Category: Award Winners 2026 (roads-honorable)

Read more

Pleasant Grove Boulevard Widening Project

  Location Pleasant Grove Boulevard between Foothills Boulevard and Woodcreek Oaks Boulevard City or County Responsible for Project City of Roseville Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Urban arterial roadways must balance long-term mobility needs with fiscal responsibility, environmental stewardship, and constructability. Pleasant Grove Boulevard in Roseville, California, exemplifies how early planning, adaptive engineering, and coordinated infrastructure investment can produce a sustainable and efficient transportation corridor. From its original conception in the late 1980s through its most recent widening completed in 2025, the roadway’s evolution demonstrates how foresight and resource-conscious decision-making can minimize waste, reduce lifecycle costs, and extend infrastructure service life while accommodating growth. Pleasant Grove Boulevard is a multi-lane arterial that provides a critical east–west connection between West Roseville, State Route 65, and the City of Rocklin. Along its length, the roadway varies between four and six travel lanes, reflecting both historic […]

Read more

Rancho Del Mar Pavement and Utility Improvements Project

  Location Rancho Del Mar subdivision, American Canyon City or County Responsible for Project City of American Canyon Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Rancho Del Mar Paving and Utility Improvements Project revitalized one of American Canyon’s oldest neighborhoods, originally developed in the 1950s. Decades of deferred maintenance had left streets in poor condition and water and sewer systems outdated, creating challenges for safety, accessibility, and long-term infrastructure reliability. This project addressed these needs comprehensively, transforming the neighborhood’s streets while setting a model for sustainable, cost-effective infrastructure rehabilitation. The project’s approach combined innovation and sustainability. On Rio Del Mar, 2,395 linear feet of roadway underwent Full-Depth Reclamation with Cement (FDR-C), recycling 100% of the existing asphalt and base course in place. This method reduced landfill waste, conserved natural resources, and lowered the project’s carbon footprint compared to traditional “remove and replace” techniques. In […]

Read more

Pedestrian Gap Improvement (Sunset Road)

  Location Sunset Road – Borrego Springs City or County Responsible for Project County of San Diego Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Borrego Springs Gap Improvement Project focused on enhancing pedestrian mobility and infrastructure within the community. Key components of the project included: •Construction of 14 pedestrian ramps to improve accessibility. •Installation of 1,866 feet of sidewalk to create a safer pedestrian pathway. •Development of 63 feet of driveway across three locations. •Reconstruction and improvement of two roundabout islands, including enhanced vegetation. •Paving and striping on Palm Canyon Drive to improve roadway conditions in front of businesses. •Installation of curb and gutter to enhance drainage and mitigate water runoff issues. •Addition of 10 shade structures along Sunset Road, improving comfort for pedestrians. •Placement of flashing beacons to enhance pedestrian safety and visibility. The Borrego Springs Gap Improvement Project delivered significant enhancements, including: […]

Account details will be confirmed via email.