Pico Rivera Regional Bikeway Project – Nomination for Complete Streets Projects
Location
The Project is located along Mines Avenue from Paramount Blvd to the San Gabriel River
City or County Responsible for Project
City of Pico Rivera
Category
Complete Streets Projects
Description
The Project is located along Mines Avenue from Paramount Boulevard (Rio Hondo Channel) to the San Gabriel River. The Project entails the construction and connection of a 1.1-mile protected bicycle lane that provides a connection to regional trails along the Rio Hondo Channel and San Gabriel River. In addition to the bicycle lane, improvements within the project limits include pavement reconstruction, construction of bioswales for stormwater capture along the newly installed medians protecting the bike lane, traffic signal modifications at the intersections of Paramount Boulevard at Mines Avenue and Rosemead Boulevard at Mines Avenue to accommodate safe lane turning/crossing for the newly installed bike path at each of the intersections, and signage and landscaping improvements. The Project utilized sustainable native and drought-tolerant plants, shrubs, and trees to limit water usage.
The City of Pico Rivera’s goal was to provide a safe and protected environment for the community to feel safe to bike/walk from the Rio Hondo Channel to the San Gabriel River. The new bike lane travels along residential areas, Smith Park, a Senior Center, commercial center and the Pico Rivera Library. This Project delivers the need residents would request in the past for a place to bike/walk safely with their children and/or senior residents that provides accessibility, connectivity, and integration of different modes of transportation sharing the same road that safely balances vehicles/bike/pedestrians’ movement.
This Project is the result of meaningful collaboration, communication and input from all stakeholders including residents, City staff, City Council, and continued grant support and guidance from CALTRANS (ATP Funds) and METRO (Measure M Funds). This Project was also successful thanks to the support of the California Natural Resources Agency that funded the unique features, such as permeable pavement along the bike path, bioswales and filtration areas in the median islands protecting the bike lane, along Mines Avenue for flood control through storm water management and urban greening Project.
Lastly, the project includes new pedestrian lighting for the dedicated bike path with green infrastructure of median islands designed to divert, treat, and replenish water resources coming from various forms of storm water and neighborhood runoff, preventing the runoff from discharging to the Rio Hondo Channel or San Gabriel Rivers or treating it prior to discharge. Further, the project utilizes sustainable native and drought tolerant plants, shrubs and trees, that will be watered with reclaimed water, to further limit any usage and/or need for additional water resources.
Project submitted by
Maria Carrillo
Principal Analyst
City of Pico Rivera
6615 Passons Boulevard
mcarrillo@pico-rivera.org
5628014343



