Bastanchury Road Widening Project

 

Location

Bastanchury Road between Casa Loma Avenue and Eureka Avenue

City or County Responsible for Project

City of Yorba Linda

Category

Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects.

Description

The Bastanchury Road Widening Project enhances mobility and safety for drivers, bicyclists, equestrians, and pedestrians by improving Bastanchury Road between Casa Loma Avenue and Eureka Avenue. The project adds a second through-lane in each direction, improves vertical line of sight, installs new traffic signals, and constructs a retaining wall. The project required cooperation between key stakeholders including Southern California Edison (SCE), Yorba Linda Water District, homeowners, and Shea Homes – the adjacent property developer.

The Bastanchury Road project involved extensive utility coordination and stakeholder collaboration. The project required avoiding a Yorba Linda Water District trunk line and relocating SCE transmission lines, necessitating significant coordination efforts before and during construction. The City worked with homeowners whose properties were affected by the retaining wall to modify design plans to individual needs and coordinated with the adjacent development project.

The project required thoughtful and strategic traffic and construction staging, as it impacted a busy corridor serving as a primary arterial. Traffic was allowed through the corridor throughout construction to avoid obstructing local businesses, residential access, and emergency services. Early challenges from one of the worst rain events in several decades in California caused delays but were managed by the City, design consultants, and construction team to keep the project moving forward. The project design was adjusted to avoid impacts to several oil lines in the area.

Residents and commuters now experience smoother driving with added lanes and improved road design. Enhancements include better traffic flow, updated signage, new traffic signals and clearly marked bike lanes and pedestrian walkways. The project included reconstructing an equestrian trail with push buttons designed for seated riders, preserving a unique aspect of the Yorba Linda community that merges urban and rural lifestyles centered on its equestrian heritage. Additionally, the addition of the new traffic signals and signal interconnect enables synchronization of the corridor which ultimately translates into improved traffic flow and reduced carbon emissions.