Marsh Creek Road Bridge Replacement

The $4.9 Million Dollar Marsh Creek Road Bridge Replacement Project replaced an existing 29.5 ft wide by 44.5 ft long steel girder bridge that spans Marsh Creek five miles east of Clayton, California with a new, wider, two‐stage precast/pre‐stressed wide‐flange California Bulb Tee girder bridge. Each bridge abutment had either wingwall or retaining walls constructed in each corner of the bridge. The most important objective of this project was to construct this two-season project in one construction season and several Accelerated Bridge Construction (ABC) techniques were utilized. The most critical milestone was to meet the environmental permit restriction deadline of October 31, 2018 for work inside Marsh Creek.