Description
In the heart of Aliso Viejo, the Enterprise Street Rehabilitation Project marked a significant milestone in urban development. The stretch of road near Trader Joe’s, notorious for its poor condition, underwent a transformative process called full-depth reclamation. By recycling and reusing the existing materials in place, this method drastically reduced the need for trucking both export and import materials, and minimized the use of virgin resources. This innovative approach not only enhanced sustainability but also cut construction costs by approximately 30-40%, all while ensuring a robust 20-year design life.
The remainder of the project focused on targeted interventions. Localized repairs were meticulously performed on specific areas of pavement failure, while a mill-and-overlay approach was applied to sections with significant remaining life. This strategy allowed for the replacement of only the top couple of inches of pavement, rather than resorting to full-depth reconstruction. It was a cost-effective and efficient way to extend the lifespan of the road.
To further enhance the durability of the pavement, a fiber-reinforced asphalt concrete (AC) mix was used. This advanced material helped slow the onset of pavement cracking, extended the overall pavement life, and reduced the lifecycle costs of the street. Through these combined efforts, the Enterprise Street Rehabilitation Project not only improved the road’s condition but also set a new standard for sustainable and cost-effective urban infrastructure development.
Project submitted by
Shaun Pelletier
Director of Public Works / City Engineer
City of Aliso
12 Journey, Suite 100, Aliso Viejo, CA 92656
public-works@avcity.org