Bastanchury Road Widening Project
Location Bastanchury Road between Casa Loma Avenue and Eureka Avenue City or County Responsible for Project City of Yorba Linda Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Bastanchury Road Widening Project enhances mobility and safety for drivers, bicyclists, equestrians, and pedestrians by improving Bastanchury Road between Casa Loma Avenue and Eureka Avenue. The project adds a second through-lane in each direction, improves vertical line of sight, installs new traffic signals, and constructs a retaining wall. The project required cooperation between key stakeholders including Southern California Edison (SCE), Yorba Linda Water District, homeowners, and Shea Homes – the adjacent property developer. The Bastanchury Road project involved extensive utility coordination and stakeholder collaboration. The project required avoiding a Yorba Linda Water District trunk line and relocating SCE transmission lines, necessitating significant coordination efforts before and during construction. The City worked with homeowners whose properties were
Santa Rosa Road Bike Lane Project
Location Santa Rosa Road, unincorporated county area City or County Responsible for Project Ventura County Category Complete Streets Projects Description Ventura County Public Works Agency (VCPWA) Santa Rosa Rd Bike Lane Project (Project) Santa Rosa Road in the unincorporated county area is a two-lane regional corridor which connects all road users from the City of Camarillo to the City of Thousand Oaks/City of Moorpark. Existing conditions show no bike lanes or pedestrian walkways along most of the road segment. The Santa Rosa Rd Bike Lane Project (Project) constructed 3.4 miles of Class II buffered bike lanes and pedestrian improvements including 900 ft of new sidewalk, high visibility crosswalks, and curb ramps along Santa Rosa Road from Yucca Road to Moorpark Road to provide pedestrians with alternate modes of travel. A new accessible pedestrian walkway extends from the Hidden Meadows Estates community to the Santa Rosa Technology Magnet School. The
Pico Rivera Regional Bikeway Project – Nomination for Complete Streets Projects
Location The Project is located along Mines Avenue from Paramount Blvd to the San Gabriel River City or County Responsible for Project City of Pico Rivera Category Complete Streets Projects Description The Project is located along Mines Avenue from Paramount Boulevard (Rio Hondo Channel) to the San Gabriel River. The Project entails the construction and connection of a 1.1-mile protected bicycle lane that provides a connection to regional trails along the Rio Hondo Channel and San Gabriel River. In addition to the bicycle lane, improvements within the project limits include pavement reconstruction, construction of bioswales for stormwater capture along the newly installed medians protecting the bike lane, traffic signal modifications at the intersections of Paramount Boulevard at Mines Avenue and Rosemead Boulevard at Mines Avenue to accommodate safe lane turning/crossing for the newly installed bike path at each of the intersections, and signage and landscaping improvements. The Project utilized
South San Francisco’s Grand Avenue and Airport Boulevard Streetscape Improvement Project
Location Grand Avenue and Airport Boulevard City or County Responsible for Project City of South San Francisco Category Complete Streets Projects Description The Grand Avenue and Airport Boulevard Streetscape Improvement Project is a transformative initiative by the City of South San Francisco that directly supports the Save California Streets Program’s goals of safety, preservation, and sustainability. By improving pedestrian and bicycle accessibility, implementing modern safety measures, and integrating sustainable infrastructure, this project enhances mobility while ensuring long-term resilience in a high-traffic urban corridor. Approved by Caltrans and developed with input from the City’s Bicyclist and Pedestrian Advisory Commission (BPAC), the project embodies best practices in safe, multimodal, and sustainable transportation planning. Addressing a Critical Need Grand Avenue and Airport Boulevard intersection serve as a high-traffic corridor connecting South San Francisco Caltrain station with downtown. However, infrastructure gaps have posed accessibility and safety challenges for pedestrians and cyclists, increasing conflicts
Pico Rivera Regional Bikeway Project
Location The Project is located along Mines Avenue from Paramount Blvd to the San Gabriel River City or County Responsible for Project City of Pico Rivera Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Project is located along Mines Avenue from Paramount Boulevard (Rio Hondo Channel) to the San Gabriel River. The Project entails the construction and connection of a 1.1-mile protected bicycle lane that provides a connection to regional trails along the Rio Hondo Channel and San Gabriel River. In addition to the bicycle lane, improvements within the project limits include pavement reconstruction, construction of bioswales for stormwater capture along the newly installed medians protecting the bike lane, traffic signal modifications at the intersections of Paramount Boulevard at Mines Avenue and Rosemead Boulevard at Mines Avenue to accommodate safe lane turning/crossing for the newly installed bike path at each of the intersections, and
Arrow Highway Street Resurfacing and Highway Safety Improvement Project
