plant palette for any temporary impact areas, and an engineered filtration blanket for each roadway drainage outlet that included riprap, gravel, sand and geotextile designed to capture pollutants, maximize infiltration
Leland Avenue, et al., Street Improvement Project
Location Unincorporated South Whittier City or County Responsible for Project Los Angeles County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description When it comes to street improvements, Los Angeles County Public Works has utilized sustainable pavement treatments with outstanding success. Public Works continues its commitment in preserving and improving the quality of our roads in a cost-effective and environmentally responsible way. California Mandate AB32 is a state law requiring the reduction of greenhouse gas (GHG) emissions and working within limited budgets were key motivators for developing Public Works’ sustainable approach which includes: (1) focusing on preserving roads in good condition; (2) using recycled materials in pavement treatments; and (3) reutilizing in-place materials during construction. The Leland Avenue, et al., Project that was completed in September 2023 showcases the benefits of Public Works’ sustainable approach. This project was funded with the Road Maintenance Rehabilitation Account funds.
Leong Drive and Fairchild Drive Reconstruction
Location Leong Drive from Alamo Court to Fairchild Drive and Fairchild Drive from Leong Drive to 415 Fairchild Drive City or County Responsible for Project Mountain View Category Safety or Intelligent Transportation System Projects Description The Leong Drive and Fairchild Drive Reconstruction project was a pavement rehabilitation and bike/pedestrian infrastructure improvement project funded in part through Santa Clara County’s 2016 Measure B as well as City of Mountain View’s Capital Improvement Program. Leong Drive and Fairchild Drive are both heavily used neighborhood collector streets. Together, they serve as an important link between neighborhoods and regional job centers. Both streets were identified for pavement treatment due to poor pavement condition. This provided staff with an opportunity to deliver improved bike infrastructure as recommended in the City’s 2014 Bicycle Transportation Plan Update. There was no existing bicycle infrastructure on both streets that either deterred bicyclists from taking this route or leaded
Neighborhood Pavement Preservation & Arterial Pavement Repair Project
Location Southport Parkway, Jefferson Blvd, Lake Washington Blvd City or County Responsible for Project City of West Sacramento Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The City of West Sacramento’s current Neighborhood Pavement Preservation Program & Arterial Streets Pavement Repair Program have been an important step in improving the condition, safety, and longevity of City’s roadway system. After many years of deferred maintenance on its road system, the City Council approved a Pavement Management Plan for the City. The Plan utilizes two programs: the Neighborhood Pavement Preservation Program which focuses on residential neighborhood streets and the Community Investment Program which focuses on arterial streets throughout the City. The Neighborhood Preservation Program focuses on preserving local roadways with the use of various seal coats. Staff has broken the City into ten areas for the Neighborhood Preservation Program and prioritized the areas to maximize the longevity
Regional Arterial Traffic Performance Measurement System (RATPeMS)
Location The RATPeMS project has developed a Level of Service (LOS) model for 157 signalized intersections within the City of Glendale, creating an arterial traffic performance measurement system that allows for real-time operation timing.” This revision adds some clarity by specifying that the LOS model is for signalized intersections within the city and emphasizes the creation of the traffic performance measurement system. City or County Responsible for Project City of Glendale Category Safety or Intelligent Transportation System Projects Description The RATPeMS project has successfully developed a Level of Service (LOS) model for 157 signalized intersections within the city, transforming them into an advanced arterial traffic performance measurement system that enables real-time operation timing. Additionally, the project has implemented a cutting-edge fiber optic system called the State-of-the-Art Iteris Vantage Next video detection system at multiple locations, seamlessly connecting them to the City’s Traffic Management Center (TMC). This system provides real-time
Maintenance District 6 Pavement Rehabilitation Phase I Project
Location City of Glendale Maintenance District 6 (citywide) City or County Responsible for Project City of Glendale Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The MD6 Phase I project consisted of removal and disposal of asphalt and Portland cement concrete (P.C.C.) pavements, including installation of: 0.4 miles of grinding and placement of Asphalt Rubber Hot Mix pavement (ARHM); 1.0 miles of ARHM over Asphalt Rubber Aggregate Membrane (ARAM system III); 1.1 miles of emulsion aggregate slurry (Slurry Seal Type II) over ARAM (ARAM System I); 2 miles of crack sealing material and emulsion aggregate slurry (Slurry Seal Type II). The project achieved safety, preservation, and sustainability goals because of the extensive work performed throughout the City’s Maintenance District. The project is a first for the City, in which various pavement treatment systems were implemented to improve the City’s Pavement Condition Index (PCI) which required
Rumrill Blvd. Complete Green Streets Project
