Golden Valley Bridge Widening

Location

Golden Valley Road @ State Route 14

City or County Responsible for Project

City of Santa Clarita

Category

Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects

Author

Robert Newman

Organization

City of Santa Clarita – Department of Public Works

Address

23920 Valencia Blvd, Santa Clarita, CA 91355

Phone

661-284-1429

Project Description

Dedicated as “The Connie Worden-Roberts Memorial Bridge,” the Golden Valley Road Bridge over State Route 14 (SR14) is an 8.5-mile crucial link of the Cross Valley Connector (CVC), connecting SR14 to Interstate 5. The Golden Valley Road Bridge widening project widened the existing bridge from two to six lanes, added four through-lanes, three lanes to access north and southbound SR14, installed new traffic signals, and added a new northbound access lane. In the event of freeway closures – unfortunately a common occurrence due to wildfires or severe accidents – traffic on the SR14 and Interstate 5 is diverted to the CVC. This project addresses regional traffic needs while providing pedestrians and cyclists with safe access across the bridge via a new protected path and sidewalk. With a retail shopping center at one end, residential housing on the other, and a Park-N-Ride lot adjacent to the bridge, construction was staged to maintain traffic flow and access at all times. This required significant planning and coordination. The project was located in the Caltrans Right of Way, requiring a Caltrans Cooperative Agreement, which involved years of coordination between City and Caltrans Design and Construction oversight staff. Once completed, this project improved safety and operation for this highly traveled interchange. It enhanced the quality of life for pedestrians and cyclists with safer access across the bridge. For motorists, the project significantly increased capacity of the existing interchange and improved operation. Without the improvements, expected traffic levels would have exceeded the capacity of the existing freeway ramp. The City conducted a study and determined the traffic in 2002 was about 3,826 vehicles per day; however, based on City development and other factors that number would skyrocket to over 26,000 by 2030! The total cost for all improvements was $10.2 million, which included a $4.2 million grant from the Los Angeles Metropolitan Authority and $6.0 million in Local Developer Fees.