Location Arrow Highway between Azusa Avenue and Citrus Avenue City or County Responsible for Project City of Azusa, City of Covina, and Los Angeles County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Arrow Highway is a heavily travelled arterial in the San Gabriel Valley which carries approximately 14,000 vehicles a day. This 1.1 mile segment of Arrow Highway is maintained primarily by the City of Azusa but also has segments that are maintained by the City of Covina and Los Angeles County Public Works. The City was able to obtain an HSIP Grant for the installation of raised medians to reduce collisions and provide refuge for pedestrians since there are only three (3) signalized intersections along this segment. Having secured this grant, the City took this as an opportunity to leverage other funding sources to make this a more complete project. Initially the project
Ferry to Bridge to Greenway Complete Streets Project
Location Harbour Way South, Hoffman Boulevard, and Cutting Boulevard City or County Responsible for Project City of Richmond Category Complete Streets Projects Description The Ferry to Bridge to Greenway Connector (F2B2G) Complete Streets Plan is a transformative initiative designed to enhance infrastructure, improve connectivity, and expand access to sustainable transportation. The plan connects the Richmond Ferry Terminal, Richmond-San Rafael (RSR) Bridge Trail, and Richmond Greenway, expanding multimodal networks across Contra Costa, Marin, and San Francisco Counties while reducing car use. A key driver behind F2B2G is the need for improved transportation options due to limited vehicle ownership. In the study area, 12% of households lack a vehicle, and 43% have access to only one; underscoring the need for safe, cost-effective transportation alternatives. The F2B2G project offers safe, reliable multimodal transit while reducing congestion and emissions. With $2 million in funding, Richmond built 2.25 miles of Class IV lanes along
West Foothill Boulevard Street Improvement Project
Location Foothill Boulevard, from Grove Avenue to San Bernardino Road City or County Responsible for Project City of Rancho Cucamonga Category Complete Streets Projects Description Foothill Boulevard in Rancho Cucamonga, California is a section of an invaluable piece of Americana known as Route 66. Throughout the west, it was known for its mid-century car culture, with iconic highway signage, motels, and service stations. Presently, Foothill Boulevard serves as the westerly gateway to the City, and the completion of improvements along Foothill Boulevard from Grove Avenue to San Bernardino Road has long been a priority for the community. In 2021 the City adopted its General Plan identifying upcoming priorities and goals for the next several years. Included is the goal of building on the history and significance of Foothill Boulevard by incorporating design features such as public art, signage, and architecture, that reflect the thoroughfare’s unique history and heritage. Simultaneously,
Avenue R Complete Streets & Safe Routes Project
Location Avenue R between Sierra Highway and 25th Street East City or County Responsible for Project City of Palmdale Category Complete Streets Projects Description The Avenue R Complete Streets and Safe Routes Project is a transformative public works initiative that exemplifies the City of Palmdale’s commitment to community safety, accessibility, and environmental sustainability. With a scope that includes sidewalk enhancements, traffic signal modifications, new bike lanes, and the installation of safety signage, this project aims to create a safer, more connected thoroughfare along Avenue R between Sierra Highway and 25th Street East. Project submitted by Name Krystal Hinojosa Job Title Analyst | Legislative Affairs Organization City of Palmdale Address 38300 Sierra Hwy., Suite A Palmdale, CA 93550 Email khinojosa@cityofpalmdaleca.gov Phone 661-267-5450
Connect Main Street Phases 1-3
Location Main St & Central Ave City or County Responsible for Project Lemon Grove Category Complete Streets Projects Description Connect Main Street is a seven-phased, active transportation, multi-modal corridor infrastructure project that enhances the interconnectivity of Lemon Grove. The project is centrally located in Lemon Grove and will be the backbone of a network where residents can access various areas in the city without the use of motor-vehicles. Main Street connects two MTS stations, City Hall, various churches, and places of work, and is closely located to multiple schools. The Connect Main Street Phases 1-3 project is being submitted for consideration for the Outstanding Local Streets and Roads Project Awards Program. Phases 1-2 and 3 is the section of Connect Main Street between Central Ave and Burnell Ave and Davidson Ave and Buena Vista Ave, respectively. Phase1-2 implemented a street conversion and Phase 3 included a road closure to
Elkhorn Boulevard Extension Project
Location Elkhorn Boulevard and Power Line Road City or County Responsible for Project Sacramento County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Elkhorn Boulevard Extension Project (Elkhorn Project) was a critical missing connection in the Sacramento, California region’s surface transportation network and is an essential component of a collaborative, multi-agency strategy known as the Capital Region Freight Improvement Project (CRFIP). The CRFIP’s purpose is to improve freight and passenger mobility, safety, and economic competitiveness in the surrounding rural area and the region at large, including improvements to Interstate 5. The Elkhorn Project and Sacramento International Airport (SMF) connection are adjacent to an industrial park, connects to State Route 99, provides a new entrance and exit to the airport, and reduces cargo and commuter traffic off heavily congested I-5. The project is also an enabling element for SMForward, which is Sacramento County Department of
