Old Town Calabasas Sidewalk Replacement Project

Old Town Calabasas is the quintessential heart of the City of Calabasas where it pioneered the City’s origin and most of its history. Due to its unique location in the City, Old Town corridor serves as a gateway either welcoming or extending farewells to visitors. As a result, it is very important for the City and its residents, Old Town’s equitability and impactful impression. Annually, an average of 7.5 million vehicles pass through the Old Town corridor, making it one of the busiest roadways in the City of Calabasas. Old Town features the historic Leonis Adobe Museum and number of historic buildings with a fine selection of shops and restaurants. All, within walking distance of the Calabasas Civic Center. The critical part of the design for this project was the preservation of its historical character and features while improving safety and accessibility to better meet the needs of all community members and visitors.
This project prioritized complying with current ADA guidelines while preserving the historical and cultural “Old West” theme that local residents have taken pride in and have sought to maintain. In 1994, City Council adopted the Old Town Calabasas Master Plan and Design Guidelines. These Guidelines were followed and incorporated in this project’s design.
The project replaced old sidewalk trex material that had weathered and deteriorated with stamped concrete while conserving the wooden look and texture of the existing sidewalk. The corridor was decorated with floral wooden barrels but they needed to be replaced constantly. This project replaced them with beautiful concrete barrels with wooden texture requiring less maintenance. The new barrels use smart irrigation system and house drought tolerant and native plants. One of the main challenges in the design was to increase sidewalk width with the constraints of the existing sidewalk limits. The project’s design creatively modified the placement of all site furnishing and modified the dimensions of existing tree wells to increase the width of sidewalk for the entire corridor and to promote safe passage way for ADA accessibility. All crosswalks within the Old Town corridor are now enhanced with ADA compliant curb ramps, LED in-pavement crosswalk lighting system, and LED-enhanced traffic warning signs to boost visibility, especially during dark hours. In addition, several tree locations were modified and site furnishings were removed to improve all sight triangles for vehicular traffic and cyclists, in and out of the driveways. This modification directly heightened the safety of the crosswalks adjacent to driveways by minimizing line of sight blockage as vehicles approach crosswalks.
The Old Town Calabasas Sidewalk Replacement Project was a Capital Improvement Project (CIP) and was funded by ad valorem funds. The project was completed in September of 2022 at negotiated with the contractor maximum guaranteed price of 3.5 million dollars.
Please see attached for complete description.