Location Rumrill Blvd. in San Pablo between Costa Ave. and San Pablo Ave. City or County Responsible for Project San Pablo Category Complete Streets Projects Description The City of San Pablo’s Rumrill Boulevard Complete Green Streets Project (the Project) is an overhaul of 1.67 miles of Rumrill Blvd. with elements that calm traffic, improve safety, reduce greenhouse gas emissions and improve stormwater quality. Specific improvements constructed as part of the Project include Class IV cycle tracks, street trees, green stormwater infrastructure (GSI), pavement striping, sidewalks, ADA curb ramps, flashing beacons, new traffic signal, signal interconnect cable technology, additional lighting, and improved transit stops. Rumrill Blvd. was previously negatively impacted by connectivity gaps and appropriate pedestrian, bicycle and stormwater infrastructure. These unsafe conditions hindered residents from accessing necessary services in both the cities of San Pablo and Richmond. Prior to this Project the street had two wide lanes of traffic
Broadway Rehabilitation Project
Location Broadway, between Concord St and S. Central Ave City or County Responsible for Project City of Glendale Description The Broadway Rehabilitation Project involved the surface grinding and placement of approximately 0.6 centerline miles of ARHM; surface grinding and placement of approximately 0.3 centerline miles of ARHM over Asphalt Rubber Aggregate Membrane (ARAM); selective removal, repair, and reconstruction of approximately 4,300 linear feet of damaged curbs and gutters, and 28,300 square feet of sidewalks, driveways, cross gutters, alley aprons, and bus pads; modification and reconstruction of approximately 16 existing curb ramps to meet ADA standards. The project achieved safety, preservation, and sustainability goals because in addition to improving the approximate one mile stretch of a main arterial road in the City and in the heart of downtown Glendale, it also included multiple improvements that were relatively new to the City. Installation of reflective pavement, infiltration wells, creative crosswalks, and
Kirkwood Road and Columbia Avenue Bridges
Location Over Jewett Creek just south of Corning, CA City or County Responsible for Project Tehama County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description Tehama County completed the new Kirkwood Road and Columbia Ave Bridges over Jewett Creek in December 2023. The old bridges were at the end of their service lives and both steel girder bridges were narrow with no shoulders. The Kirkwood Bridge was previously restricted to one lane due to the bridge’s condition. The new wider bridge at Kirkwood now has a 32-foot clear roadway width, while Columbia now has a 24-foot width. Both are now reinforced concrete slab type bridges and offer many advantages. These new bridges meet the function classification, terrain, and AASHTO standards; and provide safe and modern facilities for County residents and local agribusiness. Key design features provide service longevity, limited maintenance, and positive environmental effects including
Orange County Pavement Maintenance Program
Location Unincorporated Orange County City or County Responsible for Project County of Orange Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description OC Public Works (County of Orange) maintains approximately 350 miles of paved roadway with a relatively high network average Pavement Condition Index (PCI) of 81; the State average is 67. Overall, nearly 70% of our road network is rated “Very Good” or “Good” condition, a tremendous improvement from an average PCI of 62 a decade ago. As we continue to implement the program at approximately $20 million per year, we will improve our PCI to 81-86 by 2029-2030. OC Public Works’ high PCI rating is possible through innovative procurement via the JOC delivery method. Additionally, we are committed to reducing impacts to the public, promoting sustainability and increasing transparency with our customers. We can assist other local agencies interested in replicating portions of our
2023 Pavement Preservation Project
Location Various location in Yolo County City or County Responsible for Project Woodland Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Yolo County’s commitment to efficient, forward-thinking, and environmentally conscious road maintenance practices is exemplified by the success of the 2023 Pavement Preservation Project. Focused on enhancing the longevity of roads in the unincorporated rural communities and surrounding roads through sustainable approaches, this initiative strategically preserved existing infrastructure while applying innovative techniques to mitigate the need for constant maintenance. In the past few years, the community of Clarksburg and surrounding area has experienced changes to the type of farming operations. Some of the lands have been converted from row crops to orchards, vineyards, and Wineries. The project directly improves the access to farm to fork farming operations vineyards and wineries in the area. The Pavement Condition Index (PCI) for the road included in the project
Glen Helen Regional Park Rehabilitation
Location Between 15Fwy and 215Fwy on Glen Helen Pkwy City or County Responsible for Project San Bernardino County Public Works Category Safety or Intelligent Transportation System Projects Description San Bernardino County would like to nominate the Glen Helen Regional Park Rehabilitation Project Phase II for the 2024 Outstanding Local Streets and Roads Awards Program. The project improved public safety for the park visitors by rehabilitating the pavement on the main access road, improving pedestrian walkways, the Pool/Meadowlark parking lot, and by reconstructing curb ramps and parking stalls per ADA guidelines. Phase I of the project was located within Glen Helen Regional Park in the Devore area. Phase I construction consisted of milling and overlaying the existing pavement for the ticket access driveway at Gate No. 3 to the park; replacing handrails; minor drainage improvements; and applying a fog seal to the existing asphalt concrete. Phase II of this project
Phelan Road Intersection Improvements Project