Rumrill Boulevard Complete Streets Project
Location Rumrill Boulevard between the City Limit to San Pablo Avenue City or County Responsible for Project San Pablo – Contra Costa County Category Complete Streets Projects Description Rumrill Boulevard is a 1.6-mile vital corridor connecting Central Richmond and the Richmond Bay Area Rapid Transit (BART) station to key community destinations in San Pablo, including Contra Costa College. This corridor lacked appropriate pedestrian, bicycle, and stormwater infrastructure causing annual bike and pedestrian incidents and localized flooding. The Rumrill Boulevard Complete Streets Project (the Project) stemmed from a multi-year community-based planning and design process focused on creating a safe and friendly place for individuals and businesses by improving conditions for walking, bicycling, and transit. Community meetings determined pedestrian and bicycle safety as the primary goals, and the final design built on those community goals. Communication and responsiveness with the community continued during construction to support residents and businesses during this
Enterprise Street Rehabilitation Project – Aliso Viejo Parkway to Aliso Creek Road
Location Enterprise between Aliso Viejo Parkway to Aliso Creek Road City or County Responsible for Project City of Aliso Viejo Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description In the heart of Aliso Viejo, the Enterprise Street Rehabilitation Project marked a significant milestone in urban development. The stretch of road near Trader Joe’s, notorious for its poor condition, underwent a transformative process called full-depth reclamation. By recycling and reusing the existing materials in place, this method drastically reduced the need for trucking both export and import materials, and minimized the use of virgin resources. This innovative approach not only enhanced sustainability but also cut construction costs by approximately 30-40%, all while ensuring a robust 20-year design life. The remainder of the project focused on targeted interventions. Localized repairs were meticulously performed on specific areas of pavement failure, while a mill-and-overlay approach was applied to sections
Dry Creek Bridge Replacement on Burrough Valley Road
Location Burrough Valley Road just east of Tollhouse Road over Dry Creek City or County Responsible for Project County of Fresno Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description The Dry Creek Bridge Replacement project replaced a 98-year-old, 65-foot-long bridge on Burrough Valley Road approximately 2.5 miles south of the mountain community of Tollhouse, CA. The bridge, located at the T-intersection at Tollhouse Road and Burrough Valley Road, was functionally obsolete, hydraulically deficient, and could not pass the 100-year storm flow of Dry Creek. The replacement bridge needed to meet the Central Valley Flood Protection Board (CVFPB)’s hydraulic requirements of providing 2 feet of freeboard above the 100-year storm event. The replacement bridge design revised the road approach alignment that had a raised vertical profile and accommodated the CVFPB’s hydraulic requirements. This required elevating the profile of the nearby intersection and changing the geometrics to
Bear Valley Road Reconstruction Project
Location Amethyst Road to US Highway 395 City or County Responsible for Project City of Victorville Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Bear Valley Road is classified as a super arterial roadway on an east-west alignment that crosses the entire width of the City limits. As such, it experiences the highest-level of automobile traffic volume within the City, an average of 26,402 vehicles per day. Subsections of the road segment proposed for reconstruction and rehabilitation were constructed dating back to 1988. Over the past 35 years of service, some sections of pavement have been reconstructed, resurfaced, or widened as the City has developed. As part of the City’s Capital Improvements Program, a two-mile stretch of roadway on Bear Valley Road was selected to be reconstructed. This segment included distresses such as: alligator cracking, shoving, potholes, raveling and rutting which indicate the asphalt and
Middlefield Road Improvement Project
Location Middlefield Road from Pacific Avenue to Fifth Avenue City or County Responsible for Project County of San Mateo Department of Public Works Category Complete Streets Projects Description The Middlefield Road Improvement Project (Project) advances the roadway conditions, preservation, and sustainability goals of the Save California Street Program through roadway improvements, utility upgrades, and sustainable features. These enhancements improve roadway conditions, provide more accessibility, and create a vibrant neighborhood that meets both current and future community needs. Roadway condition Enhancements: The Project reconfigures the roadway from four lanes to three, including a center turn lane, reducing traffic conflicts, improving visibility, and fostering an improved driving environment. Pedestrian and cyclist comfort is prioritized through wider sidewalks, dedicated bike lanes, and solar-powered Rectangular Rapid Flashing Beacons (RRFBs) at crossings. A new traffic signal system, integrated with updated railroad signals at the County Health Clinic/Redwood Junction driveway, will improve traffic flow, reduce
Complete Streets: Downtown Burbank San Fernando Boulevard Reconfiguration, Phase 1
