Community Beautification Project

 

Location

Concord Street – Fairmont Avenue to Glenoaks Boulevard; Patterson Avenue – Concord Street to E’ly Terminus; Acacia Avenue – S. Glendale Avenue to S. Chevy Chase Drive; Greydale Drive – Patterson Avenue to N’ly Terminus; Mariposa Street – Acacia Avenue to E. Chevy Chase Drive; Boynton Street – Acacia Avenue to E. Palmer Avenue; Fairmont Avenue – Concord Street to Chester Street; Chester Street – Fairmont Avenue to Patterson Avenue; Intersection of Loraine Street and Columbus Avenue

City or County Responsible for Project

City of Glendale

Category

Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects.

Description

The Community Beautification Project was a comprehensive infrastructure improvement effort that advanced the Save California Streets Program’s goals of safety, preservation, and sustainability. The project included resurfacing eight streets; selective replacement of sidewalks, curbs and gutters, cross gutters, driveway approaches, and alley aprons; installation of new curb ramps meeting federal ADA requirements; planting of new trees; utility adjustments; replacement and installation of traffic striping; modification of existing traffic signals; installation of a new storm drain and drywell system; sanitary sewer upgrades; storm drain replacements; and pedestrian and traffic improvements.

What made this project unique was its integrated, neighborhood-scale approach. Roadway resurfacing was coordinated with utility upgrades, stormwater management improvements, safety enhancements, and neighborhood beautification to maximize public benefit while minimizing construction impacts. Nearly two centerline miles of roadway were rehabilitated, along with approximately 23,000 square feet of sidewalks and driveways, 7,000 linear feet of curb and gutter, and 15 ADA-compliant curb ramps, significantly improving accessibility and mobility for all users.

Preservation and sustainability were central outcomes of the project. Aging sewer mains on Acacia Avenue and Concord Street were upsized to meet current and future capacity needs, reducing the risk of service failures and protecting public health. A new storm drain system on Acacia Avenue now prevents localized flooding, while a corroded storm drain line on Concord Street was replaced to reduce sinkhole risk. In addition, the new drywell system captures stormwater runoff and allows it to infiltrate into the groundwater, supporting sustainable stormwater management and reducing downstream impacts. To further enhance neighborhood character and environmental quality, 120 trees were planted to provide shade, improve air quality, and contribute to long-term climate resilience.

Safety and mobility improvements were also central to the project. Traffic-calming features and improved striping enhanced visibility and reduced speeding, creating safer conditions for pedestrians, cyclists, and drivers. Clear bike-route markings encouraged active transportation and improved connectivity to schools, parks, and regional routes.

By delivering coordinated street rehabilitation, utility preservation, stormwater management, and safety enhancements in a single effort, the Community Beautification Project minimized disruptions and maximized public benefit. The project restored essential infrastructure, improved mobility and accessibility, protected surrounding properties, and created greener, more resilient neighborhoods, fulfilling the Save California Streets Program’s mission to invest in streets that safely serve communities today and into the future.

Please visit https://www.glendaleca.gov/government/departments/public-works/projects/completed/community-beautification-project