Location Phelan Road at Arrowhead Road in the Phelan area City or County Responsible for Project San Bernardino Category Safety or Intelligent Transportation System Projects Description San Bernardino County would like to nominate its Phelan Road Intersection Improvements project for the 2024 Outstanding Local Streets and Roads Awards The project improved public safety by relieving traffic congestion, improving flow of traffic, and significantly reducing the potential for collisions and serious injury. This project started in September of 2022, and was funded by Federal Highway Safety Improvement Program (HSIP) grant funds and a Senate Bill 1 (SB1) Road Maintenance Rehabilitation Account (RMRA) revenue. The total construction cost for this project was $2,050,000. The project consisted of improving the following four intersections along Phelan Road: Arrowhead Road, Sunny Vista Road, Tumbleweed Road and Sonora Road, in the Phelan area. The existing conditions prior to improvements consisted of one lane in each
American Avenue and Golden State Boulevard Intersection Realignment
Location American Avenue and Golden State Boulevard City or County Responsible for Project Fresno County Category Safety or Intelligent Transportation System Projects Description The intersection of Golden State Boulevard (GSB) and American Avenue had multiple design deficiencies, including horizontal and vertical alignment of the intersection and sight distance. These geometric deficiencies, together with the proximity to the Union Pacific Railroad (UPRR) tracks and the high-speed limits of the roadways (55 mph on American Ave and 65 mph on GSB), made it very challenging to design a major realignment along all four approaches. The skewed alignment of Golden State Boulevard as it crosses American Avenue created a non-standard intersection that was unsignalized and vehicles on American Avenue crossing GSB had to stop in the median to safely maneuver the crossing. There was also a 2.5 feet grade difference between the east leg of American Ave and the GSB which created
Riverwalk Trail Northerly Extension
Location 3rd Street, C Street City or County Responsible for Project City of West Sacramento Category Complete Streets Projects Description The City of West Sacramento has been prioritizing investments in planning, deindustrialization, and infrastructure improvements in order to facilitate redevelopment and create vital neighborhoods along the Sacramento River. The City’s vision for transforming the underutilized riverfront includes recreational access to the river and enhanced pedestrian, bicycle, and transit mobility. The Washington District (District) is a 194-acre area bound by the Tower Bridge Gateway on the south, the Sacramento River on the east, A Street on the north, and portions of 6th Street and 8th Street on the west. Located along West Sacramento’s riverfront and within a mile of downtown Sacramento, the Washington District is an area that has potential for sustainable, mixed-use development. Today, the City’s dedication is apparent throughout the riverfront. In 2011, the neighborhood earned a U.S.
As-Needed Pavement Preservation Contract 4B
Location Various Locations in San Francisco City or County Responsible for Project San Francisco Public Works Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Under the As-Needed Pavement Preservation Contract 4B the Street Resurfacing Program, along with the hardworking design and construction management teams, resurfaced more than 150 blocks throughout San Francisco’s 11 districts. This greatly contributed to the FY 2022-2023 goal of resurfacing 500 blocks. In addition, with the help of As-Needed Pavement Preservation Contract 4B San Francisco’s overall Pavement Condition Index (PCI) increased to 75, one point higher than the previous year. We consistently adhere to the industry’s best practice of “Right Road, Right Treatment, Right Time.” As a result, we’ve elevated the overall network conditions while prioritizing the maintenance and resurfacing of streets in every neighborhood through the City. Attached is just one example of the many plans that were compiled to
City of Pleasant Hill 2022/2023 Street Resurfacing Project
Location Contra Costa Boulevard, Taylor Boulevard City or County Responsible for Project City of Pleasant Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The City of Pleasant Hill, working in conjunction with the Metropolitan Transportation Commission’s P-Tap grant program, evaluates the condition of each street in the City every two to three years to determine their overall condition, or their Pavement Condition Index (PCI). We use this information, in part, to help identify the City’s pavement resurfacing schedule. The City last completed this street survey in the summer of fall of 2022 and each street was ranked on a scale from 1 (worst) to 100 (new road). The City has identified 24 residential zones in the City. Each residential street within a defined neighborhood has an identified PCI value and contributes to the average score of the streets within a Residential Zone. Each Residential Zone
San Francisco’s Road Conditions Improve Pavement Condition Index to 75
Location San Francisco Roadway Network City or County Responsible for Project San Francisco Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description At the end of 2023, San Francisco achieved a Pavement Condition Index (PCI) of 75, surpassing the previous year by one point. This positions the city at the forefront of roadway conditions among major Bay Area cities. Thanks to over a decade of funding from Captial Planning and the State for the San Francisco Public Works’ Street Resurfacing Program, excellent Design and Construction Management teams who worked tirelessly to implement projects, we treated over 8,000 blocks in the last 15 years and steadily raised the PCI from the mid 60’s to 75 today. Last year alone we resurfaced over 500 blocks. We consistently adhere to the industry’s best practice of “Right Road, Right Treatment, Right Time.” As a result, we’ve elevated the overall network
City of Monterey Park Road improvement project
Location various locations citywide City or County Responsible for Project City of Monterey Park Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The City of Monterey Park successfully executed a comprehensive and strategic road improvement project, demonstrating effective planning and collaboration. The key highlights from the project include: Project Overview: Completed $23 million road improvement projects over a 2-year period. Included road overlays, slurry seal, sidewalk improvements, ADA curb ramps, and bus pads. Strategic Planning: Grouped the work strategically to obtain the best prices by reducing contractor mobilization. Grouped areas to minimize the impact on residents during construction. Concrete Improvements: Separated concrete work from asphalt work, allowing the City to stretch funding. Completed $1.5 million in concrete improvements, covering sidewalk repairs, ADA ramps, and bus pad replacement. Scope of Work: Improved 11 miles of roads through slurry seal and 37 miles through overlays. Reconstructed 32,000