Location San Fernando Boulevard, between Olive Avenue and Magnolia Boulevard City or County Responsible for Project Burbank, CA Category Complete Streets Projects Description Outstanding Local Streets and Roads Project Awards Program – City of Burbank Downtown Burbank San Fernando Boulevard Reconfiguration, Phase 1 Project • The entry directly improves the preservation, safety, access to, and overall quality of the local street and road system (up to 5 points) The Downtown Burbank San Fernando Boulevard Reconfiguration, Phase 1 (Project), was designed with the express purpose of improving the safety, access, and overall quality of the local street and road system in Downtown Burbank. As a key component of Burbank’s Complete Our Streets Plan (adopted in 2020), the Project was implemented as a short-term priority to address the critical need for enhanced safety and multimodal access in one of the city’s most active corridors. The Project focused on a 12-month pilot
Downtown Burbank San Fernando Boulevard Reconfiguration, Phase 1
Location San Fernando Boulevard, between Olive Avenue and Magnolia Boulevard City or County Responsible for Project City of Burbank Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Outstanding Local Streets and Roads Project Awards Program – City of Burbank Downtown Burbank San Fernando Boulevard Reconfiguration, Phase 1 Project • The entry directly improves the preservation, safety, access to, and overall quality of the local street and road system (up to 5 points) The Downtown Burbank San Fernando Boulevard Reconfiguration, Phase 1 (Project), was designed with the express purpose of improving the safety, access, and overall quality of the local street and road system in Downtown Burbank. As a key component of Burbank’s Complete Our Streets Plan (adopted in 2020), the Project was implemented as a short-term priority to address the critical need for enhanced safety and multimodal access in one of the city’s most active
Artesia Great Boulevard Project
Location Artesia Boulevard between Harbor Avenue/Susanna Road to Downey Avenue, Long Beach, CA City or County Responsible for Project City of Long Beach Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Artesia Great Boulevard Project is a transformative 3.2-mile corridor improvement initiative designed to enhance safety, preservation, and sustainability in alignment with the goals of the Save California Streets Program. Spanning from Harbor Avenue/Susanna Road to Downey Avenue, the project integrates comprehensive roadway improvements, advanced traffic management systems, and sustainable urban design to create a safer, more accessible, and environmentally resilient corridor. Key safety features include six new stamped, colored concrete crosswalks, Class IV bike lanes, traffic signals at four new intersections, additional pedestrian street lighting, upgraded ADA curb ramps, and 19 bus stops with upgraded platform accessibility, improving multimodal travel for pedestrians, cyclists, and transit users. Additionally, installing Intelligent Transportation System (ITS) technology,
20th Street Bike and Pedestrian Connection Project
Location 20th Street and Michigan Avenue City or County Responsible for Project City of Santa Monica Category Complete Streets Projects Description In the mid-1960s, the construction of the Santa Monica Freeway (I-10) divided Michigan Avenue and displaced over 1,500 residents in the Pico Neighborhood. The 20th Street Bike and Pedestrian Connection Project is a critical link that reconnects Michigan Avenue for pedestrians and cyclists over the I-10 Freeway. This project sets the stage for the final phase of Michigan Avenue Neighborhood Greenway Plan (approved by the Santa Monica City Council in 2014) that will ultimately link the greenway to the Bergamot Arts Center and Bergamot Expo Line train station. The Michigan Avenue Neighborhood Greenway (MANGo) offers a safe and pleasant space for the community, promoting walking, biking, and social interaction. MANGo’s traffic calming features aim to reduce heavy traffic volumes and speeding while connecting important destinations like Santa Monica
Benton Way Pavement Rehabilitation Project
Location Benton Way from Wetlands Edge Road to Elliott Drive City or County Responsible for Project City of American Canyon Public Works Engineering Division Category Complete Streets Projects Description The Benton Way Pavement Rehabilitation Project, designed and managed entirely by City staff, exemplifies how infrastructure improvements can transform a vital community corridor into a safer, more accessible space. This comprehensive project spans approximately 2,000 linear feet along Benton Way from Wetlands Edge Road to Elliot Drive, serving essential community facilities including American Canyon Middle School, Phillip West Aquatics Center and the Boys & Girls Club of Napa Valley. The project addressed multiple critical needs through innovative design and implementation. The previously existing roadway, originally designed for a Traffic Index (TI) of 5.0 or less, was inadequate for current traffic demands. The roadway showed signs of alligator cracking, base failure and several trench cuts from previous utility repairs, resulting in
Convoy Street Paving Project/GJ 1042
Location Convoy Street City or County Responsible for Project City of San Diego Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Convoy Street Paving Project includes overlaying approximately 3.4 miles of existing roadway with asphalt concrete pavement and performing subgrade repairs. This project also includes replacement of sidewalks with ADA compliant sidewalks and curb ramps. Replacement of damaged cross gutters, and restriping is also included. Class IV separated bike lanes are part of this scope to enhance mobility and safety. The project extends along Convoy Street from SR 52 to Kearny Mesa Road/Ostrow Street. This project achieves safety, preservation and sustainability. Project submitted by Name Shadi Sami Job Title Deputy Director Organization Engineering & Capital Projects Department, City of San Diego Address 525 B Street Email shadis@sandiego.gov Phone (619) 980-0008
