Conejo School Road and Willow Lane Sidewalk and Bike Lanes Project

The City of Thousand Oaks is committed to improving the quality of local streets, providing safe and accessible facilities for pedestrians and bicyclists, and encouraging active transportation throughout the community. As part of this commitment, the City has an on-going program to construct sidewalks and bike lanes throughout the community. This project filled critical missing gaps in the sidewalk network within these older neighborhoods as well as added defined bicycle lanes. The project provides 1.5 miles of sidewalk and Class II bicycle lane improvements on Conejo School Rd. and Willow Ln. from Hampshire Rd. to Hillcrest Dr. Previous project conditions required pedestrians and wheelchair users to travel in the roadway adjacent to a 40-mph road and/or travel off pavement onto an uneven dirt surface. The completion of the project has created a safe continuous and comfortable facility for all users, including students, seniors and persons with disabilities. The project connects the surrounding neighborhoods with Conejo Elementary School, Colina Middle School and Beyer Park.
The Willow Ln. portion of the project is part of Ventura County Transportation Commission’s (VCTC) Bicycle Wayfinding program and is a major route for cyclists. In addition to the pedestrian and bike improvements, old City water supply infrastructure was replaced. Much needed storm drain improvements were installed at Willow Ln. and Fairview Rd. to address flooding issues. Coordination with the City’s Annual Pavement Program allowed the project to receive cold mill and AC overlay prior to installing the permanent traffic striping. This project not only improved the quality of the City’s local streets but also encourages active transportation use through the improved access from the neighborhoods and future mixed-use developments to a regional transit stop and shops and businesses along Thousand Oaks Blvd.
The project was funded by Federal Congestion Mitigation and Air Quality Improvement Grant, Active Transportation Program Grants, Gas Tax, TDA Article 3 Grant, and City general funds. The grant funding gave the City the ability to improve the local roads, correct aging infrastructure which reduces on-going maintenance issues, and provide much needed pedestrian and bicycle facilities for all ages and abilities.
The sidewalk, crosswalk enhancements and curb ramps benefit the community through improved pedestrian safety, pedestrian crossings at intersections, and ADA accessibility to all. The road widening and bicycle striping project improvements have provided better defined road features for bicycle and vehicle safety, new facilities including sidewalks and Class II bike paths that encourage residents (parents and students) to walk/ride instead of driving. Air quality is also improved by encouraging the use of active transportation alternatives. The well-defined road features and radar speed feedback signs are also beneficial for vehicle speed calming measures.