Category: Award Winners for 2025 (complete-honorable)

Read more

Artesia Great Boulevard Project

  Location Artesia Boulevard between Harbor Avenue/Susanna Road to Downey Avenue, Long Beach, CA City or County Responsible for Project City of Long Beach Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Artesia Great Boulevard Project is a transformative 3.2-mile corridor improvement initiative designed to enhance safety, preservation, and sustainability in alignment with the goals of the Save California Streets Program. Spanning from Harbor Avenue/Susanna Road to Downey Avenue, the project integrates comprehensive roadway improvements, advanced traffic management systems, and sustainable urban design to create a safer, more accessible, and environmentally resilient corridor. Key safety features include six new stamped, colored concrete crosswalks, Class IV bike lanes, traffic signals at four new intersections, additional pedestrian street lighting, upgraded ADA curb ramps, and 19 bus stops with upgraded platform accessibility, improving multimodal travel for pedestrians, cyclists, and transit users. Additionally, installing Intelligent Transportation System (ITS) technology, […]

Read more

Benton Way Pavement Rehabilitation Project

  Location Benton Way from Wetlands Edge Road to Elliott Drive City or County Responsible for Project City of American Canyon Public Works Engineering Division Category Complete Streets Projects Description The Benton Way Pavement Rehabilitation Project, designed and managed entirely by City staff, exemplifies how infrastructure improvements can transform a vital community corridor into a safer, more accessible space. This comprehensive project spans approximately 2,000 linear feet along Benton Way from Wetlands Edge Road to Elliot Drive, serving essential community facilities including American Canyon Middle School, Phillip West Aquatics Center and the Boys & Girls Club of Napa Valley. The project addressed multiple critical needs through innovative design and implementation. The previously existing roadway, originally designed for a Traffic Index (TI) of 5.0 or less, was inadequate for current traffic demands. The roadway showed signs of alligator cracking, base failure and several trench cuts from previous utility repairs, resulting in […]

Account details will be confirmed via email.