Category: Local Project Listing 2025

Read more

Bastanchury Road Widening Project

  Location Bastanchury Road between Casa Loma Avenue and Eureka Avenue City or County Responsible for Project City of Yorba Linda Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Bastanchury Road Widening Project enhances mobility and safety for drivers, bicyclists, equestrians, and pedestrians by improving Bastanchury Road between Casa Loma Avenue and Eureka Avenue. The project adds a second through-lane in each direction, improves vertical line of sight, installs new traffic signals, and constructs a retaining wall. The project required cooperation between key stakeholders including Southern California Edison (SCE), Yorba Linda Water District, homeowners, and Shea Homes – the adjacent property developer. The Bastanchury Road project involved extensive utility coordination and stakeholder collaboration. The project required avoiding a Yorba Linda Water District trunk line and relocating SCE transmission lines, necessitating significant coordination efforts before and during construction. The City worked with homeowners whose properties were […]

Read more

Santa Rosa Road Bike Lane Project

  Location Santa Rosa Road, unincorporated county area City or County Responsible for Project Ventura County Category Complete Streets Projects Description Ventura County Public Works Agency (VCPWA) Santa Rosa Rd Bike Lane Project (Project) Santa Rosa Road in the unincorporated county area is a two-lane regional corridor which connects all road users from the City of Camarillo to the City of Thousand Oaks/City of Moorpark. Existing conditions show no bike lanes or pedestrian walkways along most of the road segment. The Santa Rosa Rd Bike Lane Project (Project) constructed 3.4 miles of Class II buffered bike lanes and pedestrian improvements including 900 ft of new sidewalk, high visibility crosswalks, and curb ramps along Santa Rosa Road from Yucca Road to Moorpark Road to provide pedestrians with alternate modes of travel. A new accessible pedestrian walkway extends from the Hidden Meadows Estates community to the Santa Rosa Technology Magnet School. The […]

Read more

Pico Rivera Regional Bikeway Project – Nomination for Complete Streets Projects

  Location The Project is located along Mines Avenue from Paramount Blvd to the San Gabriel River City or County Responsible for Project City of Pico Rivera Category Complete Streets Projects Description The Project is located along Mines Avenue from Paramount Boulevard (Rio Hondo Channel) to the San Gabriel River. The Project entails the construction and connection of a 1.1-mile protected bicycle lane that provides a connection to regional trails along the Rio Hondo Channel and San Gabriel River. In addition to the bicycle lane, improvements within the project limits include pavement reconstruction, construction of bioswales for stormwater capture along the newly installed medians protecting the bike lane, traffic signal modifications at the intersections of Paramount Boulevard at Mines Avenue and Rosemead Boulevard at Mines Avenue to accommodate safe lane turning/crossing for the newly installed bike path at each of the intersections, and signage and landscaping improvements. The Project utilized […]

Read more

South San Francisco’s Grand Avenue and Airport Boulevard Streetscape Improvement Project

  Location Grand Avenue and Airport Boulevard City or County Responsible for Project City of South San Francisco Category Complete Streets Projects Description The Grand Avenue and Airport Boulevard Streetscape Improvement Project is a transformative initiative by the City of South San Francisco that directly supports the Save California Streets Program’s goals of safety, preservation, and sustainability. By improving pedestrian and bicycle accessibility, implementing modern safety measures, and integrating sustainable infrastructure, this project enhances mobility while ensuring long-term resilience in a high-traffic urban corridor. Approved by Caltrans and developed with input from the City’s Bicyclist and Pedestrian Advisory Commission (BPAC), the project embodies best practices in safe, multimodal, and sustainable transportation planning. Addressing a Critical Need Grand Avenue and Airport Boulevard intersection serve as a high-traffic corridor connecting South San Francisco Caltrain station with downtown. However, infrastructure gaps have posed accessibility and safety challenges for pedestrians and cyclists, increasing conflicts […]

Read more

Pico Rivera Regional Bikeway Project

  Location The Project is located along Mines Avenue from Paramount Blvd to the San Gabriel River City or County Responsible for Project City of Pico Rivera Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description The Project is located along Mines Avenue from Paramount Boulevard (Rio Hondo Channel) to the San Gabriel River. The Project entails the construction and connection of a 1.1-mile protected bicycle lane that provides a connection to regional trails along the Rio Hondo Channel and San Gabriel River. In addition to the bicycle lane, improvements within the project limits include pavement reconstruction, construction of bioswales for stormwater capture along the newly installed medians protecting the bike lane, traffic signal modifications at the intersections of Paramount Boulevard at Mines Avenue and Rosemead Boulevard at Mines Avenue to accommodate safe lane turning/crossing for the newly installed bike path at each of the intersections, and […]

