Elkhorn Boulevard Extension Project

 

Location

Elkhorn Boulevard and Power Line Road

City or County Responsible for Project

Sacramento County

Category

Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects.

Description

The Elkhorn Boulevard Extension Project (Elkhorn Project) was a critical missing connection in the Sacramento, California region’s surface transportation network and is an essential component of a collaborative, multi-agency strategy known as the Capital Region Freight Improvement Project (CRFIP). The CRFIP’s purpose is to improve freight and passenger mobility, safety, and economic competitiveness in the surrounding rural area and the region at large, including improvements to Interstate 5. The Elkhorn Project and Sacramento International Airport (SMF) connection are adjacent to an industrial park, connects to State Route 99, provides a new entrance and exit to the airport, and reduces cargo and commuter traffic off heavily congested I-5.
The project is also an enabling element for SMForward, which is Sacramento County Department of Airports (SCDA) $1.3B program to increase the airport’s capacity and meet the growing demand for air travel through SMF. Part of that program is construction of a new parking structure and reconstruction of access roads. The Elkhorn Project provided a four-lane road extension (approx. 1 mile), two roundabouts, a 32-acre detention basin, new traffic signal, surface improvements, and installing utility backbone infrastructure and lighting along the alignment.
TRC provided construction management services including construction inspection, quality assurance, CPM schedule reviews, office engineering, and contract administration. Sacramento County agencies involved included SCDA, Sacramento Department of Transportation, and Construction Management and Inspection Division. OC Jones was the contractor.
To minimize disruption to the traveling public and airport operations, the project team closely coordinated construction staging and detours with SMF and stakeholders and used night work to reduce traffic impacts. Detailed scheduling included coordinating 24-hour operations for construction of the roundabouts, maintaining passenger access to SMF facilities, safety, and the movement of goods and materials as well as emergency services. The project provided a direct connection from SR99, North Sacramento County, and Western Placer County to the airport’s free waiting lot, avoiding I-5 and minimizing congestion.
Unique elements included:
• Replacing an existing 48” manhole and sanitary sewer connection at 20’ below the existing grade. The groundwater table was about 8’ below the existing grade, requiring a complex, 3-week dewatering plan to complete the work safely and effectively.
• Power Line Road improvements included the crane installation of a 17’ x 10’ X 12’ pre-cast concrete pressure reducing vault. Excavation and crane pick plans to reduce the risk of arcing were approved by SMUD due to the proximity of the 12kV electrical lines. The height of the crane and its proximity to the airport flight paths required FAA coordination and approval.
Funding was through the SCDA CIP, the TCEP, Caltrans District 3, and SACOG.