Teresa and Delta Avenue Pavement Preservation Project
Location
Unincorporated Community of South San Gabriel, Teresa and Delta Ave.
City or County Responsible for Project
County of Los Angeles
Category
Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects.
Author
Leslie Schenk
Los Angeles County Department of Public Works
900 South Fremont Avenue, Alhambra, CA 91803
(626) 458-5946
Project Description
In September 2017, the Teresa and Delta Avenue Project (Project) was completed in the unincorporated community of South San Gabriel. It serves as one of seven neighborhood pavement preservation projects completed by the County of Los Angeles Department of Public Works (DPW) this past year. The 11.7 lane-miles of residential roads had an average Pavement Condition Index of 59 (fair condition). The goal of this Project was to use preservation treatments as a stopgap measure to extend the service life of the roads until funding becomes available for more permanent repairs. Typically, stopgap measures are applied on low traffic volume roads and/or the preservation is the only alternative other than reconstruction due to thin existing pavement depth. A cape seal was the main preservation treatment utilized, which consisted of a slurry seal and a scrub seal. As DPW is committed to using recycled materials in treatment selections, all seal techniques utilized Reclaimed Asphalt Pavement (RAP) rather than virgin aggregate. In addition, to help improve the ride-ability, a thin layer of the road surface was milled prior to applying the treatments. This process was called micro-milling and used to smooth out irregularities of the road surface and to remove any excess material build up along the gutters. In-house road maintenance forces were used to address parkway and street improvements including curb ramp upgrades to comply with the Americans with Disabilities Act; tree pruning or removal; repair of damaged sidewalks and pavement digouts associated with severe distresses. Job Order Contract (JOC) was used to expedite project delivery. The contract cost was $1.4 million ($0.78/SF) and is expected to extend the pavement service life up to eight years. The JOC approach resulted with an overall soft cost of 19% which was less than the standard design and low bid contracting process. When compared with equivalent life cycle costs and environmental footprints of a traditional reconstruction versus a preservation alternative, the pavement preservation treatment saved an equivalent of $1.1 million, reduced the energy consumption by 80% and greenhouse gas (GHG) emissions by 84%. In addition, using RAP did not only prevent tons of old asphalt pavement from going to a landfill, it also preserved natural resources from being removed from the earth. In summary, the Project directly preserved and improved the overall quality of the local streets and road system in a cost-effective and environmentally friendly way. Also, the use of JOC contract provided an efficient delivery mechanism of extending our workforce by enabling DPW to complete work tasks in an efficient and timely manner. As a result, the impact to the community was substantially reduced. DPW’s Pavement Preservation approach demonstrates a commitment to implementing sustainable projects, meeting objectives of statewide mandate (AB32) to reduce GHG, and addressing existing funding shortfalls.















Add Comment