The Duncan Road-Comstock Road Roundabout Project comprises the construction of a single-lane rural roundabout in the community of Linden, east of Stockton. This project was funded with Highway Safety Improvement Program (HSIP) and local Measure K Local Street Repair funds. HSIP is a competitive program with the goal of reducing traffic fatalities and serious injuries. This project is the first in San Joaquin County to construct a roundabout in a mainly rural agricultural area. Prior to the project being programmed, several injury-related vehicle collisions were recorded at or near the Duncan Road and Comstock Road intersection, prompting action to reduce collision frequency and severity. The project enhances safety for motorists by replacing the partial stop-controlled intersection with a roundabout, thereby providing better traffic operations and reducing the number of conflicting movements.
A key concern along this corridor was speed and sight distance at the intersection. This project offers a form of traffic calming by reducing speeds and with the additional lighting improves visibility for motorists entering the intersection. The work included preparing an environmental document to obtain CEQA/NEPA approval and coordinating with the County and local agricultural community (including the San Joaquin County Agricultural Commissioner and the San Joaquin County Farm Bureau).
On July 18, 2018, during the project’s planning stage, the County held a live demonstration in Linden where community members and agricultural industry representatives were invited to test a mock roundabout design with various sizes of trucks and agricultural equipment. The demonstration provided the County with valuable feedback that was used to adjust the design to accommodate the largest vehicle anticipated to use the intersection – a truck hauling a Lowboy trailer (107′ in length). During the design phase, a public workshop was held at Glenwood Elementary School to explain the project’s purpose and need and the extent of the work and address the local community’s concerns over the project.
Specific improvements include meandering approach roadways, raised asphalt concrete shoulders to provide added delineation, traversable truck apron and central cobble rock circle, signing and striping, and additional street lighting. The project was completed in February 2024. The project was completed on time.
Project submitted by
Najee Zarif
Deputy Director – Engineering
San Joaquin County – Department of Public Works
1810 E. Hazelton Avenue, Stockton, CA 95205