Cañada Road Pavement Preservation Project
Location Cañada Road in Unincorporated San Mateo County, CA City or County Responsible for Project County of San Mateo Department of Public Works Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Cañada Road is a collector road located in the heart of San Mateo County (County) which spans 7.4 miles, renowned for its scenic mountain views and picturesque vistas of the lower Crystal Springs Reservoir. Connecting CA-92 in the north to the Town of Woodside in the south, it serves as an alternative route to I-280 and is a popular destination for cyclists seeking a scenic and recreational ride. The Cañada Road Pavement Preservation Project (Project) scope of work included pavement repairs, micro-surfacing, striping, and new roadside traffic sign installation for the unincorporated section of Cañada Road which is approximately 5.5 miles in length. The Project has two main objectives, the first one being to
The Wardrobe Avenue Life Extension Project for Merced County
Location Merced County: Various Locations along Wardrobe Avenue City or County Responsible for Project Merced County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The County of Merced (the “County”), in cooperation with Santa Fe Aggregates, completed a pilot project on Wardrobe Avenue to evaluate the performance of fiber-reinforced hot mix asphalt (HMA). This initiative, studied by Surface Tech and the University of California Pavement Research Department, involved a ¾-inch HMA overlay on two miles of roadway, with aramid fibers added to reinforce the mix. The project was funded by local Measure V funds and was combined with a restoration and repair project for a small timber bridge on Wardrobe Ave for a complete two-mile stretch on reconstructed and repaired roadway. Rather than fully reconstructing the road, the County opted for a cost-effective preservation approach. The fiber-reinforced HMA mix was chosen to test its longevity
Asphalt Concrete (AC) Overlay 2200
Location Balboa Ave. and Clairemont Mesa Blvd. from SR 163 to I 805 City or County Responsible for Project City of San Diego Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The scope of this project includes grinding, cold milling, hauling, safe disposal of existing asphalt and concrete, excavation of approximately 7.23 miles for pavement base repair and installation of new reliable pavement. This project also includes speed hump removal and replacement, raising survey monuments to grade, installation of curb ramps to meet ADA requirements, sidewalk panel removal and replacement, curb and gutter removal and replacement, installing new bus pads, removal and replacement of commercial driveways, relocation of pedestrian push buttons, installation of pedestrian barricades, replacing traffic striping, installing new bike lanes, replacing vehicle detector loops and stubs, and other improvements. This project’s improvements listed above improve safety (improved pavement, visible striping, pedestrian push buttons,
Towne Avenue Complete Streets Project
Location Foothill Boulevard and Base Line Road City or County Responsible for Project City of Claremont Category Complete Streets Projects Description The Towne Avenue Complete Streets Project reflects the City of Claremont’s commitment to maintain roadway infrastructure incorporating complete streets elements following the City’s Complete Streets Policy. The Towne Avenue Pavement Condition Index (PCI) of 44 prompted scheduled maintenance for the corridor, between Foothill Boulevard and Base Line Road. As part of the design process, staff used the City’s Complete Streets Policy to assess potential active transportation improvements that could be incorporated to the maintenance project to upgrade the outdated, car-centric corridor. While incorporating community feedback, the complete streets project was designed following sustainability practices, incorporating active transportation elements such as Class II and IV bike lanes, pedestrian bulb outs (curb extensions), American with Disabilities Act (ADA) ramps, median landscaping improvements, pedestrian lighting, traffic signal modifications, monument entry signs,
Duncan Road & Comstock Road Roundabout
Location San Joaquin County City or County Responsible for Project San Joaquin County Category Complete Streets Projects Description The Duncan Road-Comstock Road Roundabout Project comprises the construction of a single-lane rural roundabout in the community of Linden, east of Stockton. This project was funded with Highway Safety Improvement Program (HSIP) and local Measure K Local Street Repair funds. HSIP is a competitive program with the goal of reducing traffic fatalities and serious injuries. This project is the first in San Joaquin County to construct a roundabout in a mainly rural agricultural area. Prior to the project being programmed, several injury-related vehicle collisions were recorded at or near the Duncan Road and Comstock Road intersection, prompting action to reduce collision frequency and severity. The project enhances safety for motorists by replacing the partial stop-controlled intersection with a roundabout, thereby providing better traffic operations and reducing the number of conflicting movements.
