Towne Avenue Complete Streets Project
Location
Foothill Boulevard and Base Line Road
City or County Responsible for Project
City of Claremont
Category
Complete Streets Projects
Description
The Towne Avenue Complete Streets Project reflects the City of Claremont’s commitment to maintain roadway infrastructure incorporating complete streets elements following the City’s Complete Streets Policy. The Towne Avenue Pavement Condition Index (PCI) of 44 prompted scheduled maintenance for the corridor, between Foothill Boulevard and Base Line Road. As part of the design process, staff used the City’s Complete Streets Policy to assess potential active transportation improvements that could be incorporated to the maintenance project to upgrade the outdated, car-centric corridor. While incorporating community feedback, the complete streets project was designed following sustainability practices, incorporating active transportation elements such as Class II and IV bike lanes, pedestrian bulb outs (curb extensions), American with Disabilities Act (ADA) ramps, median landscaping improvements, pedestrian lighting, traffic signal modifications, monument entry signs, stormwater capture devices, green bike boxes and more. The project was completed using rubberized asphalt, following the city’s commitment to sustainable maintenance practices. The project includes several complete streets elements, such as bulb-outs/curb extensions, to increase pedestrian safety by providing additional pedestrian designated space and time to cross busy Towne Avenue intersections at key locations. The bulb outs were installed to increase pedestrian visibility, and to shorten pedestrian exposure to traffic. Existing medians were improved with new concrete curbs, gutters, and landscaping while new medians allowed for the placement of new Claremont monument signs. The landscaping and artistic monument signs were included to create a sense of place and a new identity for the outdated principal arterial. The project also incorporated buffered Class II and protected Class IV bike lanes. The bike lanes were implemented utilizing green paint to increase driver awareness and bicycle infrastructure visibility. The active transportation elements were incorporated to encourage alternative modes of transportation and to reduce the impact of greenhouse gas emissions (GHG). Numerous studies support that GHG emissions can be decreased by encouraging the replacement of vehicle trips with active transportation options, such as bike lanes. In addition, careful consideration was given to the maintenance aspect of the project. Core sampling was conducted on Towne Avenue to determine the recommended depth of the grind and pave required to properly maintain the roadway. The geotechnical evaluation supported the City’s standard two-inch grind and pave using rubberized asphalt, to properly address the existing roadway deterioration. The handicap ramps at each intersection and the sidewalks along the corridor were all upgraded in accordance with current ADA standards. With the complete streets project, the travel lanes were reduced to 11 feet to accommodate the active transportation infrastructure and for traffic calming purposes. Signalized intersections were upgraded to include green bike boxes to provide cyclists with designated safe and visible area ahead of the queuing traffic during the red signal phase. The project provided approximately 1.6 miles of bike lanes (combination of Class II and Class IVs bike lanes) creating a network connection with the bike lanes along Foothill Boulevard and Base Line Road.
Project submitted by
Maria B. Tipping
City Engineer
City of Claremont
207 Harvard Avenue
mtipping@claremontca.gov
909 399 5474