Central Avenue Safety Improvement Project
Location City of Alameda City or County Responsible for Project City of Alameda as lead agency (and Caltrans partnership – partially on State Highway 61) Category Complete Streets Projects Description The $22 million project, which will start construction this summer, includes a road diet with two motor vehicle travel lanes, a two-way left-turn lane as a center lane, bikeways, three roundabouts at 1) Main/Pacific/Central; 2) Third/Taylor/Central; 3) Fourth/Ballena/Central, resurfacing, improved bus stops, enhanced pedestrian crossings and street trees/bio-retention areas. Project submitted by Name Gail Payne Job Title Project Manager Organization City of Alameda Address 2263 Santa Clara Avenue, Rm 130, Alameda, CA 94501 Email gpayne@alamedaca.gov Phone 5107476892
166th Street Improvement Plans
Location 166th Street between Pioneer Boulevard and Norwalk Boulevard City or County Responsible for Project City of Artesia Category Complete Streets Projects Description The City of Artesia is committed to sustainable transportation and has recently completed a road diet and installed green stripe bike lanes on 166th Street between Pioneer Boulevard and Norwalk Boulevard as part of the 166th Improvement Plans. This improvement encourage a shift from automobiles by making walking and biking safer in this neighborhood. This project was done in partnership with the cities of Norwalk and Cerritos as they jointly own segments of the street. The area that 166th Street is located in the City is densely populated and identified as a disadvantaged community on several state indicators. The total project area is approximately 2,880 linear feet and includes the southern portion of 166th Street from Pioneer Boulevard to Horst Avenue in the City of Artesia,
County of San Diego Local Road Safety Plan (LRSP)
Location Various, County of San Diego City or County Responsible for Project County of San Diego Category Safety or Intelligent Transportation System Projects Description The County of San Diego Local Roadway Safety Plan (LRSP) was prepared to analyze and understand the trends of potentially disproportionate impacts of severe and fatal collisions, especially in rural areas of the County. The County’s objective through this LRSP was to implement a multi-disciplinary holistic approach to strive for zero fatalities and serious injuries on the roadways, because every life counts. The LRSP evaluated 23 communities and analyzed over 16,000 collision points. Up to 50 types of queries were conducted with the available data, which helped identify verifiable, measurable, data-driven emphasis areas and any “hot spot” locations. LLG collaborated with County staff in the engineering, planning, and public health departments. The recommendations focused on a set of proven countermeasures, policies, mechanisms, and strategies, touching
Ord Terrace Elementary School Crossing Improvements Project
Location 1775 La Salle Avenue, Seaside CA 93955 City or County Responsible for Project City of Seaside Category Safety or Intelligent Transportation System Projects Description The City of Seaside is committed to developing Safe Routes to School for the children of Seaside. Ord Terrace Elementary School (School), a public school located at 1775 La Salle Avenue, serves over 400 students in Kindergarten through 6th grade in the City. The Ord Terrace Elementary School Crossing Improvement Project (Project) was a traffic-calming project to benefit the families and staff of the School by improving an important route to school. Prior to the implementation of the Project, heavy traffic and parking congestion were experienced during the morning and afternoon drop-off and pick-up periods. The prior crosswalk located across La Salle Avenue was less visible to vehicles as were the crosswalk signs which added to the safety issues students faced when crossing at
Accelerating Street Repairs
Location City-wide City or County Responsible for Project Downey Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The City of Downey owns and maintains 214 miles of roadways, consisting of 154 miles of residential streets (which make up 80% of the City’s street network), 17 miles of collectors and 43 miles of arterial highways. In March 2021, the City Council adopted the City’s Pavement Management Program (PMP) Update. A PMP provides a systematic approach to assessing, monitoring and managing the condition of highway pavements in the most cost-effective manner. The results of the study help determine the most appropriate pavement rehabilitation strategies, prioritize locations and form the basis of the City’s 10-year street improvement program. In July 2021, the City Council wanted to accelerate much needed street improvements, and adopted a program that would issue approximately $30.5 million in bonds and make payments on these
Rollins Lake Road Slide Repair Project
Location Rollins Lake Rd City or County Responsible for Project Placer County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Sculpted shotcrete soil nail wall constructed on Rollins Lake Rd to stabilize slope and prevent sliding debris risking public safety and infrastructure. See supporting documents for more details and photos. Project submitted by Name Elena Szlemp Job Title County Engineer Organization Placer County Department of Public Works Address 3091 County Center Dr. Suite 220 Auburn, CA 95603 Email eszlemp@placer.ca.gov Phone 5303082082
HSIP Cycle 10 Guardrail Upgrade Project
