The City of Calabasas is dedicated to environmental sustainability and has taken a proactive approach through the Public Works Department. One of the City’s flagship initiatives is the Citywide Green Streets Project. In 2015, the Calabasas City Council adopted a resolution to fully support and promote the Green Street Policy for public and private development. This policy focuses on incorporating Low-Impact Development (LID) strategies that mitigate stormwater runoff, reduce pollutant loadings, and minimize erosion and hydrologic impacts on the natural drainage system. These efforts aim to enhance water quality and promote a sustainable urban environment.

The Citywide Green Streets Project – Phase I, completed in October 2024, included the redesign of an unpaved portion of Las Virgenes Road, integrating a vegetated swale and tree-well filters in addition to other road improvements. These elements serve as infiltration chambers, capturing and gradually infiltrating stormwater. Additionally, the project constructed a cul-de-sac create a complete street and to allow fire engines to safely turn around. The Citywide Green Streets Project – Phase I connected the Upper Las Virgenes Canyon trail network to Las Virgenes Road, providing recreational benefits for residents and visitors.

The project established curbs, gutters, and bioswales to manage stormwater at its source, where rain falls. Unlike conventional systems where stormwater travels directly to the nearest catch basin, the project redirects water to bioswales. This natural filtration system uses soil and native plants to remove pollutants before the water enters storm drain systems. Additionally, the system incorporates rip rap—a layer of large stones or rocks—to slow the flow of water and prevent erosion. These combined elements ensure that the water is cleaner and safer by the time it reaches storm drains. The inclusion of vegetated bioswales, retention walls, and ADA-compliant parking lots and walkways showcases an innovative and holistic approach to engineering and urban planning.

In addition to its environmental benefits, The Citywide Green Streets Project – Phase I is dedicated to enhancing the community by prioritizing the safety and accessibility of pedestrians, bicyclists, and users of the area through developing complete streets. Key enhancements include the installation of crosswalks for safe street crossings, the development of a pedestrian path connecting to existing trail networks, and the construction of an ADA-compliant parking lot. The project included the implementation of three (3) well-marked crosswalks for safe street crossings to the to encourage convenience and safety for nearby communities utilizing the parking lot. Next, the development of a path that stretches along Las Virgenes Road (approximately 2,211 foot-long) connects within the existing Upper Las Virgenes Canyon Open Space Preserve and National Park Service land trail network through designated access points. This 8-foot-wide trail, made with decomposed granite (DG), allows bike and pedestrian access into the network of trails. The project also involved the construction an ADA-compliant parking lot to ensure barrier-free routes for individuals of all abilities using the area. Dedicated pedestrian and bike paths along the project site promote walking and cycling as safe and enjoyable activities. These enhancements aim to develop a more integrated and inclusive community, allowing people of all ages and varying abilities to safely and conveniently utilize the area.

Completed in October 2024, the Las Virgenes Green Street Project transformed an unpaved shoulder into a sustainable urban feature. The project’s design improvements, including bioswales and native tree planting, not only manage stormwater effectively but also provide long-term environmental benefits. These measures are replicable and offer a model for other cities to follow. The focus on sustainability ensures that the positive outcomes of the project will continue well into the future, ensuring the resilience of the area.

The City’s Public Works staff provided in-house construction management, which assisted in effectively managing expenses. While there were delays due to design adjustments for ADA compliance and the construction of retaining walls required for Southern California Edison power poles, these changes were essential to provide inclusive and safe access for all users. By strategically scheduling construction activities and phasing the opening of the new parking lot, the City maintained parking availability for residents across three residential communities (over 100 multifamily units and over 140 parcels of single-family homes) and trail users, minimizing disruptions and inconvenience.

The project significantly enhances the environment by improving water quality, protecting ecosystems, and reducing flood risks. The addition of native trees and plants in the bioswales and along the pedestrian path provides soil stabilization, shade, dust control, and air quality benefits. By managing stormwater at its source and filtering pollutants, the project helps protect natural water bodies from contamination and enhance overall water quality.

Effective collaboration and partnerships are at the heart of the project as they enhance the project’s overall impact and success. Collaborations with local government agencies, environmental organizations, community groups, and private sector partners ensure comprehensive planning, community engagement and involvement, and resource sharing were a key aspect of the project. The City maintained communication throughout the project, ensuring that any changes or deviations from the schedule were promptly communicated. Residents had access to an online Citizens Request System to submit questions or concerns. collaboration ensured diverse input and support, strengthening the project’s impact and success. Calabasas also partnered with the Rotary Club to include benches throughout the project site. Further, the City collaborated with LA County to improve the shared County drainage services. Lastly, the City coordinated with Metro, as this project was partially funded by Measure M funding. The project’s completion was celebrated with a ribbon-cutting ceremony, highlighting the collaboration and partnership between the City, residents, and other stakeholders.

The Citywide Green Streets Project -Phase I aligns with and advances the League and California State Association of Counties (CSAC) priorities and goals for local street and road system preservation. By focusing on sustainable practices, innovative solutions, and community engagement, the project contributes to the long-term preservation and enhancement of the local transportation network, setting a standard for future projects across the region.

The Citywide Green Streets Project – Phase I exemplifies how urban planning can integrate sustainable practices to enhance environmental health and community well-being. The project’s innovative design, cost-effectiveness, and long-term environmental benefits make it a model for others to follow. The positive outcomes of the project align with the League and CSAC’s priorities for local street and road system preservation, showcasing a commitment to creating a resilient and sustainable urban environment.

Benefits provided by the City of Calabasas Citywide Green Streets Project – Phase I expand beyond strictly engineering and roadway improvements. This project transformed a previously unpaved shoulder to minimize negative environmental impacts, manage flood and erosion control, and connected the existing network of trails to provide recreational benefits. These benefits assist in creating a resilient community by enhancing environmental health, promoting sustainable practices, and improving overall quality of life for residents.

The total cost of the Citywide Green Street Project was approximately $5.4M for construction and approximately $142,000 for design. This project was funded by Measure M and Proposition (Prop) 1 Round 1 funds in the amounts of $3.5 million and $536,336, respectively. Assembly Bill (AB) 939 and Measure W each provided funding in the amount of $473,970. Additionally, funds for the additional contingency were available in the Road Maintenance and Rehabilitation – Senate Bill 1 (RMRA-SB1) Program fund.