Newland Street Subgrade Repair

 

Location

Newland Street and Ellis Avenue

City or County Responsible for Project

City of Fountain Valley

Category

Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects.

Description

How would you like to reduce your total project cost and time of construction by 80%?

That’s exactly what the innovative Public Works team at the City of Fountain Valley was able to achieve when they used a non standard approach to repair significant settlement of the number two lane, bike lane, curb & gutter and sidewalk that was caused by the 2023 California Rainstorms which produced widespread damage to public infrastructure.

The standard repair method of removing damaged infrastructure, dewatering and excavating soil, recompacting soil, and replacement of infrastructure had a cost estimate of approximately $1,200,000. Due to a high-water table and recommended 10-foot-deep excavation, this traditional method would have had a lengthy construction schedule and created significant disruption to drivers, pedestrians, and bicyclists.

The resourceful Fountain Valley team used high-pressure injected expanding polyurethane foam to lift, restore, and maximize the reuse of the sunken subgrade and infrastructure without using the traditional, invasive and expensive method of replacing the subgrade. In addition, the expanding foam stabilized the soil and increased the density approximately 20% to 30%. The construction cost for this minimally destructive in-situ repair method was less than $200,000, a cost reduction of over 80%.

The importance of discovering the viability of this cost saving option is monumental for a small agency with limited resources. Staff used engineering creativity and heavily considered financial benefits while finding an economically feasible solution that can be used for future occurrences. As a problematic underlying soil condition is present throughout the City, the Fountain Valley Public Works staff now has an innovative, timely, and economically feasible solution should additional settlement occur in town.