In 2009, the City of West Sacramento constructed the first phase of infrastructure for the Bridge District Specific Plan, which provides a framework for the development of a well planned, waterfront orientated urban district for the City of West Sacramento to transition the area from its industrial past to the vision of an urban mixed-use district. By 2020 development had largely built out the available Phase 1 area and the Riverfront Street Extension Project was needed to allow the continued revitalization of the area.
The Project extended Riverfront Street approximately 0.15 mile as a two-lane concrete pavement roadway with sidewalks, lighting and landscaping, from its terminus just south of Mill Street, underneath the US-50 Pioneer Bridge, and terminates with a cul-de-sac to allow Riverfront Street to be extended in a future phase. In addition to the surface improvements, infrastructure for all utilities was installed, with dedicated conduits for all local utility providers placed for future use as development occurs. The Project took advantage of the high infiltration rates that the project sites’ soil provided to install an innovative drainage system that captures and treats stormwater runoff in an underground infiltration system. This system captures 100-percent of street runoff on-site during normal rain events and allows it to infiltrate back into the soil, providing both water quality benefits and significantly reducing treatment costs for the City.
The Project also reconstructed 5th Street between Mill Street and 15th Street with complete street elements to provide an important multi-modal north-south connector for bicyclists and pedestrians in addition to autos. The roadway was widened to provide shoulders and the pavement section was rebuilt to meet a higher Traffic Index to accommodate the high truck volume on the street. Overhead telecommunication utilities were undergrounded and aging water and sewer utilities were replaced. 10-foot wide sidewalk was constructed between Mill Street and 15th Street, which significantly improved pedestrian safety and closed a gap in sidewalk between the US-50 on-ramp and Mill Street. All curb ramps were upgraded to meet current Americans with Disability Act standards. The existing 5th Street experienced high volumes of bicycles but did not provide any dedicated bike facilities, requiring bikes to share the road with vehicles. The Project constructed a Class 4 cycle track per current State and NACTO guidelines between Bridge Street and 15th Street, providing a protected bikeway under the freeway between the Riverwalk Trail to the north and destinations south of the freeway. The cycle track is separated from vehicles with a raised concrete island to prevent vehicles from encroaching into the cycle track. Green pavement markings were also added at intersections and driveways to define path of travel for bicycles through intersections and to enhance visibility of conflict points for vehicles. New lighting was added for both vehicles and pedestrians, including separate sidewalk lighting under the freeway. Traffic signals at the both the 5th Street/Bridge Street intersection and at the 5th Street/15th Street intersection also receive upgrades to include bike signals for the cycle track and new countdown heads for pedestrians. A two way left turn lane was added for vehicles to access businesses along 5th Street, and a left turn lane was added for vehicles to access the US-50 on-ramp.
Project submitted by
Jason Roberts
Marketing Manager
Wood Rodgers, Inc.
3301 C Street, Building 100B, Sacramento, CA 95816
jroberts@woodrodgers.com
9164408155