Rumrill Boulevard is a 1.6-mile vital corridor connecting Central Richmond and the Richmond Bay Area Rapid Transit (BART) station to key community destinations in San Pablo, including Contra Costa College. This corridor lacked appropriate pedestrian, bicycle, and stormwater infrastructure causing annual bike and pedestrian incidents and localized flooding.
The Rumrill Boulevard Complete Streets Project (the Project) stemmed from a multi-year community-based planning and design process focused on creating a safe and friendly place for individuals and businesses by improving conditions for walking, bicycling, and transit. Community meetings determined pedestrian and bicycle safety as the primary goals, and the final design built on those community goals. Communication and responsiveness with the community continued during construction to support residents and businesses during this significant transformation.
The Project contains the common criteria of a complete street including the following improvements: widened sidewalks; ADA compliant ramps; safety of pedestrian crossings at 21 intersections with bulbouts and 5 pedestrian signals; 3.4 miles of Class IV bike lanes; localized pavement repairs and surface seal; stormwater bioretention basins; improved storm drain system; managed street parking; road diet; 9 bus transit shelters; 72 additional luminaires; traffic signal modifications at 7 intersections; and 7,000 square yards of landscaping with 230 new street trees. Furthermore, the City collaborated with private utility companies to perform underground utility improvements and relocation in advance of the Project, reducing impacts on the new construction and to address conflicts.
The bike lanes complete a portion of the West Contra Costa County bike network and provide access and comfort to riders who use the bike route as an alternative to motorized transportation. The Project is included in Plan Bay Area – a Sustainable Communities Strategy – to achieve multiple targets under the Senate Bill (SB)-375 Transportation Plan reducing per-capita CO2 emissions from cars and light-duty trucks, reducing the number of injuries and fatalities from all collisions, and increasing daily time walking or biking for transportation.
Since its implementation, the number of collisions reduced from 145 to 50 (2018/19 to 2023/24), zero fatalities compared to an average of one per year, and traffic citations (primarily speeding) reduced from 320 to 45.
The Project met stringent stormwater grant requirements by treating over 9 acres with 14,589 square feet of bioretention basins and utilized 2,515 square feet of pervious concrete, providing treatment of a polychlorinated biphenyl (PCB) hot-spot area and increased stormwater infiltration. The Project’s landscape areas can infiltrate up to 100,000 gallons of stormwater per year. Further environmental benefits are attributed to the combination of improved bike and pedestrian facilities and the additional shade trees to create an estimated net GHG reduction of 983.53 MT CO2e. Additionally, 41 storm drain trash capture devices were installed.
Finally, these comprehensive improvements were achieved by significant grant funding to supplement the City’s limited CIP budget. The City systematically applied for grants resulting in $18.5 million dollars from 9 different sources, including but not limited to Caltrans ATP, Caltrans Alternative Compliance, Caltrans SB 1, CNRA, EPA, and MTC.