Placentia Avenue and West 19th Street Active Transportation Improvements

 

Location

Placentia Avenue and West 19th Street

City or County Responsible for Project

Costa Mesa, CA

Category

Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects.

Description

The Westside of Costa Mesa is a high-density neighborhood of nearly 40,000 residents that has historically been recognized as one of the most disadvantaged communities in Orange County as defined by the USDOT Office of Management and Budget (OMB) and CalEnviroScreen. In addition to the disadvantaged nature of the neighborhood, the City’s Police Department data shows a disproportionate number of collisions in the community with an especially high number of collisions involving pedestrians and bicyclists.

Recognizing this disparity, the City embarked on the development of the Placentia Avenue and West 19th Street Active Transportation Improvements Project which was a collaborative effort between the City and community members. The project that originally started as a street rehabilitation project for these two primary corridors in the Westside Cost Mesa neighborhood, was reimagined as a Complete Streets project to increase safety and active transportation mobility in the historically marginalized community. The project was designed with the primary goals of (1) reducing vehicle-pedestrian and vehicle-bicyclist collisions by increasing the safety and mobility of non-motorized users and (2) increasing trips accomplished by walking and bicycling.

The project utilizes best practices in pedestrian and bicycle facility design with the implementation of ADA compliant sidewalks and curb ramps, shortening of the crossing distance at busy intersections, the planting of street trees to enhance sustainability and pedestrian comfort, travel lane narrowing to slow vehicle travel speeds, low-stress bicycle facilities suitable for users of all ages and abilities, and green paint and bollards throughout bicycle facilities to enhance visibility.

The bicycle facility portion of the project is included in the City’s adopted Bicycle Master Plan, and is an important component in a network of low-stress all ages and abilities bicycle facilities that allow Costa Mesa residents to access resources and amenities without the use of a personal automobile. The project connects directly to the Victoria Street Class I off-street bicycle trail which provides direct access to the Santa Ana River Trail and recreation area, the Joann Street Class I off-street bicycle trail which connects directly to higher income communities and shopping opportunities to the east, and the Banning Channel Class I off-street bicycle trail which provides access to the Fairview Park nature preserve.

In addition to utilizing proven tools to increase the safety of all roadway users, the project provides an alternative mobility option to support and encourage healthy and sustainable modes of transportation and increase mode shift away from personal automobile and towards active transportation. The project bounds are West 19th Street from Park Avenue to the western City limits and Placentia Avenue from Adams Avenue to the southern City limits representing a combined corridor length of 4.1 miles. The project scope included the following Complete Street elements:

• 13,272 linear feet of Class IV Cycle Track
• 18,572 linear feet of Class II Buffered Bike Lane
• 5,858 linear feet of Class II Bike Lane
• 19,938 square feet of high visibility green thermoplastic used in bicycle facilities
• 240 K-71 bollards used in bicycle facility buffers
• 4 green high visibility bike boxes
• 11,480 square feet of new or updated sidewalk
• 25 high visibility crosswalks
• 8 new ADA curb ramps
• 3 bulb-outs
• 39 street trees
• 1 new pedestrian traffic signal

The importance of the Placentia Avenue and West 19th Street Active Transportation Improvements Project is highlighted by the presence of vulnerable communities along the corridor which stand to greatly benefit from implementation of the project including a 268-unit low-income senior public housing complex, the Costa Mesa Senior Center, Estancia High School, and Wilson Elementary School. The corridor is also served by three high frequency bus routes that are largely accessed by people on foot.

The City worked collaboratively with community members and stakeholders in the design of the project hosting 4 community workshops and a walking tour with the City’s Active Transportation Committee and a local community-based organization (CBO), the Costa Mesa Alliance for Better Streets (CMABS). All community outreach materials were available in Spanish and English, and translators were available at all events.

Funding for the transformative project design, engineering, and implementation was provided via the City’s general fund, State Gas Tax and other local funds.