San Fernando Beautification Project, Phase I
Location
San Fernando Road, between Elk Avenue and Grandview Avenue
City or County Responsible for Project
City of Glendale
Category
Complete Streets Projects
Description
The San Fernando Road Beautification Project, Phase I includes construction of 17,900 square feet of center median islands, surface grinding and placement of 1.6 centerline miles of asphalt rubber hot mix, installation of 8,500 linear feet of new class II bicycle lane and class III bicycle route, modification of 12 intersections to meet current ADA standards and improve pedestrian safety, install drought-tolerant landscaping and stormwater filtration and infiltration systems, and installation of creative crosswalks and decorative fencing.
San Fernando Road serves as a key connector between industrial and commercial areas and residential neighborhoods in southwest Glendale. It also functions as a vital north-south route, providing a bypass to the I-5 Freeway as well as connecting Burbank and Los Angeles. The Project stands out by not only enhancing the corridor’s aesthetic with landscaping and art, but also creating a safe multi-modal environment for all users. The project has introduced 120 new trees and over 10,000 drought-tolerant native plants along center landscape islands and both sides of the corridor, and features 7,000 square feet of high visibility, creatively designed crosswalks and 500 linear feet of decorative fencing at intersections, which brings in aesthetic elements to the corridor. On the other hand, it integrates bike lanes and Sharrows along with 15 new curb extensions, without removing any traffic lanes, which significantly improves safety of bicyclists and pedestrians while maintaining vehicle mobility.
The Project, funded by Caltrans’ Clean California Local Grant, implements environmentally friendly and sustainable solutions that improve safety and travel experience for all users of the corridor. It features new trees and drought-tolerant, native landscaping on the west side of the roadway, which provides naturally screening for the railroad tracks. On the east side, upgraded sidewalks, ADA ramps and curb extensions improve accessibility for the community and expanded vegetation areas, increasing pervious surfaces to reduce stormwater runoff and improve water quality. In addition, stormwater filtration and infiltration systems such as bioswales and drywells introduce green street elements, further contributing to the corridor’s environmental sustainability. Finally, the addition of creative crosswalks and decorative fencing adds artistic elements to the corridor, making it not only visually appealing but also enhance pedestrian safety in the intersections.
Please visit https://www.glendaleca.gov/government/departments/public-works/projects/completed/san-fernando-road-beautification-project-phase-i
Project submitted by
Sarkis Oganesyan
Assistant Director of Public Works/City Engineer
City of Glendale Public Works Dept.
633 E. Broadway #205, Glendale, CA 91206
yguerra@glendaleca.gov
8189378288