Pershing Avenue Improvements Project
Location Meadow Avenue to Thornton Road City or County Responsible for Project San Joaquin County Category Complete Streets Projects Description A critical north-south corridor, Pershing Avenue serves nearly 18,000 vehicles per day. The portions of Pershing Avenue located an unincorporated portion of San Joaquin County are lined by low-density residential land uses. This unincorporated island is surrounded by the City of Stockton. Given the significance of this corridor, the City of Stockton previously widened their segments to include a four-lane facility that would accommodate anticipated traffic increases and operational needs. For years, the two-lane facility within the unincorporated County experienced significant congestion. Prior to widening the roadway, San Joaquin County commissioned a study to engage the community in the process of determining the most appropriate improvements. The resulting Pershing Avenue Improvement Project provides a balanced and progressive approach to addressing traffic operational needs while preserving the residential nature of
Vincent Community Bikeways Project
Location Various locations including Class I, off-street bike paths along the Big Dalton Wash, between Irwindale Ave and Lark Ellen Ave and between Arrow Hwy and Citrus Ave, Class II, on-street, bike lanes along Irwindale Ave (between Badillo St. and the Big Dalton Wash), and Class IV, protected bike lanes along Lark Ellen Ave (between Bellbrook St. and Arrow Hwy) and Arrow Hwy (between Lark Ellen Ave and Azusa Ave.) See attached location map (Figure 1). City or County Responsible for Project Cities of Azusa, West Covina, and unincorporated Los Angeles County (Vincent Community) Category Complete Streets Projects Description The Vincent Community Bikeways Project constructed 4.5 miles of new on-road bikeways and off-road shared-use paths to promote active and alternative modes of transportation and recreation. This includes facilities along Irwindale Avenue, Arrow Highway, Lark Ellen Avenue, and the Big Dalton Wash (Figure 1). Other improvements include high-visibility crosswalks, wayfinding
2024 City of Elk Grove Surface Treatment Project (WPR024)
Location City Wide City or County Responsible for Project City of Elk Grove Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The City of Elk Grove’s pavement maintenance program consists of four main treatments. Slurry Seal, Micro-Surfacing, Cape Seal and full Overlay. The City’s main objective is to identify the correct treatment for each street to achieve pavement preservation, increase safety, and enhance public access while maintaining a cost-effective mythology. The City utilizes StreetSaver and a Decision Tree of treatments to begin the planning process, but all streets are reviewed in the field by City staff before the final treatment has been decided. The City has divided the road network into 113 subzones. This allows the City plan treatments by subzone to help reduce project costs, while reducing the repeated impacts to neighborhoods. The City has 5-yr streets plan that is update annually. The City
Oak View Streetscape Improvements
Location Oak View Neighborhood, Huntington Beach, Orange County, California City or County Responsible for Project City of Huntington Beach Category Complete Streets Projects Description The Oak View Streetscape Improvement Project transformed a 15-block underserved neighborhood in Huntington Beach into a safer, greener, and more connected community. Guided by complete streets principles, the project addressed pedestrian safety, environmental sustainability, and community identity, making the area more accessible and welcoming for residents. Specific pedestrian enhancements included ADA-compliant sidewalks, bulb-outs to reduce crossing distances and calm traffic, trip hazard removal, wayfinding signage, and improved lighting. These elements enhanced safety and created a seamless and enjoyable pedestrian experience, especially for students walking to Oak View Elementary School. The project’s scope went beyond infrastructure improvements to incorporate artistic and cultural elements that reflect the community’s identity. Features such as artistic crosswalks, monument signs, and intersection murals contributed to a sense of place and pride
Danville Boulevard – Orchard Court Complete Streets Improvement Project
