Ferry to Bridge to Greenway Complete Streets Project
Location
Harbour Way South, Hoffman Boulevard, and Cutting Boulevard
City or County Responsible for Project
City of Richmond
Category
Complete Streets Projects
Description
The Ferry to Bridge to Greenway Connector (F2B2G) Complete Streets Plan is a transformative initiative designed to enhance infrastructure, improve connectivity, and expand access to sustainable transportation. The plan connects the Richmond Ferry Terminal, Richmond-San Rafael (RSR) Bridge Trail, and Richmond Greenway, expanding multimodal networks across Contra Costa, Marin, and San Francisco Counties while reducing car use.
A key driver behind F2B2G is the need for improved transportation options due to limited vehicle ownership. In the study area, 12% of households lack a vehicle, and 43% have access to only one; underscoring the need for safe, cost-effective transportation alternatives. The F2B2G project offers safe, reliable multimodal transit while reducing congestion and emissions.
With $2 million in funding, Richmond built 2.25 miles of Class IV lanes along Harbour Way South, Hoffman Boulevard, and Cutting Boulevard, enhancing access to jobs and services. These improvements include a two-way cycle track on Harbour Way and Hoffman and a one-way bikeway along Cutting. Among the challenges was coordinating with BNSF Railway and CPUC to ensure GO 88B compliant crossings at four railroad intersections and securing encroachment permits from Caltrans for I-580.
Since 2022, Richmond has experienced increased cycling and pedestrian activity, with more commuters and recreational users along the corridor. Ridership has grown on the RSR Bridge, highlighting the effectiveness of protected bike lanes in encouraging inexperienced or hesitant riders to cycle in high-traffic areas. The project directly addresses first/last-mile gaps, improving access between the Ferry Terminal and BART while integrating with the 36-mile SF Bay Trail network. This expansion provides safer, seamless transportation to Berkeley and North Richmond, strengthening Richmond’s role as a regional active transit hub.
One of the most significant indicators of success is the increased use of the corridor due to the implementation of Class IV cycle tracks, which have provided safer and more direct routes for cyclists and pedestrians. Since 2019, more than 430,000 cyclists have been recorded on the RSR Bridge Trail, making it the most utilized Bay Area bridge for non-motorized transportation. Though specific to the bridge, this growth underscores the value of protected cycling infrastructure. Based on general CO₂ reduction estimates, this shift to active transportation has cut approximately 1,376 metric tons of CO₂ emissions, reinforcing the sustainability benefits.
The project aims to improve equity in Richmond, by offering safer, more accessible alternatives for those who have one or fewer vehicles. Presently, the California Office of Traffic Safety reports a 46% drop in Richmond’s fatal and injury collisions from 561 in 2019 to 302 in 2022. While this monumental decline is not solely attributed to the project, expanded cyclist and pedestrian infrastructure has contributed to safer travel conditions throughout the city.
The F2B2G Complete Streets Project is a model for multimodal urban infrastructure, closing critical transportation gaps while advancing safety, sustainability, and equity. This initiative establishes Richmond as a leader in regional multimodal planning and sustainable transportation. By linking transit, cycling, and pedestrian networks, this initiative reinforces Richmond’s role in Complete Streets planning and sets a regional urban mobility standard.
Project submitted by
Josef Munoz
Assistant Deputy Director of Public Works Engineering
City of Richmond – Public Works Engineering
450 Civic Center Plaza, Richmond, CA 94804
josef_munoz@ci.richmond.ca.us
510-620-6671







