Woodward Island Road Bridge

Location

Bacon Island Road and Middle River

City or County Responsible for Project

San Joaquin County

Category

Bridge: Efficient and Sustainable Bridge Maintenance, Construction and Reconstruction Projects

Author

Najee Zarif

Organization

San Joaquin County – Public Works

Address

1810 E. Hazelton Avenue, Stockton, CA 95205

Phone

2094683053

Project Description

Although it stood as an historic treasure for 80 years, San Joaquin County recognized the need to replace the antiquated Woodward Island Ferry system. The Ferry provided access to 1,850 acres of rich farmland in the San Joaquin Delta and the local farming community relied on it to transport $2 million annually in agricultural exports across Middle River to Upper Jones Tract. However, as operational costs to run the ferry increased to upwards of $90,000 annually, the reliability and practicality of the cable-driven barge diminished. San Joaquin County Department of Public Works (SJCPW) joined with the Island’s Reclamation District 2072 and the East Bay Municipal Utilities District (EBMUD), which owns three large pipelines that deliver water to 1.5 million customers in the San Francisco Bay Area. Our trio (County, RD2072, and EBMUD) formed a highly productive working partnership and developed a solution to: 1) Enhance operational safety; 2) Improve the cost effectiveness of providing Island access; and, 3) Improve the reliability of access for maintenance and emergency response. This resulted in a three-party cooperative agreement to upgrade or replace the Ferry. Key stakeholders for the project included the mariners that used Middle River for recreation and emergency response and the US Coast Guard. Discussions with the Coast Guard resulted in a daunting requirement: Any modifications to access must provide more than 100’ of vertical clearance for marine traffic. This requirement raised two primary options: 1) Upgrade the Ferry system to be more reliable, or 2) Construct a movable bridge. However, both proved financially infeasible. Our Project team strategized and developed another solution: Construct a fixed bridge with a removable center span! Such a bridge would eliminate the need for very expensive mechanical and electrical equipment normally associated with movable bridges. To minimize the weight of the removable span unit and the required crane size, the 100 ft center span section was constructed of steel plate girders and a lightweight concrete deck. The innovative removable span bridge alternative proved to be a success on all levels: Reliability – Efficiency – Productivity – and Affordability. The cost was nearly 60 percent less than an upgraded ferry system and resulted in tens of millions dollars in savings compared to what it would cost to build a movable bridge. This cost-effective and unique solution provides a significant enhancement to the general interest and safety for the traveling public. The project directly improved safety, access, and the overall quality of the transportation system by replacing an outdated and inefficient ferry. The partnerships formed with the Reclamation District and EBMUD were essential to delivering a project that supports a vital local economic resource and critical infrastructure that serves multiple communities in the Northern California Megaregion.