Location Danville Boulevard and Orchard Court, Alamo, CA City or County Responsible for Project Contra Costa County Category Complete Streets Projects Description Danville Boulevard is a heavily traveled key roadway in the community of Alamo, located in Contra Costa County. Stretching through the heart of Alamo, the roadway is a major arterial route connecting the town to nearby communities, including Walnut Creek and Danville. Lined with a mix of residential, commercial, and recreational areas, it plays a central role in local and regional traffic circulation and commerce. As the first of its kind in not only the Alamo community, but also in unincorporated Contra Costa County, the Danville Boulevard – Orchard Court Complete Streets Improvement Project, also known as the Alamo Roundabout, was conceived to address traffic challenges at the intersection to promote safer navigation for vehicles, cyclists, and pedestrians and promote all modes of transportation. Prior to this
Sierra Avenue Widening Project
Location Sierra Avenue, from Foothill Boulevard to Baseline Avenue City or County Responsible for Project City of Fontana Category Complete Streets Projects Description The Sierra Avenue Widening Project is a transformative infrastructure initiative designed to improve traffic flow, enhance safety, and accommodate the growing demands of Fontana’s rapidly developing community. This project focuses on expanding a critical segment of Sierra Avenue, one of the city’s major arterial roadways, to ensure smoother connectivity and better access to local businesses, schools, and residential areas. Improvements provided and enhanced multiple transportation options to residents, schools, and businesses along Sierra Avenue. Key components of the project include widening the roadway to add additional travel lanes, constructing new sidewalks and bike lanes to promote multimodal transportation, upgrading traffic signals to enhance operational efficiency, and implementing modern stormwater drainage systems to improve flood control. These enhancements aim to not only reduce traffic congestion but also
Santa Claus Lane Bikepath
Location Between Santa Claus Lane in the county of Santa Barbra and Carpinteria Avenue off Ramp in the city of Carpinteria City or County Responsible for Project Santa Barbara County Association of Governments Category Complete Streets Projects Description Project construction began September 6, 2022, and was complete on November 2, 2023. The path was temporarily opened from Memorial Day through Labor Day to allow the community use of the path during the summer months while the safety railings were completed. Final installation of the safety railing and landscaping were completed after the Labor Day holiday. Project Summary The new 0.8 mile, Class I bikeway and multipurpose path connects Santa Claus Lane to Carpinteria Avenue and provides a crucial link as part of the California Coastal Trail network. The $12.5M concrete Santa Claus Lane Class 1 Bike Path runs adjacent to the southbound lanes of US 101 between Estero Street
El Cajon Boulevard and Jessie Avenue Safety Improvements
Location Intersection of El Cajon Boulevard and Jessie Avenue City or County Responsible for Project City of La Mesa Category Safety or Intelligent Transportation System Projects Description The City of La Mesa values and seeks to accommodate a variety of transit options, and protect our most vulnerable roadway users. One of the La Mesa’s latest projects is the El Cajon Boulevard and Jessie Avenue Safety Improvements Project with the aim of improving pedestrian safety and mobility on a major thoroughfare. The project’s main feature includes the installation of the City of La Mesa’s first HAWK (High-intensity Activated Crosswalk), a special signal which lies dormant until a pedestrian activates it to cross the street. The HAWK incorporates Accessible Pedestrian Signal equipment into its design, announcing the crossing phase with an audible message and vibrating arrow button. The addition of this signal to the intersection provides proper facilities for pedestrians while
Innovative Speed Cushions
Location Plumeria Lane (west of Kitching Street) City or County Responsible for Project City of Moreno Valley Category Safety or Intelligent Transportation System Projects Description Safety and efficiency are key elements in transportation planning and design. One element in roadway design that has become problematic in recent years is the high rate of speed vehicles travel. Motorist speed and driving habits have become a vital component when planning communities today. Technology such as mobile devices have inadvertently contributed to an increase of motorists utilizing residential neighborhoods to save time and avoid traffic through the use of traffic assisted applications. This new form of travel has led to higher speeds and increased traffic on local roads designed for lower speeds and traffic volumes. In addition, the increased speeds and traffic volume create dangerous conditions around elementary schools and in residential communities. Motorist driving habits present a challenge for the City.
