Matilija Dam Ecosystem Restoration Santa Ana Blvd Bridge Replacement
The replacement of the Santa Ana Blvd Bridge over the Ventura River is a gateway project to and a crucial step towards the realization of the removal of the Matilija Dam — an essential project for the long-term environmental health of the Ventura River watershed. The new bridge project with design funding from the California State Coastal Conservancy and construction funding from the California Department of Fish and Wildlife, is key to restoring fish habitat, biodiversity, and coastal wetland ecosystems as part of the larger watershed-scale ecosystem restoration effort. The old bridge was 210 feet long, and the new bridge is 350 feet long. It is wider, longer, and eliminates current and future concerns with increased sediment transport (which will occur with or without Matilija Dam removal) while enhancing endangered steelhead (Oncorhynchus mykiss) migration. The new bridge also provides unimpeded traffic access across the Ventura River, adds a sidewalk (north side) and 4-foot-wide shoulders adjacent to both travel lanes, and addressed the previous bridge’s seismic compliance concerns. Additionally, the project provided local jobs, and economic stimulus, while upgrading infrastructure for improved water and climate resilience. Please let us know if you need more information.




Add Comment