Location Rollins Lake Rd, Indian Hill Rd, Ridge Rd City or County Responsible for Project Placer County Category Safety or Intelligent Transportation System Projects Description The HSIP Cycle 10 Guardrail Upgrade Project involved the upgrading of existing guardrail at three locations throughout Placer County. In total, nearly 7,100 linear feet of guardrail were improved along portions of Rollins Lake Road, Indian Hill Road, and Ridge Road. At the time of project initiation, the existing guardrail was identified as deficient in the event of a collision and required updating to improve safety at these highly utilized County Roads. See attached documentation for further detail. Project submitted by Name Elena Szlemp Job Title County Engineer Organization Placer County Department of Public Works Address 3091 County Center Dr. Suite 220 Auburn, CA 95603 Email eszlemp@placer.ca.gov Phone 5303082082
I-405 Widening Design and Construction Support Services
Location Not applicable City or County Responsible for Project City of Fountain Valley Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Orange County Transportation Authority (OCTA), in cooperation with the California Department of Transportation (Caltrans), improved the mainline freeway and interchanges on Interstate 405 in Orange and Los Angeles counties. The project relieves congestion and improves operational efficiency on I-405 between State Route 73 (SR-73) and Interstate 605 (I-605) and the city streets in the City of Fountain Valley. The overall construction value of the project was $1.5 billion and work was completed in five years, with the ribbon cutting celebration taking place on December 1, 2023. This design-build project significantly improves traffic movement, reduces congestion-related accidents, and improves traffic flow within the City of Fountain Valley. Seven bridges at Ward Street, Talbert Avenue, Brookhurst Street, Slater Avenue, Bushard Street, Warner Street, and Magnolia
Upper Market Corridor Safety Improvements Project
Location Market St: Castro St to Octavia St/US-101 Highway and Guerrero St: Market St to Duboce Ave City or County Responsible for Project San Francisco Category Complete Streets Projects Description Upper Market Corridor is a multi-functional thoroughfare with heavy usage from pedestrians, bicyclists, public transportation riders, and vehicular usage in San Francisco, CA. The Upper Market corridor connects the historic Castro district from Market Street/Castro Street to Octavia Street/US-101 Highway for approximately 1 mile. The project also included Guerrero Street from Market Street to Duboce Avenue. This busy Market Street segment has unique intersections that have 6 streets intersecting leaving wide roadway space for vehicles. To beautify the corridor and promote safety to align with Vision Zero SF (aiming to eliminate all traffic deaths in San Francisco by 2024), approximately $10 Million was spent overall for the project using local funding (IPIC-Interagency Plan Implementation Committee). During planning phase, community
Golden Hill Road/ Union Road Intersection Improvements
Location Golden Hill Road/ Union Road City or County Responsible for Project City of Paso Robles Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Golden Hill Road/Union Road intersection was known as the “worst intersection in town.” Constrained by existing development the highly skewed stop-controlled intersection caused driver confusion resulting in congestion and limiting accessibility for pedestrians and bicyclists. For years the City of Paso Robles evaluated potential improvements such as signalization, realignment, and a multilane roundabout; however, all options required extensive property acquisition and eventually stalled. The City then sought the expertise of the Wallace Group team to devise an innovative solution. The outcome of our team’s efforts was a “dog bone” shaped roundabout—the first of its kind in the region—that avoided private property acquisition by limiting the roadway footprint to be within the existing paved area. CCTC analyzed the single lane roundabout
The Olive Drive Bike and Pedestrian Safe Routes to School Connection
Location Olive Drive City or County Responsible for Project City of Davis Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description The Olive Drive Bike and Pedestrian Safe Routes to School Connection project significantly strengthened the City’s 63-mile, shared-use pathway network. This project included constructing a new bicycle and pedestrian ramp, which connected the isolated, underserved Olive Drive neighborhood to the extensive Davis bike and pedestrian network. Olive Drive is nestled between train tracks and I-80, and it is part of the historic U.S. Highway 40, the first transcontinental highway. Olive Drive consists of a mix of affordable housing and market-rate apartments. The east end of Olive Drive terminates at a recently closed interstate off-ramp and pathway entrance to the Lincoln Highway 40 shared-use path. Since Olive Drive terminates on the east side, all traffic must travel as far as 0.5 miles to connect with the
Acacia Neighborhood Storm Drain and Street Reconstruction Project
Location Project is bound by Dale Street, Stanford Avenue, Josephine Street, and Garden Grove Boulevard City or County Responsible for Project City of Garden Grove Category Complete Streets Projects Description The City of Garden Grove’s Acacia Neighborhood falls within the bounds of Stanford Ave., Dale St., Garden Grove Blvd., and Josephine St. The area is comprised of 8 residential blocks and seven streets. Prior to the start of this project, the Acacia Neighborhood presented several problems. There was no storm drain system in place; the streets lacked sidewalks, curbs, and gutters; and the road conditions were deemed as “failing” with PCI falling between 10-20. The neighborhood often experienced flooding during rainy seasons with residents noting that rain water came up many driveways up to their garages and into their backyards. The Project was funded primarily by Gas Tax, SB1, Measure M2, and Water Enterprise funds, with supplemental assistance by
Riverfront Street Extension
