The Wardrobe Avenue Life Extension Project for Merced County
Location
Merced County: Various Locations along Wardrobe Avenue
City or County Responsible for Project
Merced County
Category
Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects.
Description
The County of Merced (the “County”), in cooperation with Santa Fe Aggregates, completed a pilot project on Wardrobe Avenue to evaluate the performance of fiber-reinforced hot mix asphalt (HMA). This initiative, studied by Surface Tech and the University of California Pavement Research Department, involved a ¾-inch HMA overlay on two miles of roadway, with aramid fibers added to reinforce the mix. The project was funded by local Measure V funds and was combined with a restoration and repair project for a small timber bridge on Wardrobe Ave for a complete two-mile stretch on reconstructed and repaired roadway.
Rather than fully reconstructing the road, the County opted for a cost-effective preservation approach. The fiber-reinforced HMA mix was chosen to test its longevity and ability to reduce maintenance costs, particularly for crack sealing. By improving the surface, the project aims to prevent potholes, cracks, and other hazards, leading to a smoother, safer, and more stable driving experience. The fiber mix is also designed to withstand fatigue and resist damage caused by heavy loads, such as cracking and potholing, which helps improve road durability. Laboratory tests of the mix have shown increased resistance to rutting, further reducing the likelihood of accidents caused by road deterioration.
The project is expected to improve access for residents, businesses, and emergency vehicles, making the road more reliable and less prone to closures. Enhanced traffic flow will also improve connectivity, benefiting daily commuters and recreational travelers alike. By increasing the quality and reliability of the local road system, the project supports long-term economic growth and community well-being.
Incorporating aramid synthetic fibers into the HMA mix represents a breakthrough in road construction technology. This innovative solution addresses challenges in road durability and maintenance, offering a promising model for future projects. The use of fiber-reinforced asphalt can reduce the need for frequent repairs, helping local governments maximize public funds for infrastructure and invest in additional projects.
The County worked closely with the City of Merced, Santa Fe Aggregates, and Merced Irrigation District during this project. The City coordinated road closures, while Santa Fe Aggregates provided expertise on the fiber mix design. The Merced Irrigation District assisted with coordinating diversions during bridge repairs. All collaborations demonstrated the importance of effective partnerships.
The methods and strategies used in the Wardrobe Avenue project can be applied to other road rehabilitation efforts. The planning, execution, and results offer a valuable model for other cities and counties, enabling them to improve their infrastructure more efficiently. The integration of aramid fibers not only enhances immediate road performance but also contributes to the long-term preservation of California’s roadways, aligning with the goals of the California State Association of Counties (CSAC) and the California State Association of Engineers (CEAC). By reducing the need for frequent repairs and expensive rebuilds, this innovative approach supports sustainable infrastructure development.
Project submitted by
Abigail Phillips
Marketing and Proposal Coordinator
CCME, Inc.
6445 N Palm Ave, Suite 106, Fresno, CA 93704
abigail@ccmeusa.com
5595532897