Castaic-Hasley Hills South
Location Unincorporated Castaic City or County Responsible for Project Los Angeles County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Los Angeles County Public Works (Public Works) has utilized sustainable pavement treatments for street improvements with outstanding success and continues its commitment to preserving and improving the quality of its roads in a cost-effective and environmentally responsible way. California Mandate AB32, a state law requiring the reduction of greenhouse gas (GHG) emissions and a limited budget were the key motivators for developing our sustainable approach that emphasized (1) focusing on preserving roads in good conditions, (2) using recycled materials in pavement treatments, and (3) reutilizing materials in-place during construction. The Castaic–Hasley Hills South Project (Project), completed in August 2024, showcases the benefits of this sustainable approach. This project was funded with Road Maintenance and Rehabilitation Account (RMRA) funds. The pavement conditions of nearly 5.8 centerline
The Citywide Green Streets Project – Phase I
Location Las Virgenes Road (between Mont Calabasas Road and terminus of Las Virgenes Road) City or County Responsible for Project City of Calabasas Category Complete Streets Projects Description The City of Calabasas is dedicated to environmental sustainability and has taken a proactive approach through the Public Works Department. One of the City’s flagship initiatives is the Citywide Green Streets Project. In 2015, the Calabasas City Council adopted a resolution to fully support and promote the Green Street Policy for public and private development. This policy focuses on incorporating Low-Impact Development (LID) strategies that mitigate stormwater runoff, reduce pollutant loadings, and minimize erosion and hydrologic impacts on the natural drainage system. These efforts aim to enhance water quality and promote a sustainable urban environment. The Citywide Green Streets Project – Phase I, completed in October 2024, included the redesign of an unpaved portion of Las Virgenes Road, integrating a vegetated
Avenue 25 Bridge Replacement at Ash Slough
Location The Avenue 25 Bridge Replacement project is in Madera County Supervisorial District 2, approximately 0.5 miles west of Road 13 in northwest Madera County City or County Responsible for Project Madera County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description The Avenue 25 Bridge Replacement at Ash Slough Project creek exemplifies innovative and sustainable practices in bridge construction. Federally funded through HBP funds, this $4.5 million project involved replacing a structurally deficient 343-foot, 16-span continuous cast-in-place reinforced concrete slab bridge with a more durable, sustainable 320-foot, 9-span CIP reinforced concrete slab bridge. The project utilized several features to reduce material, increase flexibility, and increase efficiency. Pipe pin connectors were used to connect the Superstructure and Substructure. This eliminated the need for drop caps and minimizes stress on the foundation during seismic events. This feature minimizes the foundation size and increases the speed of falsework
ARPA Road Rehabilitation Project
Location Merced County: Various Locations City or County Responsible for Project Merced County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The ARPA Road Rehabilitation Project for the County of Merced was a $13 million initiative aimed at improving over 45 miles of county roadways, enhancing both their safety and sustainability. Funded by the federal, state, and local funds, this project encompassed critical road reconstruction and overlay work across all five Board of Supervisors districts. With a focus on efficient resource use and quality construction techniques, this project displayed sustainability, safety, and cost-effectiveness in road maintenance. The project employed several preservation methods that not only improved pavement conditions but also utilized quality engineering and materials. The scope included road dig-outs, cross-slope corrections, restoring positive drainage, and establishing roadside ditches, all designed to extend the life of the roadways. Additionally, the project involved the application of
Road 200 Bridge Replacement at Fine Gold Creek
Location Along Road 200 over Fine Gold Creek in Madera County City or County Responsible for Project Madera County Category Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects Description The Road 200 Bridge Replacement at Fine Gold Creek project is a prime example of sustainable, efficient engineering aimed at preserving infrastructure, enhancing safety, and promoting environmental responsibility. This $10,000,000 project replaced a 75-year-old outdated bridge with a new superstructure, a three-span cast-in-place post-tensioned box girder bridge, designed for durability and minimal future maintenance. This new superstructure, approximately 385 feet long and 5 feet 6 inches deep, is supported by 66-inch diameter columns resting on 12-foot by 12-foot footings built into the bedrock. In addition to the bridge replacement, the project also involved the realignment and upgrade of a third of a mile of roadway, improving both vertical and horizontal curvature to meet current standards. These enhancements have