Location 15th Street & Bridge Street City or County Responsible for Project City of West Sacramento Category Complete Streets Projects Description In 2009, the City of West Sacramento constructed the first phase of infrastructure for the Bridge District Specific Plan, which provides a framework for the development of a well planned, waterfront orientated urban district for the City of West Sacramento to transition the area from its industrial past to the vision of an urban mixed-use district. By 2020 development had largely built out the available Phase 1 area and the Riverfront Street Extension Project was needed to allow the continued revitalization of the area. The Project extended Riverfront Street approximately 0.15 mile as a two-lane concrete pavement roadway with sidewalks, lighting and landscaping, from its terminus just south of Mill Street, underneath the US-50 Pioneer Bridge, and terminates with a cul-de-sac to allow Riverfront Street to be extended
Newland Street Subgrade Repair
Location Newland Street and Ellis Avenue City or County Responsible for Project City of Fountain Valley Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description How would you like to reduce your total project cost and time of construction by 80%? That’s exactly what the innovative Public Works team at the City of Fountain Valley was able to achieve when they used a non standard approach to repair significant settlement of the number two lane, bike lane, curb & gutter and sidewalk that was caused by the 2023 California Rainstorms which produced widespread damage to public infrastructure. The standard repair method of removing damaged infrastructure, dewatering and excavating soil, recompacting soil, and replacement of infrastructure had a cost estimate of approximately $1,200,000. Due to a high-water table and recommended 10-foot-deep excavation, this traditional method would have had a lengthy construction schedule and created significant disruption to
North McDowell Blvd. Complete Streets Project
Location North McDowell Blvd. (from Old Redwood Highway to Sunrise Parkway) City or County Responsible for Project Petaluma Category Complete Streets Projects Description The City of Petaluma’s busiest arterial (over 20K vehicles daily) with the highest truck traffic (approaching 10%) is North McDowell Boulevard (NMD). Core business, industry, and residential hubs are located along the NMD project corridor. The Sonoma-Marin Area Rail Transit (SMART) track crosses NMD where the second Petaluma train station is under construction providing essential connectivity to the corridor and the community. Also, several transit bus lines run on NMD. Unfortunately, the NMD pavement was 50+ years old and crumbling (PCI 7 to 38; very poor/poor classification); speeding was a leading contributor to the 132 injury collisions that occurred between 2016 and 2020; gaps in the sidewalk abounded along with non-ADA compliant curb ramps; transit facilities were inadequate without safe pedestrian crossings; and there were either
Placentia Avenue and West 19th Street Active Transportation Improvements – Safety or Intelligent Transportation System Projects Application
Location Placentia Avenue and West 19th Street City or County Responsible for Project Costa Mesa, CA Category Safety or Intelligent Transportation System Projects Description The Westside of Costa Mesa is a high-density neighborhood of nearly 40,000 residents that has historically been recognized as one of the most disadvantaged communities in Orange County as defined by the USDOT Office of Management and Budget (OMB) and CalEnviroScreen. In addition to the disadvantaged nature of the neighborhood, the City’s Police Department data shows a disproportionate number of collisions in the community with an especially high number of collisions involving pedestrians and bicyclists. Recognizing this disparity, the City embarked on the development of the Placentia Avenue and West 19th Street Active Transportation Improvements Project which was a collaborative effort between the City and community members. The project that originally started as a street rehabilitation project for these two primary corridors in the Westside
Placentia Avenue and West 19th Street Active Transportation Improvements – Complete Streets Projects Application
Location Placentia Avenue and West 19th Street City or County Responsible for Project Costa Mesa, CA Category Complete Streets Projects Description The Westside of Costa Mesa is a high-density neighborhood of nearly 40,000 residents that has historically been recognized as one of the most disadvantaged communities in Orange County as defined by the USDOT Office of Management and Budget (OMB) and CalEnviroScreen. In addition to the disadvantaged nature of the neighborhood, the City’s Police Department data shows a disproportionate number of collisions in the community with an especially high number of collisions involving pedestrians and bicyclists. Recognizing this disparity, the City embarked on the development of the Placentia Avenue and West 19th Street Active Transportation Improvements Project which was a collaborative effort between the City and community members. The project that originally started as a street rehabilitation project for these two primary corridors in the Westside Cost Mesa neighborhood,
Placentia Avenue and West 19th Street Active Transportation Improvements
Location Placentia Avenue and West 19th Street City or County Responsible for Project Costa Mesa, CA Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Westside of Costa Mesa is a high-density neighborhood of nearly 40,000 residents that has historically been recognized as one of the most disadvantaged communities in Orange County as defined by the USDOT Office of Management and Budget (OMB) and CalEnviroScreen. In addition to the disadvantaged nature of the neighborhood, the City’s Police Department data shows a disproportionate number of collisions in the community with an especially high number of collisions involving pedestrians and bicyclists. Recognizing this disparity, the City embarked on the development of the Placentia Avenue and West 19th Street Active Transportation Improvements Project which was a collaborative effort between the City and community members. The project that originally started as a street rehabilitation project for these two primary
