Fremont Street Bridge/Low Water Crossing Replacement Project

Location

Fremont Street at Wilson Creek

City or County Responsible for Project

City of Yucaipa

Category

Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects

Author

Fermin Preciado

Organization

City of Yucaipa

Address

34272 Yucaipa Blvd

Phone

9097972489

Project Description

In partnership with other agencies the City of Yucaipa replaced the low water crossing along Fremont Street, just north of Oak Glen Road, by constructing a reinforced concrete box culvert bridge to provide an all-weather road crossing over Wilson Creek. Prior to the construction being completed, Fremont Street would be closed to vehicular and pedestrian traffic due to floodwaters making the street impassable. Floodwaters also put underground utilities at risk. The project construction elevated the roadway 10 feet above the box culvert. An underground utility corridor was created within the 10 feet. The upstream side of Wilson Creek was graded in a manner that promotes enhanced groundwater recharge. This included a basin with a meandering stream to slow storm flows down to percolate. This is also helpful with respect to water quality since a natural channel allows the soils to filter water. On the downstream side, the SBCFCD maintains a flood control facility serving as spreading basins for groundwater recharge. Prior to the construction of the bridge storm flows would be conveyed through the bypass channel. The construction included channel grading and construction of concrete transition structures to divert storm flows into the spreading basins. Since the construction of the project required work within the channel, the City of Yucaipa worked with the CA Dept of Fish/ Wildlife, Water Quality Control Board, US Army Corp and the Inland Empire Resource Conservation District to satisfy the requirements of the required permits. The environmental permits required environmental mitigation measures to lessen the impacts to the environment in the natural drainage course. Those measures included the collection of seed and top soil prior to the construction of the project and using it to replant the graded slopes and other disturbed areas. Native plants were planted to further stimulate the native vegetation growth. To further reduce impacts, the project also incorporated the use of soil cement on slopes/embankments. The soil cement used the native soil at the project site for a natural look while maintaining the functionality of concrete. Along with the street improvements, the construction of a multi-use trail to provide a connection from the street to the City’s extensive multi-use trail system. The City has an agreement with SBCFCD to utilize the maintenance roads along Wilson Creek for public multi-use trails. The multi-use trails are used by equestrians, hikers and bicyclists on a daily basis. Rather than constructing sidewalk along Fremont Street, a multi-use trail was constructed along the street with a 2 rail fence to provide a barrier between vehicles and the trail. The trail surface was constructed of decomposed granite material to maintain a natural looking surface and prevent erosion. The multi-use trail component further expands the City’s multi-use trail network and provides for multi-modal transportation options.