West Capitol Avenue Safety Enhancement and Road Rehabilitation Project

West Capitol Avenue is the major east-west arterial through the City of West Sacramento connecting industrial, commercial, and residential land uses along the corridor. Initially built in the 1950s as part of the Lincoln Highway, West Capitol Avenue has been overdue for extensive rehabilitation and modernization.

West Capitol Avenue is envisioned as the Downtown area which includes a central core with a vibrant main street that takes advantage of its prime location, provides an attractive setting for a variety of land uses, including the Civic Center, Community Center, Transit Hub, as well as residential, commercial and urban parks that are accessible via multiple modes of transportation. The roadway, formerly US 40, had fallen into a state of disrepair showing signs of distress with PCIs as low at 30. Previously, there had also been numerous collisions along the corridor.

This $13 million project, funded by several federal and state grants increased safety by adding bright green separated bike lanes, street lighting, and pavement improvements on nearly three miles of West Capitol Avenue from Jefferson Boulevard to the point where it turns into Enterprise Boulevard at the I-80 westbound interchange. The work continued on Jefferson Boulevard south under the freeway interchange to Park Boulevard.

The project rehabilitated the pavement along the entire stretch with re-striped vehicle lanes and added separate bicycle lanes. It also added additional lighting and three enhanced mid-block pedestrian crossings with flashing beacons. The traffic signals at five intersections were modified, including new signal heads, accessible pedestrian signals and the addition of bike detection zones, and underground infrastructure was upgraded to accommodate a future fiber optic system. New 12” and 16” water pipelines were installed to accommodate future development and fire flow demands with fire hydrants, and commercial and residential water services.

The complete streets components of this project included a road diet through a portion of the project and a two-way left turn lane west of I-80, as well as retrofitting twenty six ADA compliant curb ramps, mid-block crossings, and enhanced crosswalks. These added safety features, as well as the implementation of Class II buffered bike lanes, and creative pavement rehabilitation strategies have brought new life and increased multi-modal usage into this key City route.

A critical component of this project included the sustainable use of recycled car tires in the pavement on West Capitol Avenue. The City diverted approximately 27,046 waste tires from being disposed to landfills in this road rehabilitation project. There are several benefits of incorporating recycled tires into roads, including less maintenance, quieter roads, and better contrast between pavement and road striping, which improves pedestrian, bicycle, and vehicle safety.