Project construction began September 6, 2022, and was complete on November 2, 2023.
The path was temporarily opened from Memorial Day through Labor Day to allow the community use of the path during the summer months while the safety railings were completed. Final installation of the safety railing and landscaping were completed after the Labor Day holiday.
Project Summary
The new 0.8 mile, Class I bikeway and multipurpose path connects Santa Claus Lane to Carpinteria Avenue and provides a crucial link as part of the California Coastal Trail network. The $12.5M concrete Santa Claus Lane Class 1 Bike Path runs adjacent to the southbound lanes of US 101 between Estero Street near the Carpinteria Avenue off-ramp in the City of Carpinteria and Sand Point Road in the County. It is located on the beach side of Highway 101 between the freeway and the railroad tracks. This bike path also meets a US 101 High-Occupancy Vehicle (HOV) project requirement.
Pedestrians and bicyclists can now walk and ride between the City of Carpinteria and Santa Claus Lane, a popular beach and local business area in the County of Santa Barbara.
In addition to providing a critical link for bicyclists and pedestrians, other wheeled vehicles such as scooters and skateboards are able to make the journey from Carpinteria to Santa Claus Lane and back. Biking groups said they are happy to see the transportation connection and especially the commitment to make a safe route through the area.
Improvements were also made to the intersection of Estero Street and Carpinteria Avenue with updates for the multipurpose path connections and crosswalks. A new vehicular turnaround was built at the northern terminus of the bikepath to improve access to the bikeway and to provide a safe and legal location for Santa Claus Lane traffic to turn around without entering the freeway. This feature was brought into the bike path project early due to the close coordination needed with Caltrans for construction, and to reduce construction and traffic impacts during construction.
The Santa Barbara County Association of Governments (SBCAG) in partnership with the California Department of Transportation (CalTRANS) led the project with extensive collaboration and multi-jurisdictional coordination with many stakeholders including, County of Santa Barbara, City of Carpinteria, State of California, Union Pacific Railroad, Land Trust for Santa Barbara County, California Coastal Commission, California Department of Fish & Wildlife, and Army Corp of Engineers.
Completion Date and Construction Schedule, Management, and Control Techniques
Meeting the project start date was critical to the success of the project, as well as the adjacent segment of the US 101 HOV project. The success of the project was dependent upon numerous expedited processes from external stakeholders, yet the project team worked through the challenges and met the schedule start date. Within those 18 months, the project:
Obtained coastal and environmental permits and agreements from: City of Carpinteria, County of Santa Barbara (public works & Flood Control), State (Coastal Commission), Union Pacific Railroad, California Department of Fish & Wildlife, Army Corp of Engineers
Extensive coordination between the multiple stakeholders was essential from design to completion. The project team worked in close collaboration with SBCAG throughout the project as well as multiple key stakeholders to ensure all issues were thoroughly addressed and progress communicated. Key stakeholders included:
Santa Barbara County Association of Governments
Caltrans
County of Santa Barbara
City of Carpinteria
Land Trust of Santa Barbara County
University of California Natural Reserve System
Union Pacific Railroad
California State Coastal Commission
California Department of Fish & Wildlife
Utilities owners: AT&T, Cox Communications, Carpinteria Sanitary District, Carpinteria Valley Water District, Frontier Communications, Southern California Edison, Southern California Gas Company
Local business owners
Residents
Weekly coordination meetings were held to manage the schedule and proactively address any challenges and issues. The project team worked closely to mitigate multiple challenging issues that could have severely affected the project schedule’s critical path.
Alternative Delivery
Approximately halfway through final design development, SBCAG and Caltrans made the determination the project would be executed under the umbrella of the HOV corridor Construction Management General Contractor (CMGC) with Granite Construction. The project design team already had experience working under this approach on the HOV projects, so the transition from traditional design-bid-build was seamless. The CMGC process allowed the contractor early access to the project and value engineering was incorporated, and potential construction issues were resolved before the ground breaking.