Howe Road Rehabilitation Project
Location Howe Road from Pacheco Boulevard to Vista Way, Martinez, CA City or County Responsible for Project City of Martinez Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Howe Road Rehabilitation Project utilized a combination of cold in-place recycling (CIR) and rubberized hot mix asphalt (RHMA) to sustainably and efficiently reconstruct 1.2 miles, or roughly 380,000 square feet, of this high-traffic truck route through the City of Martinez. The Project scope involved milling 2” of existing asphalt, cold-in place recycling a 3.5” section of existing asphalt, placing a 2” RHMA overlay, and striping new buffered bike lanes to increase bicycle use, convenience, safety. In addition, the City of Martinez partnered with the Recycling and Stabilizing Association of California (RSA) and our contractor MCK Services, Inc. to host a CIR Demonstration to promote education, innovation, and sustainability in the paving industry. The Demo involved an
Citywide Pavement Rehabilitation Program – Phases 1 and 2
Location City of Moreno Valley – Citywide City or County Responsible for Project City of Moreno Valley Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The City of Moreno Valley’s Citywide Pavement Rehabilitation Program – Phases 1 and 2 project, significantly improved road quality, safety, and access. This $50 million project was planned to be completed in a 10-year period but was completed in just 18 months, funded by the federal recovery act plans and the state gas tax under State Bill 1. The project addressed road conditions across 460 lane miles, using various rehabilitation and preservation strategies to mitigate accident risks including crack sealing, slurry sealing, localized repair through digging out and replacement, edge grinding and overlay, full grinding and overlay, and recyclable pavement fabric for soft subgrade areas. The project covered 1,006 street segments, identified through the Pavement Management System (PMS), which prioritizes
Garden Grove Complete Street Project
Location Garden Grove Boulevard, Edwards Street, Trask Avenue City or County Responsible for Project Westminster Category Complete Streets Projects Description The Garden Grove Complete Street Project installed approximately three miles of bicycle facilities in the City, on three arterial streets, in accordance with the City of Westminster’s General Plan, Mobility Element, and Active Transportation Plan. The project is intended to encourage using active modes of transportation, such as walking and biking, by installing a safe inter-connected pathway through the city. The segment includes a protected bikeway on Garden Grove Boulevard, from the State Route 22 on-ramp at Valley View Street to State Route 22 off-ramp at Goldenwest Street. These improvements included replacing a dirt path with a new beautifully landscaped median, new stamped concrete, illuminated pedestrian crosswalks, traffic signal modifications, and reducing the travel lanes from four to two, thereby reducing speed and creating a safer environment for bicyclists
US 101 / Blossom Hill Road Interchange Improvement
Location US 101 and Blossom Hill Road, San Jose, CA City or County Responsible for Project City of San Jose Category Complete Streets Projects Description OVERVIEW The locally funded $47 million US 101/Blossom Hill Road Interchange Improvement Project in San Jose widened an existing overcrossing from four lanes to seven lanes and installed a completely grade-separated Class I bicycle and pedestrian path through the interchange. Project improvements enhance safety for drivers, pedestrians, and cyclists; buffer nearby residences from noise; facilitate planned development in the area; and strengthen the regional trail network. The existing Blossom Hill Road Overcrossing was constructed many decades ago, and the surrounding area has changed significantly since then, adding many residential and commercial uses, including the Monterey Plaza shopping mall, Silver Creek Valley Place and recent iStar mixed use development. At the same time, traffic congestion has increased, and the existing overcrossing had not been constructed
Turlock Road over Dry Creek Scour Repair
Location Turlock Road and Oakdale Road, Merced County CA City or County Responsible for Project Merced County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description This bridge maintenance project corrected scour holes developing near the foundation of Turlock Road over Dry Creek Bridge and provided protection against further scour. Turlock road serves large amounts of agricultural industry in the region with both grower and processing plants in the area. Closure of the Turlock Road over Dry Creek bridge would have large financial impacts for these agricultural operations. The project also removed debris that had been washed down stream and was further degrading channel flow under the bridge and increasing scour activity. This project needed to be done extremely fast since dry creek is mainly runoff water with no way of controlling creek flows in the area. The project was completed just in time as flows
Gurr Road Intersection Reconstruction
Location Gurr Road at State Route 140 Merced County City or County Responsible for Project Merced County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description This intersection improvement project at Gurr Rd and SR 140 enhanced safety and traffic flow for motorists. The project replaced a bridge over the McSwain Lateral with a more efficient 72-inch pipe culvert, effectively managing water flow in the area. By widening the intersection, the project accommodated the frequent use of school buses for McSwain Union Elementary School and fire engines from Merced County Franklin/Beachwood/McSwain Fire Station 61 providing a safer and smoother driving experience for residents and visitors in the community. The project was well-organized, efficient, and adhered to established best practices in construction management. Including factors like project planning, resource allocation, and project monitoring to ensure the project stayed as close to schedule as possible and within budget.
