OVERVIEW
The locally funded $47 million US 101/Blossom Hill Road Interchange Improvement Project in San Jose widened an existing overcrossing from four lanes to seven lanes and installed a completely grade-separated Class I bicycle and pedestrian path through the interchange. Project improvements enhance safety for drivers, pedestrians, and cyclists; buffer nearby residences from noise; facilitate planned development in the area; and strengthen the regional trail network.
The existing Blossom Hill Road Overcrossing was constructed many decades ago, and the surrounding area has changed significantly since then, adding many residential and commercial uses, including the Monterey Plaza shopping mall, Silver Creek Valley Place and recent iStar mixed use development. At the same time, traffic congestion has increased, and the existing overcrossing had not been constructed with pedestrians and cyclists in mind. The San Jose City Council’s Edenvale Area Development Policy identified improvements to this interchange as an important element to the region’s ability to thrive.
The new Class I bicycle/pedestrian path is approximately 0.6 miles in length, traveling along the north side of Blossom Hill Road through the interchange between Monterey Highway and Coyote Road. The path is grade-separated across two on-ramps and one off-ramp: it is elevated on a structure over the northbound on-ramp, which was achieved by lowering the profile of the on-ramp by approximately 16 feet. The path crosses under the southbound off-ramp and southbound loop on-ramp in two concrete undercrossing structures, with an open-air area between to allow in light and air. The path repurposed existing bridge width on the Blossom Hill Road overcrossing over US 101 and installed a 42-inch tall architecturally treated concrete barrier to protect active transportation users from vehicular traffic.
To support the three new lanes on the overcrossing, the team added a new bridge structure between the two existing Blossom Hill Road bridge decks. The existing bridges were seismically strengthened by adding steel casings to the columns and overlaying the footings. The project also included minor improvements to all the off-ramps for operational efficiency and to implement current standards.
The new pedestrian/bicycle path also connects the heavily traveled Coyote Creek Trail to an existing pedestrian overcrossing across Monterey Highway.
This was the first major project in the City of San Jose (City) that relied on Santa Clara Valley Transportation Authority’s (VTA’s) 2016 Measure B, a voter-approved county sales tax measure, to enhance transit, highways, expressways and active transportation. As a result, the stakes were high for this project to perform well. In addition, the Santa Clara Countywide Bicycle Plan identified the interchange improvements as a demonstration project, showcasing all the qualities the VTA wanted to see in a high-volume, bicycle and pedestrian environment.
The City funded the cost of and led the preliminary engineering and final design phases of the project. The project’s construction phase was funded by a combination of VTA 2016 Measure B and City funds with VTA leading the construction management.
INNOVATIONS AND ENHANCEMENTS
Linear Alignment by Lowering On-Ramp:
The City’s Request for Proposals for the project invited proposals to build a grade-separation over the northbound on-ramp, with a switchback structure to reach grade. This would have required non-standard curves and required cyclists to slow down significantly and make turns with tight radii. Instead, HMH’s proposal recommended a completely linear, Americans with Disabilities Act (ADA) compliant 4.8% grade without switchbacks. This was achieved by lowering the on-ramp by roughly 16 feet and installing a soil nail wall to retain Blossom Hill Road. This innovative approach allowed for a linear and continuous bicycle facility without switchbacks or narrow, winding grade separations. The benefit of the linear path was substantial, providing greater safety for bicyclists and pedestrians alike. This innovative concept was one of the key reasons this consultant team was selected for the project. The solution was well received by the City and the community.
Additional Pedestrian Undercrossings at Southbound Ramps:
In the early stages of the project, the City had only planned to grade-separate the northbound on-ramp; however, HMH identified that the highest-volume ramps were in the southbound US 101 direction. HMH shared these findings with the City and worked together to expand the project to include a fully grade-separated alignment for bicyclists and pedestrians, enabling users to travel beneath the two southbound ramps. The revised concepts were excitedly received by the community in early outreach efforts.
Open to Light and Air:
Although slightly more expensive, the undercrossings were designed as two separate structures with longer spans and short abutments to open up the undercrossings to light, air and visibility from the roadway. The project team took steps to ensure that the undercrossings had clear lines of sight and redundant and enhanced lighting to increase user comfort.
