Humboldt Avenue Street Improvements

There have been longstanding issues with inadequate drainage and street flooding within the City of Chowchilla’s historic core, generally the area bounded by Front Street, 15th Street, Ventura Avenue and Mariposa Avenue. Due to the long surface drainage distances and inadequate intersection crossing improvements, surface runoff moves very slowly along the streets in the area and results in frequent street flooding. In order to address the issue, the City developed a conceptual plan for storm drainage improvements to be made within the historic core, and a plan for phasing of the improvements. Phase 1 of the improvements was the Humboldt Avenue Street Improvements Project. The Project installed storm drainage facilities to serve the southeastern portion of the City’s historic core to collect stormwater runoff and convey it the City’s retention basins. To convey the stormwater, a total of 7,451 lineal feet of storm drain piping was installed, along with storm drain manholes and drainage inlets along Humboldt Avenue, 3rd, 5th, 10th, 12th, and 15th Street.

In addition to providing a solution to the flooding issues in the southeastern historic core of Chowchilla, the Project reconstructed the existing pavement section on Humboldt Avenue from 3rd Street to 15th Street, including replacement or construction of concrete curb and gutter, sidewalks, cross gutters, curb ramps, and driveways at various locations where the improvements did not exist, were damaged or deficient. The roadway surface on Humboldt Avenue had significant failure and is heavily travelled due to it being the main access corridor to Chowchilla High School. High visibility crosswalk striping and pedestrian controlled rapid flashing beacons were installed at non-controlled crosswalks immediately adjacent to the school, providing additional safety measures for citizens crossing the heavily trafficked roadway.