San Jose Creek Bike Path North

Location

Kellogg Avenue

City or County Responsible for Project

Santa Barbara County

Category

Safety or Intelligent Transportation System Projects

Author

Bill Tracy

Organization

County of Santa Barbara, Department of Public Works

Address

4417 Cathedral Oaks Road, Santa Barbara CA 93110

Phone

805-886-1591

Project Description

Construction is nearly complete on the San Jose Creek bike path in January, 2018. This heavily wooded path includes a 970-foot long Class I bike path between Kellogg Avenue and Merida Drive near Cathedral Oaks Road. The path travels from Kellogg Avenue through the open space next to the Kellogg Tennis Courts, over San Jose Creek and along the northern edge of University Open Space. The bike path includes a 140-foot bridge over San Jose Creek. Construction is expected to be complete by February 2018. The bike path is part of the 1993 Goleta Community Plan and 1999 Goleta Transportation Improvement Plan (GTIP). The total cost of the project is $692,000 and includes $400,000 from the Measure A Bike and Pedestrian Program and $292,000 from GTIP. Impact on the traffic will be limited and both the Kellogg Tennis Courts and University Circle Open Space will remain open. Public Works will implement erosion and sedimentation, fugitive dust emission, and water pollution control plans to decrease potential environmental impacts of the bridge construction. The bridge was designed by Bengal Engineering, Inc. of Goleta, California. The 140 foot long, 10 foot wide prefabricated bridge spans San Jose Creek. Two abutments support the bridge which is founded on deep foundations. The California Department of Fish and Game mandates restoration of 0.30 acres, which is 13,068 square feet of vegetative cover to mitigate project impacts. The oak trees shall be fenced or protected with wire baskets from herbivores until 50% have reached 8 feet in height. Maintenance on these trees would be 2 years with irrigation. At the end of the maintenance period at least 40 of the oaks should be in good health and have an 80% survival rate. All tree and perennial shrub planting shall have a minimum survival rate of 80% for the first year, and a 100% survival rate the year after. Therefore at the end of the first year there shall be at least 72 remaining trees, 40 large shrubs and 228 small shrubs and after three years and at the end of the five years of the project. Vegetative cover of 10,454 square feet is required at the end of the first year of the project and for the remaining four years of the monitoring.