Extending the Path to Close Adjacent Gaps:
The Class I pathway stays on the northern side of Blossom Hill Road and connects to Monterey Highway and to the existing Blossom Hill Pedestrian Bridge over Monterey Highway and the Caltrain tracks, a structure known as “Xander’s Crossing” in honor of a 2-year-old boy who was killed by a train at that spot in 2005. Xander’s Crossing provides access from the west side of Monterey Highway to the Monterey Plaza shopping center on the east side. The Blossom Hill Caltrain Station is less than half a mile south of Xander’s Crossing, making it a key link between public transit and shopping. Ultimately, California’s high speed rail will travel along these tracks, which will make the connections to the pedestrian/bicycle bridge even more crucial to enhancing safety along this important transit corridor.
At the time of construction, the City secured additional funding to pave the Odette Morrow Trail, a one-mile loop trail that travels along the west bank of Coyote Creek and connects to Shady Oaks Park to the east. Late in the project, the team added a trail connection to the pedestrian/bicycle path to provide seamless connectivity. The trail also links to a major scenic trail, Coyote Creek Trail, in the City, filling in a longstanding gap in the existing bicycle and pedestrian infrastructure network and connecting the trail to Xander’s Crossing. The result is a smooth and continuous path for cyclists and pedestrians, enhancing safety for drivers, pedestrians, and cyclists.
Public Outreach Visualizations:
Project plans are often difficult to interpret at public meetings and with city councils. To demonstrate the benefits of the project in an understandable environment, persepective renderings and navigable 3D photos of key viewpoints were prepared and were instrumental in demonstrating the immense benefits of the project.
Earthwork for Comfort:
The project resulted in a net excess of dirt and would have required off-hauling materials. The contractor proposed, instead, to modify the grading within the loop off-ramp to create a berm between the path and US 101. Not only did this innovation reduce the cost of earthwork and additional carbon emissions of transporting this material, the berm now acts as a visual and noise barrier between the path and the highway, substantially reducing ambient noise.
CHALLENGES OVERCOME
Neighborhood Impacts:
Addition of the Class I path required removal of a dozen mature trees along the backyard of residents on Century Manor Court that could not be replaced in kind and also resulted in the elevated path exposing residents’ backyards to the public. After meeting with residents, the project team developed custom visual screening panels to address concerns that were also lightweight to reduce structure costs and added aesthetic elements to the pathway.
Structure Complexity:
To seismically retrofit the existing structures, the team overlayed the existing footings and installed steel jackets around the existing columns. Project improvements required driven piles in the very narrow median of busy US 101 underneath the Blossom Hill Road structure. The construction crew also had to contend with low overhead clearances for the pile driving rigs.
The relatively small project involved an unusual and diverse number of structures—including a steel truss main span over the lowered on-ramp with short-span concrete approaches; mechanically stabilized embankment walls; a soil-nail wall; tie back walls; and a concrete slab structure; each chosen with careful consideration to take cost considerations into account.
Furthermore, all of these structures reside in the liquefaction-prone, clayey soil of the Silicon Valley floor and are subject to high ground accelerations due to proximity to the San Andreas and Calaveras faults.
Utilities:
The project coordinated with Comcast/Zayo to keep an active communication line in the existing bridge sidewalk active throughout construction. With Comcast/Zayo inspectors present, the contractor chipped off the existing sidewalk, exposed the existing conduit, shifted it into the new Class I pathway and cast it into the new pathway poured on top of the structure deck – all without interrupting communication service.
Enhancing Safety:
The residential neighborhood of Coyote Creek is landlocked, bound by US 101 to the west and Coyote Creek to the east. The nearby schools that are on the other side of US 101 result in many children who live in the Coyote Creek neigborrhood crossing the busy thoroughfare at-grade twice a day to get to and from school. Even the local high school cross country team would run through the interchange as part of their daily practices. The interchange improvements provide children and other local residents with safe passage to jobs, housing, schools, shopping, trails, hospitals and recreational uses. Because the cyclists and pedestrians routes within the Project are grade separated, high-volume/high-speed slip ramps were retained without pedestrian safety concerns and will continue to serve the existing very high vehicular demands.