The contractor supported the pre-construction activities such as detailed and hands-on utility investigation and coordination; field exploration of complicated interface areas; drone surveys and photography; railroad coordination; and construction innovations with the sheet pile wall. The CMGC process also expedited the construction contract execution and overall schedule. This was vitally important to schedule the specialized pile installation equipment and to order the production and delivery of the sheet pile so the retaining wall construction could begin the second week of the contract.
Appropriate safety features were in place throughout the project. Construction work was performed within the guidelines of the OSHA Construction Safety Orders. Granite Construction developed a site-specific safety program, and the project superintendent ensured all safety procedures were followed daily on the job site.
No lost-time injuries were recorded on this project.
Safety measures were taken to protect the community, and the construction management and contractor team worked closely with the County to provide current information on upcoming activities and stages of construction as well as the project’s progress. Communication methods included:
Press releases distributed through radio, television, on line news services, and newspapers.
Project updates provided on the County’s website with a page dedicated to the project.
Updates on social media platforms, including a video highlighting the completed project: https:// www.youtube.com/shorts/pLcdrHD76Qg
In addition to construction safety, many of the design features will improve long-term operational safety for the users and maintenance teams.
• All bicycle and pedestrian crossings have high visibility pavement markings.
• Curbed median and side islands provide refuge areas and physical protection for bicyclists and pedestrians.
• Green pavement markings make the bike path and users more conspicuous to drivers at all roadway and driveway crossings.
• The roundabout/turnaround improves safety for all modes by reducing vehicle speeds, improving visibility and eliminating conflict points.
• The custom-designed tube and cable railing provides ADA compliant fall protection at the top of the wall (up to 11 feet above adjacent ground).
• The Type 85 concrete barrier with bike railing separates the freeway from the path for the entire length in the State right-of-way.
Making for Better Community Living
Between Santa Claus Lane and Carpinteria Avenue, bicycle traffic was diverted inland via Padaro Lane, Via Real, and Santa Ynez Avenue; there was no continuous, direct route along the coast. This diversion also created a gap in the California Coastal Trail. Some portions of the existing route were not wide enough to accommodate standard bicycle lanes, and bicyclists had to compete with vehicular traffic for space along the route. The purpose of the project was to:
• Improve bicycle and pedestrian travel by providing a direct coastal route between the Santa Claus Lane commercial area, beaches in the County, and Carpinteria Avenue in Carpinteria.
• Complete a segment of the California Coastal Trail consistent with the circulation and bikeway systems outlined in the County’s Comprehensive Plan, City’s General Plan, the statewide CCT Map, and the Plan for Improved Agency Partnering (Caltrans and California Coastal Commission, 2016).
• Enhance and improve coastal access for bicyclists and pedestrians consistent with local coastal policies and plans.
Looking to the Future
Ultimately, the path is a local agency facility in the State right-of-way. The City of Carpinteria, Santa Barbara County, and the State executed a Maintenance Agreement to clearly assign maintenance responsibilities. The significant items were the wall, path surface, railings, and lighting. The State maintained responsibility for the wall, whereas the City and County split responsibility for the remaining items.
The wall design provides a 75-year design life, even in the corrosive salt march environment. The City and County requested a concrete path surface for improved longevity and better sweeping performance. The tubular railing was hot dip galvanized and then coated with Natina© to add more protection and provide a more natural coloring to those features. Stainless steel cables and hardware were used, like on sailing vessels, to provide long-term durability in the salt-laden marine atmosphere. The design provides clear delineation between the different responsible parties. For example, the wall and path surface are separate features, which provides a clear demarcation of responsibility and allows the surface to be maintained without affecting the wall.
“We love riding to Santa Barbara and back from Ventura. This bike path is so much more safe than being on the road. It’s death defying out there with all the cars. So safety is very important.” – Local Bike Enthusiast