Armorlite Drive Enhancements (Finalist)
Improvements to Armorlite Drive to become a multi-model complete street. The improvements consist of enhanced walkways, bike racks, street furnishings, tree wells, parking, pedestrian lighting, bioswales for storm water treatment, and a Class 1 bike path on the north side of the street. Traffic calming measures consist of reduced travel lane widths, on-street parking, median, chicane, and mid-block pedestrian crossings with rapid flashing beacons. The enhanced roadway serves as the frontage road for recent mixed-use developments (Palomar Station and Davia). The new bike path provides connectivity between the Inland Rail Trail on West Mission Road, Palomar College Train Station, and Mission Sports Park.
Add Comment