Facilitating Future Development:
The project will facilitate future industrial and commercial development in the Silver Creek Valley neighborhood on the east side of the interchange. Widening the structure helps relieve traffic congestion on the local roadways in the vicinity of the US 101/Blossom Hill Road interchange, while also providing the kind of walkable environment that residents and businesses alike are seeking.
Minimizing Impacts:
HMH worked extensively with the Coyote Creek Neighborhood Association, which was a strong advocate for the interchange improvements. The president of the neighborhood association, Darryl Ospring, attended local PTA meetings with the team and advocated for the project. The neighborhood association also worked with the team to make sure that the community’s interests were met as the project went through the design and construction phases. The project team worked extensively to protect neighborhood amenities including a 52-inch diameter heritage oak and a community installed gateway monument at the Blossom Hill Road/Coyote Road intersection.
Creating a Safe and Welcoming Environment:
The team developed a truly welcoming environment for pedestrians and bicyclists by designing the undercrossings to be wide and roomy. Architectural treatments along the concrete walls recall the area’s agricultural heritage and deter graffiti. The undercrossings receive plenty of natural light during the day. The Project also installed twice the typical amount of lighting to ensure that they are safe, well-illuminated spaces to cross, even at night.
COST AND SCHEDULE
The consultant team worked hand-in-hand with City staff throughout the project development process, meeting twice a month on average to handle key issues. The team worked with Caltrans to ensure that the City did not have to replace the existing roadway structure. Caltrans requested several barrier replacements on the south side of the roadway that would have increased the project cost by hundreds of thousands of dollars, but the project team was able to demonstrate that these replacements were not the City’s obligation. The team also leveraged previous design exceptions dating back to the early 2000s, including design exceptions for freeway geometry, particularly for the southbound off-ramp.
Although the traffic volumes dictated that, per Caltrans policy, the off-ramp should be widened to a two-lane off-ramp, the team was able to revalidate existing design exceptions including a review of new collision data and project ramp volumes to demonstrate that a one-lane ramp would suffice.
The team implemented Caltrans’ process for a combined Project Study Report (PSR)/Project Report (PR). This less frequently used approach allowed the team to streamline early studies and begin environmental activities earlier in project development. Additionally project improvements were developed in such a manner that no creek or riparian work was required and no right-of-way was needed. As such the project was environmentally cleared under a Categorical Exemption/Categorical Exclusion finding.
These aggressive steps allowed the team to complete the Project Initiation Document (PID) and Project Approval / Environmental Document (PA&ED) phase in just two years. Additionally, the team accelerated PS&E efforts, submitting the 35% Plans the day after the Project Report (PR) was approved. These efforts reduced the anticipated project schedule by over 12 months and reduced environmental and permit costs by several hundred thousand dollars. Accelerating the project ultimately paid off when the project was selected to receive $40 million of 2016 VTA Measure B funding due, in part, to project readiness.
CONCLUSION
The project is a prime example of what Santa Clara County residents expect to get with their tax dollars: a cost-conscious, streamlined, multi-modal project that removes highway barriers to connect communities and provides equitable access for all.
This project now serves as a model for future regional highway projects, building capacity and enhancing safety for cyclists, pedestrians and vehicles, alike. The improvements to this outdated interchange significantly enhanced safety for drivers, pedestrians, and cyclists alike, while invigorating economic development and strengthening connectivity across the regional trail network.
“This consultant team is amazing. Without this team, I don’t think we could have really achieved the level of this project. We were dealing with multiple entities, including Caltrans and VTA and the City of San Jose, so all of us have to agree on everything. The team bridged those gaps for us and really got us to a place where we have a Class A project at this location. The team was wonderful in terms of carrying this project all the way through with us.”
Zahir Gulzadah, Regional Projects Program Manager, City of San Jose
Project submitted by
Jon Cacciotti
Vice President
HMH Engineers
1570 Oakland Road
Jcacciotti@hmhca.com