Read more

Arrow Highway Street Resurfacing and Highway Safety Improvement Project

  Location Arrow Highway between Azusa Avenue and Citrus Avenue City or County Responsible for Project City of Azusa, City of Covina, and Los Angeles County Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Description Arrow Highway is a heavily travelled arterial in the San Gabriel Valley which carries approximately 14,000 vehicles a day. This 1.1 mile segment of Arrow Highway is maintained primarily by the City of Azusa but also has segments that are maintained by the City of Covina and Los Angeles County Public Works. The City was able to obtain an HSIP Grant for the installation of raised medians to reduce collisions and provide refuge for pedestrians since there are only three (3) signalized intersections along this segment. Having secured this grant, the City took this as an opportunity to leverage other funding sources to make this a more complete project. Initially the project […]

Read more

Ferry to Bridge to Greenway Complete Streets Project

  Location Harbour Way South, Hoffman Boulevard, and Cutting Boulevard City or County Responsible for Project City of Richmond Category Complete Streets Projects Description The Ferry to Bridge to Greenway Connector (F2B2G) Complete Streets Plan is a transformative initiative designed to enhance infrastructure, improve connectivity, and expand access to sustainable transportation. The plan connects the Richmond Ferry Terminal, Richmond-San Rafael (RSR) Bridge Trail, and Richmond Greenway, expanding multimodal networks across Contra Costa, Marin, and San Francisco Counties while reducing car use. A key driver behind F2B2G is the need for improved transportation options due to limited vehicle ownership. In the study area, 12% of households lack a vehicle, and 43% have access to only one; underscoring the need for safe, cost-effective transportation alternatives. The F2B2G project offers safe, reliable multimodal transit while reducing congestion and emissions. With $2 million in funding, Richmond built 2.25 miles of Class IV lanes along […]

Read more

West Foothill Boulevard Street Improvement Project

  Location Foothill Boulevard, from Grove Avenue to San Bernardino Road City or County Responsible for Project City of Rancho Cucamonga Category Complete Streets Projects Description Foothill Boulevard in Rancho Cucamonga, California is a section of an invaluable piece of Americana known as Route 66. Throughout the west, it was known for its mid-century car culture, with iconic highway signage, motels, and service stations. Presently, Foothill Boulevard serves as the westerly gateway to the City, and the completion of improvements along Foothill Boulevard from Grove Avenue to San Bernardino Road has long been a priority for the community. In 2021 the City adopted its General Plan identifying upcoming priorities and goals for the next several years. Included is the goal of building on the history and significance of Foothill Boulevard by incorporating design features such as public art, signage, and architecture, that reflect the thoroughfare’s unique history and heritage. Simultaneously, […]

Avenue R Complete Streets & Safe Routes Project

  Location Avenue R between Sierra Highway and 25th Street East City or County Responsible for Project City of Palmdale Category Complete Streets Projects Description The Avenue R Complete Streets and Safe Routes Project is a transformative public works initiative that exemplifies the City of Palmdale’s commitment to community safety, accessibility, and environmental sustainability. With a scope that includes sidewalk enhancements, traffic signal modifications, new bike lanes, and the installation of safety signage, this project aims to create a safer, more connected thoroughfare along Avenue R between Sierra Highway and 25th Street East. Project submitted by Name Krystal Hinojosa Job Title Analyst | Legislative Affairs Organization City of Palmdale Address 38300 Sierra Hwy., Suite A Palmdale, CA 93550 Email khinojosa@cityofpalmdaleca.gov Phone 661-267-5450

Read more

Connect Main Street Phases 1-3

  Location Main St & Central Ave City or County Responsible for Project Lemon Grove Category Complete Streets Projects Description Connect Main Street is a seven-phased, active transportation, multi-modal corridor infrastructure project that enhances the interconnectivity of Lemon Grove. The project is centrally located in Lemon Grove and will be the backbone of a network where residents can access various areas in the city without the use of motor-vehicles. Main Street connects two MTS stations, City Hall, various churches, and places of work, and is closely located to multiple schools. The Connect Main Street Phases 1-3 project is being submitted for consideration for the Outstanding Local Streets and Roads Project Awards Program. Phases 1-2 and 3 is the section of Connect Main Street between Central Ave and Burnell Ave and Davidson Ave and Buena Vista Ave, respectively. Phase1-2 implemented a street conversion and Phase 3 included a road closure to […]