Safe Streets for 17th Street and Michigan Avenue
Location 17th St from Wilshire Blvd to Pico Blvd; Michigan Ave from 14th St to 20th St City or County Responsible for Project Santa Monica, CA Category Complete Streets Projects Description Since the opening of the Metro Expo (E) Line in 2016, 17th Street has experienced a large increase in pedestrian and bicycle traffic. The Safe Streets for 17th Street and Michigan Avenue Project was designed to improve bike and pedestrian safety and promote sustainability to combat climate change. The 1.5-mile project features curb-protected bike lanes, with a section raised at sidewalk level, Dutch-style intersections, mini traffic circles, leading pedestrian intervals (LPIs), curb extensions, pedestrian scale lighting, a red-painted bus zone, and a newly resurfaced roadway. The project connects to the Metro E Line 17th St/SMC Station, Santa Monica College (SMC), the Expo bike path, Memorial Park, schools, bike lanes on Arizona Avenue and Broadway, and the Michigan Avenue
Annual Local/Residential Street Improvement Project (Phase I of Cycle 2)
Location Various streets in the City of Burbank City or County Responsible for Project Burbank Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Annual Local/Residential Street Improvement Project This project was the first phase of the 2nd cycle of the Citywide street resurfacing program. This phase improved local and residential streets with pavement conditions rated poor and below, in four of the City’s 20 maintenance zones. This was the largest street resurfacing project in the City’s history. With over 170 street segments or about 26.5 centerline miles (equivalent to the distance from downtown Burbank to Santa Monica Pier), and it also included removal and reconstruction of damaged curbs, gutters, sidewalks, driveways, and pedestrian ramps to comply with ADA requirements. Construction of this project called for the use of Asphalt Rubber Hot Mix (ARHM), which uses crumb rubber from recycled tires and diverted approximately 144,000 discarded
Fiber Optic Communication System Upgrade/Traffic Signal Coordination Project
Location Temecula Parkway (SR 79 S), Rancho California Road, Winchester Road (SR 79 N) City or County Responsible for Project City of Temecula Category Safety or Intelligent Transportation System Projects Description The project completed construction and installation of fiber optic communication systems including conduits, cables, closed circuit television (CCTV) cameras, traffic signal controllers, and related communication equipment to improve safety and operations on the corridors of Winchester Road, Rancho California Road, and Temecula Parkway. The new system provides consistent, reliable, and modern communications and controls which enables proactive traffic signal management and response to real time traffic conditions. In addition to the fiber communication upgrades, the project developed and implemented coordinated signal timing along the corridors. Ultimately the goal of the project was to improve public safety, shorten commute times, reduce greenhouse gas emission, and increase mobility for all modes of travel. Coordinated signal timing was developed and implemented
Green Tree Boulevard Extension
Location Hesperia Road & Ridgecrest Road City or County Responsible for Project City of Victorville Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description In collaboration with the Town of Apple Valley (“Town”) and County of San Bernardino (“County”), the City of Victorville (“City”) completed a multijurisdictional connectivity project providing a third alternate thoroughfare crossing the Burlington Northern Santa Fe Railroad and Mojave River bisecting the tri-community area. Termed the “Green Tree Boulevard Extension Project” (“Project”), it was the final phase in a three phased corridor project to join Yucca Loma Road in the Town to Yates Road in the County to Green Tree Boulevard in the City. Prior to Project completion, east-west movements across the railroad and river were limited to Hwy 18 and Bear Valley Road situated at the north and south ends of the City resulting in severe congestion, poor levels of service
Bear Valley Road Overhead at BNSF Widening Project
Location Bear Valley Road and Ridgecrest Road City or County Responsible for Project City of Victorville Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description Residents in the communities of the High Desert including the City of Victorville, Town of Apple Valley and unincorporated County of San Bernardino rely upon Interstate 15 through the Cajon Pass to access other Southern California cities for work, business, shopping or play. The Burlington Northern Santa Fe Railroad (BNSF) cuts across the City of Victorville, allowing limited access over the busiest railroad line in the western United States. Victorville residents east of the tracks along with all the residents of the Town of Apple Valley and County of San Bernardino were limited to two crossing points, Bear Valley Road and Highway 18 to reach Interstate 15 or businesses in Victorville when the project was proposed for improvement. These two crossings,